District Five Upcoming Projects

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Titusville to Edgewater Bike Loop PD&E Study
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
November 14, 2014 District Construction Season.
Welcome.
DISTRICT 1 November 2014 DONNIE DREWER DISTRICT ENGINEER.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Leadership Summit Cheiko High, Deputy Commissioner, CDOT.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
November 20, 2013 District Construction Season.
1 I-75 Reconstruction Welcome! Those wishing to make an official comment concerning any of the projects presented this evening.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
Denver Area Transportation Issues and the Future of Transit Development in the Denver Metro Area Sertoma Club January 12, 2012.
Public Works Department FY Budget Challenges February 16, 2010.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
District Five Upcoming Projects. Structures Estimated Value AA MD 648AA Over Cattail Creek500K – 1M CA MD 261 Over Fishing Creek 15M – 30M.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
A PRESENTATION BY THE DISTRICT 1 COMMUITY COUNCIL SIDEWALK TO BATTLE CREEK REC.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Caltrans District 4 All information presented here is an estimate; It is preliminary and subject to change. SMALL BUSINESS OUTREACH FOR CONTRACTORS March.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
Stormwater Management
Transportation Engineering Business Development Workshop Department M
Hesperian Boulevard Corridor Improvement Project San Lorenzo
Chapin Town Hall Meeting
US 92 Pedestrian Connectivity & Safety Assessment Study
District 3 Complete Streets Projects
Region 4 Managers Meeting May 11, 2016
Work Zone Safety Review – District 1 - Duluth
Kerr Tar Project Update – June 2016
Traffic Engineering Division Nestor A. Flores, P.E., PTOE
US 92 Pedestrian Connectivity & Safety Assessment Study
DISTRICT 1 ADVERTISED PROJECTS
Transportation Projects
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 16, 2018.
Highway 169 Bridge Replacement & Pavement Resurfacing
2018 Maryland Highway Safety Summit
District Three Approach
Update on Kings Highway Corridor
Marin-Curtis Safe Routes to School
District Construction Season
Contract 60X10 Informational Meeting Weber I-55
DDOT Western Avenue, NW Project
Commissioners Presentation
Guess What Town?.
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
2019 Construction Season Preview
Presentation transcript:

District Five Upcoming Projects

Structures Estimated Value AA7585180 MD 648AA Over Cattail Creek 500K – 1M CA4805180 MD 261 Over Fishing Creek 15M – 30M SM3665180 MD 5 Over Eastern Branch 2.5M – 5M

Intersection Improvements Estimated Value AA2785187 MD 2 at Earleigh Heights Road/Magothy Bridge Road 5M – 10M SM2165176 MD 4 from MD 235 to Patuxent Boulevard 2.5M – 5M AA5805670 MD 175 at Reece Road and Mapes Road – BRAC 10M – 15M AA2695130 MD 2 at Owensville Sudley Road 2.5M – 5M AA4915130 MD 2 at MD 256 1M – 2.5M CA3825176 MD 2 at Mount Harmony Road 2.5M – 5M AA2705130 MD 2 at Harwood Drive 1M – 2.5M

System Presevation Estimated Value AA1605177 MD 2 at MD 214 Concrete Overlay/Full-Depth Replacement 500K – 1M XY4025177 Area-Wide Resurfacing in Northern Anne Arundel County 5M - 10M XY4025277 Area-Wide Resurfacing in Southern Anne Arundel County 5M – 10M XY4045177 Area-Wide Resurfacing in Calvert County 5M – 10M XY4085177 Area-Wide Resurfacing in Charles County 5M – 10M XY4185177 Area-Wide Resurfacing in St. Mary’s County 5M – 10M

Pedestrian and Bicycle Improvements Estimated Value AA1375133 MD 424 from MD 3 to MD 450 1M – 2.5M XX6675133 District-Wide Sidewalk Retrofits 2.5M – 5M Traffic Barrier AA1575132 MD 10 from MD 177 to MD 695 1M – 2.5M XY2375577 District-Wide Traffic Barrier Improvements 500K – 1M Drainage Improvements AX9315174 MD 32 from Sappington Station Road to MD 175 1M – 2.5M AA1665182 I-97 Southbound West of East-West Boulevard 500K – 1M

Signalization and Lighting Estimated Value XY2385285 District-Wide Signalization 2.5M – 5M XY1625185 District-Wide Lighting 1M – 2.5M AA1635185 Lighting at I-695 Interchanges with I-895 and MD 2 1M – 2.5M Environmental AT0685482 Tree Planting at Various Locations in Anne Arundel 1M – 2.5M and Charles Counties AA8955182 MD 665 Broad Creek Stream Restoration/Wetlands 1M – 2.5M Replacement