Institute of Energy and Sustainable Development HVAC S YSTEMS E NERGY D EMAND VS. B UILDING E NERGY D EMAND I VAN K OROLIJA I NSTITUTE OF E NERGY AND S.

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

Chapter 3. HVAC Delivery Systems
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
BUILDING AIR CONDITIONING
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2J: Building.
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
Page 1 Peng Xu, Philip Haves, James Braun, MaryAnn Piette January 23, 2004 Sponsored by the California Energy Commission and the California Institute for.
eQuest Quick Energy Simulation Tool
HEALTHCARE BUILDING AUTOMATION
Heating, Ventilating, and Air-Conditioning
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Tas seminar/demonstration on Part L 2006 of the Building Regulations Presented by Alan Jones EDSL February
TYPES OF MECHANICAL SYSTEMS
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
University of Liège Faculty of Applied Sciences Thermodynamics Laboratory Workshop “Commissioning and Auditing of Buildings and HVAC Systems” Use of a.
The Three Tiered Philosophy
TRANSSOLARKLIMAENGINEERING BCIT NE01 Energy Upgrade and Retrofit Study Result Summary.
Sustainable Hotel Design Group 5 Presentation 4 Demand/Supply Matching.
BRE Energy Efficient Office of the Future
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Announcement Course Exam October 6 th (Thursday) In class: 90 minutes long Examples are posted on the course website.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Objectives Finish with Multizone Systems
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
Energy use in buildings Dr. Atila Novoselac Associate Professor Department of Civil, Architectural and Environmental Engineering, ECJ
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
BEM CLASS 5 Building Thermodynamics – 2 Air-conditioning Load Calculation – latent heat, solar and internal gains.
Important variables Water: Air: Conversion:
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Building Simulation. BMEABMEA uilding odeling nergy nalysis.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Energy conservation strategies Buildings energy consumption depends on building envelop, efficiency of HVAC and lighting systems, amount of required fresh.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
Announcements 1) Thursday 02/09 In class Midterm Exam - I will be in the classroom at 9:20 AM - Example and solution are posted on the course website 2)
Lecture Objectives: -Discus Final Project -Learn about Solar Systems -HW3 (final HW assignment) -HVAC system.
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Development of a new Building Energy Model in TEB Bruno Bueno Supervisor: Grégoire Pigeon.
Development of a new Building Energy Model in TEB Bruno Bueno Grégoire Pigeon.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Lecture Objectives: Differences in Conduction Calculation in Various Energy Simulation Programs Modeling of HVAC Systems.
Lecture Objectives: Analyze several modeling problems –Examples from the final project list Economizer Solar collectors Phase change thermal storage materials.
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
Back to Basics Engineering Seminar Thursday, 10 November 2011.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Heat transfer Steady state conditions not for dynamic systems in buildings through walls, roofs, floors, windows, doors building structures and U-values.
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Announcement Developing Concrete with a Structural and Thermal Insulation Performance and Homogenous and Stratified Approach Dr. Mauricio Lopez.
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Types of HVAC Technology Used in Business Establishments
Lecture Objectives: Discus Final Project Learn about Solar Systems
Lecture Objectives: Answer questions related to HW 4
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Answer questions related to HW 4
Chilled Beam Performance:
Objectives Discuss Project 1 (eQUEST) Learn about HVAC Systems
Frenger “Radiant” chilled beam performance at 1 Shelly St - Sydney
October 31st In class test!
Case Study: Marks & Spencer Oxford Street
Lecture Objectives: Discus Final Project Learn about Solar Systems
Lecture Objectives: Discuss HW4 parts
Announcements Exam 1 Next Class (Thursday, March 14th):
Objective Revie the Cooling Cycle Learn about air distribution systems
Presentation transcript:

Institute of Energy and Sustainable Development HVAC S YSTEMS E NERGY D EMAND VS. B UILDING E NERGY D EMAND I VAN K OROLIJA I NSTITUTE OF E NERGY AND S USTAINABLE D EVELOPMENT D E M ONTFORT U NIVERSITY, L EICESTER, UK DMU. AC. UK

Institute of Energy and Sustainable Development I NTRODUCTION Building size/shape Building fabrics Glazing percentage / characteristics Shading etc… Internal gains Office space arrangement Daylighting Occupancy Temperature setpoints etc… Heating sources: Boilers (gas, coal, biomass, liquid fuel…) District heating Cooling sources: Chillers (air-cooled, water-cooled, thermally driven) District cooling Renewables Heating, Ventilating and Air Conditioning (HVAC) System

Institute of Energy and Sustainable Development O VERVIEW Building model description Analysis of building cooling/heating loads HVAC system models description Analysis of HVAC system models simulation outputs

Institute of Energy and Sustainable Development B UILDING M ODEL Square plan office building Three-story high 22.5 x 22.5 m footprint 3.5 m floor-to-ceiling height Each floor is divided into four zones: Zone 1 (open office) Zone 2 (common spaces) Zone 3 and 4 (cellular offices) Glazing amounts 50% of external wall area Building fabrics comply with the latest UK standards Building Elements U-value [W/m 2 K] External Wall0.35 Flat Roof0.25 Ground Floor0.25 Glazing2.10

Institute of Energy and Sustainable Development B UILDING M ODEL Indoor thermal condition: Controlled by dual setpoint thermostat. Occupied hours (weekdays between 7am and 7pm): -Offices: heated to 22°C or cooled to 24°C; -Common spaces: heated to 20°C or cooled to 26°C. Setback temperatures: -Heating period: 12°C in the whole building -Cooling period: offices: 28°C; common areas: 30°C Chilled Ceiling system: Cooling setpoints +2°C

Institute of Energy and Sustainable Development B UILDING M ODEL Internal heat gains:OpenCellular Occupants: (density) 108 W/m 2 (9 m 2 /person) 108 W/m 2 (14 m 2 /person) Office Equipment:15 W/m 2 10 W/m 2 Artificial Lighting:12 W/m 2 Daylight control is implemented in office zones Illuminance target: 500 lux Fresh air requirements and infiltration rate: Fresh air requirements: 10 l/s per person Infiltration rate: 0.3 ach

Institute of Energy and Sustainable Development C OOLING /H EATING D EMAND Cooling/heating demands are calculated by taking into consideration standard heat gains/losses which are: Transmission heat gains/losses through building envelope elements, Solar heat gains through glazed areas, Internal heat gains/losses from artificial lighting and office equipments, Infiltration air heat gains/losses, and Fresh air ventilation heat gains/losses. Simulation Software: EnergyPlus v.4.0 Weather file: London Gatwick

Institute of Energy and Sustainable Development C OOLING /H EATING D EMAND Cooling/heating seasons Higher cooling demand Equipment electricity demand – constant profile Light electricity demand – varies by the time of the year

Institute of Energy and Sustainable Development HVAC S YSTEM M ODELS How do typical HVAC systems handle different building loads? All-Air systems with zone reheating boxes: Variable Air Volume System (VAV) Constant Air Volume System (CAV) VAV System Main H/C coils are controlled by t sa Reheating boxes are controlled by t za (reverse dumper action) CAV System Main H/C coils are controlled by variable t sa Reheating coils are controlled by t za Economizer Box Constant Air Volume System (CAV) Variable Air Volume System (VAV)

Institute of Energy and Sustainable Development HVAC S YSTEM M ODELS Air-Water systems with dedicated air: Fan-coil System (FC) Chilled Ceiling System (ChCeil) Both systems operates with 100% fresh air FC System Main H/C coils are controlled by t sa Four-pipe fan-coil units controlled by t za ChCeil System Main H/C coils are controlled by t sa Increased cooling setpoint by 2°C Embedded chilled water pipes Radiators for heating Heat Recovery Unit Chilled Ceiling System (ChCeil) Fan-coil System (FC)

Institute of Energy and Sustainable Development E NERGY D EMAND OF S YSTEMS Equipment and lights electricity demand, Heating energy demand, Cooling energy demand, and Auxiliary equipment electricity demand.

Institute of Energy and Sustainable Development S YSTEM H EATING D EMANDS System heating demands lower than building heating demand mainly due to: 1.Decreased ventilation losses 2.Additional heat gains from fans and pumps All-air systems - mixing a warm return air stream with a cold outdoor air stream to maintain desired setpoint Air-water systems – using a heat recovery units with 75% eff.

Institute of Energy and Sustainable Development S YSTEM C OOLING D EMANDS All-air systems performs so well because of the usage of free cooling Air water systems suffer from limited free cooling which is even more decreased by supply air temperature setpoint - The influence of dissipative heat gains cannot be neglected ChCeil slightly better than FC due to 2°C higher cooling setpoint which results in a reduction in the building fabric and ventilation cooling loads.

Institute of Energy and Sustainable Development S YSTEM A UXILIARY E NERGY D EMANDS The auxiliary energy consumption is often overlooked when discussing building energy consumption All-air systems have much higher consumption when compared with air-water systems -Mainly due to higher fan consumption The worst system, in terms of auxiliary energy consumption, is the CAV system due to constant operation at maximum air flow rate which results in enormous fan consumption.

Institute of Energy and Sustainable Development S YSTEM A UXILIARY E NERGY D EMANDS By introducing variable flow rate in the VAV system, fan consumption is more than halved. Due to lower cooling demands, all-air systems also have lower pumps consumption. ChCeil system requires slightly less energy for auxiliary equipment, mainly due to usage of zone passive heating and cooling equipment (radiators and embedded pipes).

Institute of Energy and Sustainable Development C ONCLUSIONS The presented results clearly indicate that in buildings serviced by HVAC systems, it is inappropriate to evaluate building energy performance based only on its heating and cooling loads. For the four investigated HVAC systems (VAV, CAV, FC and ChCeil) the difference between system demand and building demand varied from over -45% to +35% for cooling and between -10% and -70% for heating. The auxiliary energy consumption of the HVAC systems should not be overlooked.

Institute of Energy and Sustainable Development T HANK Y OU … ? DMU. AC. UK