Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Improving Collimator Setup Efficiency LHC Beam Operation Committee, G. Valentino, R.W. Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, S.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Ion Commissioning: Thursday & Friday
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday 14th March Second fill with pilot + 3 nominal bunches
Monday 11/07: Recovery Plenty of accesses.
Saturday 30th June - Sunday: Rocky !
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Machine availability reaching well over 80%
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Monday – recovery from MKI flashover
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Wed :40 Lost S78 - QPS controller.
Saturday 2/4/ :00-09:00 Problems with SPS:
LHC Operations overview Week 28 – Getting back
Week 35 – Technical Stop and Restart
Monday February 28th 8h00: Injection
Friday morning 10:30 Optics measurements and corrections.
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Monday 24 October hours of 25ns MD
Saturday Nov Stop proton operation. Switch back to ions
Improving Collimator Setup Efficiency
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Collimation qualification during the first weeks of the 2011 run
MD Planning Fri – Sat (1. – 2.7.)
Summary for LPC (March 7th, Ralph Assmann)
Monday :15 fill 3523 dumped by BPMs IP6
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Tuesday 20 September 2011.
Fri :52 Stable beams fill #2536
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Tuesday
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals 11:10 Loss maps at 3.5 TeV: Ralph says OK 12:45 Check relative position TCDQ – TCSG B2 14:45 Collimator position checks at injection 18:15 In parallel scraping of full beam TCDQ – TCSG 21:00 RF phasing 22:00 BLM 2.5 V problem -> replace this morning 23:00 Asynch dump injection 24:00 Asynch dump at 3.5 TeV 04:00 Loss maps at injection 07:00 Check injection of trains, 12 & 36 bunches 09:00 Access – 2 hours 14/07/2011 LHC 8:30 meeting

Lumi’s ok for 2 bunches 14/07/2011 LHC 8:30 meeting

Loss maps 3.5 TeV look ok – H B1 14/07/2011 LHC 8:30 meeting

Frequency trim up 14/07/2011 LHC 8:30 meeting

Check relative position TCDQ - TCSG measure an average offset between TCDQ and TCSG setting of 0.6 mm +/-200um for the same absolute setting in mm we measure with the bump height that the TCDQ is further out than the TCSG whereas in 10-March-11 the TCDQ was further IN (!) than the TCSG --> so now the TCDQ should be set further in by this offset measurement from 10-March-11 shows an average offset of +250 um while measurement from today shows -600 um Crosscheck of TCDQ settings with scraping full beam with TCDQ and TCSG 14/07/2011 LHC 8:30 meeting

TCDQ – full beam scraping Full beam scraping with TCSG left jaw and TCDQ Find consistent results with measurement performed earlier today offset corrected from 600 um to 500 um (TCDQ jaw too far out) new TCDQ.B2 settings: 450 GeV 15.54 mm 3.5 TeV 6.29 mm put in TCDQ jaw closer in to the beam --> safer for MP TCSG settings remain where they are Generate new TCDQ function W.Bartmann, C.Bracco, B.Goddard & collimation team 14/07/2011 LHC 8:30 meeting

Check of collimator position checks Check of list of “suspect” collimators: TCSG.A4R7.B1 TCLA.D6R7.B1 TCL.5R1.B1 TCLA.7R3.B1 When compared to the centres found during the Feb/March 2011 setup, variations were recorded up to 200um. In measured beam sigma, the differences are about 0.3 throughout. Worries about not having scraped with TCP for the measurement Cross-checks B1: little effect found Concluded: collimators OK The parallel setup function was tested, which automates the recognition of the spike origin, and it worked very well TCSG.4L3.B2 TCLA.7L3.B2 TCP.C6R7.B2 TCLA.A7L7.B2 TCTH.4R5.B2 Adriana Rossi, Gianluca Valentino 14/07/2011 LHC 8:30 meeting

RF cavity phasing The problematic cavity 2B2 is back with original settings (both tuner and polar loop). The cavity loop was actually unstable with the new setting (60 deg/6dB problem after the Sunday's power cut). We still need to check the Icfwd signal path in UX45 (there is an access tomorrow morning). Apart of that the cavity phasing was good for Beam 2 (+/-1 degree). We needed to adjust C3B1 by 9.5 degrees and C4B1 by -4.5 degrees. Now all Beam 1 cavities are in phase within 0.25 degree. Daniel Valuch, John Molendijk 14/07/2011 LHC 8:30 meeting

Check of new TCDQ functions Asynch dump at injection Ratios: Losses TCT-TCDQ beam 1: max 4.71e-6 Losses TCT-TCDQ beam 2: max 5.89e-4 (at the triplet in point 5, others around 1e-6) Loss ratio should be max some 1e-3. Asynch dump at collision, 3.5 TeV Ratio TCT-TCDQ beam1 2.4e-4 beam2 5.7e-4 Should be in the order of some 1e-4: OK 14/07/2011 LHC 8:30 meeting

Loss maps at injection With and without injection protection, all transverse and all off momentum. They still need analysing by the experts. Nothing obviously wrong 14/07/2011 LHC 8:30 meeting

Plan 09:00 Access for 2 hours, Driven by water cooled cables point 8 Go for stable beams and ramp up number of bunches 48 bunches per beam New fill pattern for satellite on main collisions in ALICE: pilot NOT over-injected, 250ns SPS gaps MKI pulse length might need increasing Keep in stable beams for 3 hours Default is to continue with the satellite collision scheme (unless requested otherwise by ALICE): 50ns_264b_249_0_240_36bpi8inj (1 fill) 50ns_840b_807_0_816_108bpi12inj (1 fill) 50ns_1380b_1331_0_1320_144bpi12inj.txt (luminosity production) 14/07/2011 LHC 8:30 meeting