CSC Turn ON Status Report by Fred B.

Slides:



Advertisements
Similar presentations
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Advertisements

1 Burn-in Viewer User’s Guide Version 2.0 February 17, 2005 LukasTomasek
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
LV and HV status of the RPC system RPC detector and trigger group.
Dimuon Forward Spectrometer May 2008 Cosmic Run Day by Day report Interesting runs.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
28 Jan 2009G. Rakness (UCLA)1/15 Overview of What Was Done Last Week… Worked with Alex M. to measure ALCT turn-on curves –See next slides… Obtained values.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
Adapting Muon Endcap UF/PNPI HV system for GEM V. Barashko, A. Korytov, A. Madorsky, G. Mitselmakher University of Florida/Physics N. Bondar, V. Golovtsov,
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
A Low Voltage Problem Seen by TMB Greg Rakness University of California, Los Angeles CSC Operations + DPG Meeting 28 July 2010.
22-March-2010CSC DCS Instructions1 Top Level of CSC DCS UI Communication Status Majority Logic Subsystem Panel HV, LV, FEDS CSC End View * CSC * PCrates.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Preparation for TS3 Mariana Rihl. Known issues Implications on light leaks on all modules – Visible on current feedback of bias – Confirmed by study performed.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
University of Colorado – Boulder
Pre-Processing electronics Maintenance Hardware - Firmware
University of Wisconsin
SLSP activated well on April 7th
LKr status R. Fantechi.
Recall: CSC TF Halo rate spikes during run (23 May)
904 Status Recall last Group Meeting…
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
Vito Palladino Straw Working Group 23/3/2015
RICH Status from last RICH meeting
Week coordinator report - C. Marchand
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
The Ohio State University
B904 Status Report by Fred B.
CSC Trigger Primitives Test Beam Studies
B904 Status Report by Fred B.
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Fred’s Input to Rice Workshop
RPC HV-LV project Introduction System requirements and description
Schedule after Shutdown
Pierluigi Paolucci & Giovanni Polese
Configuring the Peripheral Crates
7th Grade Math Warm-ups Week of October 3-7, 2016.
Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova,
CSC Status Report Status reports;
CSC DSS Status Report by Fred B.
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Electronics Problem Report CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
CSC Shift Training and Operation + B904 Status
Presentation transcript:

CSC Turn ON Status Report by Fred B. 19-April-05 CSC Turn ON Monday Most* turbines on after problem Turned on HV Alex with expert tool Turned on ME1/1 HV Victor *Breaker fixed for Turbines – can turn on LV Monday ELOG excerps summary: With Alex using his expert tools and Fred as scribe, the HV was turned on for all of CSC except ME1/1   Only a few single channels showed any problems, Alex diagnosed them as regular type problems. After this exercise, Victor turned on the ME1/1 HV, with no problems seen up to 2kV ----------------------------------------------------------- This morning, no turbines were operational in UXC due to things happening over the weekend. By noon, they were turned on by Sylvestre, and checked to be all running for CSC by Armando. After lunch, we will begin attempting to power up the system using the HV expert tool. 13:50 - Using the expert tool, Alex turns on ME-4 to 50 V.  Imon max (uA scale) = 0.1 seen on two chambers, ME-4/1/3 and ME-4/1/12.         LIkely a problem with calibration at low voltage settings.  "Imon min/max"=minimum/maximum current on the channels within this chamber 13:54 -> ME-4 to 1000V, ramp rate=5V/sec, ramp-up trip max=10uA, nominal trip max=1uA.  All OK. 14:13 -> ME-4 to 3600V - all current at 0.0 - leave on 14:35 -> ME-3 to 3600V - OK 14:37 have some chambers on ME-2 that share distribution boards with Me-3 and are on, currents are OK for these 14:58 -> ME-2 to 3600V - OK but -2/2/6 one channel  has curent, but is a known problem     Leave all of -2,3,4 at 3600V 15:22 -> ME+4 to 3600V - OK  15:43 -> ME+3/2 to 3600V - OK 16:10 -> ME+23/1 to 500V -  OK, one channel out of calibration+3/1/03, ch17 below voltage, but current is 0 16:32 -> ME+23/1 to 3600V - +2/2/35 ch 25 tripped, may be a known problem 17:18 -> ME-1/2 to 3600V - OK Now turn on those chambers we know got wet 17:41 -> ME+1/3 to 3600V - OK 17:43 Victor calls he will begin on ME-1/1, 17:58 2kV no trips, 18:00 2.5kV no trips 18:10 3000V OK 18:02 -> ME-1/2 to 3600V - OK All of the UFHV is at 3600, Two single channel trips in minus end. -3/2/25, -2/2/35. not leaks 18:10 Victor will begin on the ME+1/1, 2000V OK, 18:30 Turing the UFHV off.  Alex will address some of the single channell problems. 19:00 both the ME+/-1/1 CSC are at nominal (3.0kV) HV. No trips, normal current. 20-Apr-19 CSC Turn ON Status Report by Fred B.

CSC Turn ON Status Report by Fred B. 19-April-05 CSC Turn ON Tuesday Turned on LV to +/- 2, 3, &4 New software tools installed and tested FE board by board Turn on chamber by chamber Evaldas, Jinghua, Misha Wednesday Turn on +/- 1 Turn on FE board by board Status to date No problems that are water related seen Can be fairly confident of this Tuesday ELOG excerps Blue page was disabled, otherwise it would do a power up init each time a pcrate was powered on,  and a power up init would turn on all the chambers for a pcrate.  11:04 Turned on VME-4/1 all three chambers, the first chamber was turned on board by board.  The currents and voltages looked OK with just one CFEB of one CSC on.  Regulation looked ok.  Could also see the status of the single board. Will proceed over station -4 chamber by chamber. 11:07 -4/5 on OK 11:14 -4/2,3,4 pcrates are on, chambers are off, everything looks OK 11:19 all the chambers on ME-4 are on, OK 11:21 CFEB2, -4/1/18 5V current reads 1.25 should read 0.93.  only anomoly seen 11:34 starting -3/1, OK 11:43 start -3/2, OK 11:55 -3/3  OK 12:04 -3/4 OK 12:09 -3/5  OK 12:17 -3/6 OK, NOTE the LV is being left on as we progress, stations -4 and -3 ON and OK 12:51 return from break, start -2/1, -2/2/07 the DMB has a problem, hard reset fixed it. 13:06 -2/1 OK 13:11 -2/2 OK 13:23 -2/3 low current on all ALCTs, tried hard reset and powerup-init - after those current goes to normal and then back to low. Configured TTC - ALCT current back to normal. 13:31 -2/4 OK 13:33 -2/5 OK 13:39 -2/6 OK - station -2 all ON and OK 13:48 -Stations -2 and -3 have been switched on and OK 14:05 Turning On +4. +4/1/11 DMB firmware bad, tried hard reset and re-download of DMB firmware, not fixed 14:32 +3/3, CFEB4 on 3/1/8 has low current, re-download firmware 14:38 +3/4 OK 14:43 +3/5 3/2/31 CFEB5 has problem 14:53 +3 station finished OK 15:00 +2/1 OK 15:01 +2/2 OK 15:08 +2/3 +2/1/08 CFEB2 current reading low.  seems to be a bad reading of current 15:20 +2/4 OK 15:33 +2/6 2/1/01 CFEB5 (known dead), 2/2/34 CFEB3 low current 15:38 finished + and - Station 2,3 and 4 - problems that are not understood.  Leave +- 1 for tomorrow morning . 20-Apr-19 CSC Turn ON Status Report by Fred B.

CSC Turn ON Status Report by Fred B. 19-April-05 Summary Very boring – which is GOOD Thanks to all 20-Apr-19 CSC Turn ON Status Report by Fred B.