Overview: ICS Evaluation Procedures

Slides:



Advertisements
Similar presentations
The Managing Authority –Keystone of the Control System
Advertisements

ISO 9001:2000 Documentation Requirements
Learning and Development Evidence Collection Planning January 2015.
Quality Management Dr. S.W. Poon. Quality Management Introduction Meaning of quality Quality Control (QC) Quality Assurance (QA) Differences between QC.
SQA Architecture Software Quality.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
5.2 Personnel Use competent staff Supervise as necessary
Fundamentals of ISO.
SQA Architecture Software Quality By: MSMZ.
Quick Guide to help your transition
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
INTRODUCTION TO AUDITING
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Perform visual inspection tests.
Principles of Smallholder Group Certification A central body ensures the compliance of all smallholder Farmers with organic standards Group has a formal.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Internal Auditing ISO 9001:2015
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
ASPEC December 2015 Incidents –0 incidents, 0 near misses Hours 28/11/15-25/12/15 12% Site, 0.5% Travel, 78% Office.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
GROUP CERTIFICATION: THE INTERNAL CONTROL SYSTEM Istituto per la Certificazione Etica ed Ambientale.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
(3.6) General requirements on resources for the establishment of IMS
Hans Nieuwlands CIA CGAP CCSA CEO IIA Netherlands
Internal Audit & Accounting Systems Review
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Internal Control Principles
Clean Plants Internal Auditor Basic Training
Software Quality Control and Quality Assurance: Introduction
External Verification Report 2014/15
How to Survive an External Quality Assessment
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Fundamentals of ISO.
UNIT V QUALITY SYSTEMS.
Enterprise Content Management Owners Representative Contract Approval
Temporary Works Co-ordination
ASPEC May 2016 Incidents 0 incidents, 0 near misses
Quality Management Systems – Requirements
Internal Controls.
LAW ENFORCEMENT SUPPORT TO ACCOUNTABILITY COURTS
Management Verifications & Sampling Methods
ASSISTANCE DOGS INTERNATIONAL ACCREDITATION PROCEDURES 2018
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
CDE Transportation Unit
Internal Audit Training
Inspection and Review The main objective of an Inspection or a Review is to detect defects. (Not for Giving Alternative Solutions) This activity and procedure.
ASPEC November 2015 Incidents 0 incidents, 0 near misses
Management Verifications & Sampling Methods
Implementing the use of standards and establishing an inspection system Dr Agr Kristina Mattsson Anapa, Russia, October 2010.
QA Reviews Lecture # 6.
Inspection of Buying/Selling and Handling
Inspection of the Internal Control System in the ICS Office
Training Course in the Evaluation of Internal Control Systems (ICS) for Smallholder Group Certification © IFOAM, October 2004 Authors: Florentine Lechleitner.
Inspection Schedule & Risk Assessment
Objectives of External Farm Re-Inspections
Reporting The overall findings of the ICS inspection are summarized during the inspection in the inspection report form. Usually this means that the report.
Internal Inspection Each registered farmer is inspected by the internal control at least once a year. The inspection is documented.
Steps towards Certification
5.6 ICS Documentation Certain documents must be kept for each farmer and on ICS level (as detailed in the ICS Manual 5.6). These records are inspected.
ICS Staff One person is responsible for overall ICS and can delegate the responsibilities so that for each procedure or task of the ICS, one person is.
Training Is Important The training of ICS staff and farmers is an important part of the ICS process. The objective is to provide farmers and project staff.
Risk Management Risks that may jeopardize the organic quality must be known and taken into account in all internal procedures Initial risk assessment has.
5.2 Internal Inspections The internal inspection is a critical component of the ICS process. The internal inspection is the formal verification that the.
Why are Yields Estimates Necessary?
The Internal Audit Cycle
Why is organic certification needed?
Where Do We Want To Go? The ICS is an important tool that can be used not just to provide a set of rules for compliance for an organic project but also.
Internal Controls.
Internal Controls.
Presentation transcript:

Overview: ICS Evaluation Procedures Application for certification Inspection planning with preliminary risk assessment, determination of re-inspection rate, & inspection schedule Preparation of inspection Receiving the report back Evaluation & certification Follow up on non-compliances Preparation of inspection Inspection schedule: selection of farmers, details of inspection schedule Risk assessment Inspection of ICS office Sample farm inspections Product flow inspections buying, processing, export Reporting & evaluation of non-compliances (during inspection and afterwards)

On-site ICS Inspection Inspector ICS Office and Staff Farm Re- Inspections Internal Farm Inspection Risk Assessment & Inspection Schedule

Inspection Schedule & Risk Assessment Requirements for group certification are fulfilled and basic ICS in place. Preliminary risk assessment Preliminary decision on external control rate and scope/focus of inspection. Screening of project description, ICS Manual and all ICS forms  preliminary analysis of potential weak points and critical control points Risk Assessment to confirm re-inspection rate and to finalize list of critical control points Definition of detailed inspection schedule with selection of farmers for re-inspection Usually during inspection

Inspection of ICS Office General overview of activities, changes since last year. Follow up last year’s conditions Clarify questions on ICS Manual and procedures Inspection ICS office Screen sample farm files Approval & sanction procedures, any sanctions? Staff files and qualifications, conflicts of interests Farmers list, list updating system

Farm Re-Inspections Compliance check of farming & processing activities Farmers’ knowledge and awareness Cross-check ICS documentation Farm Re-Inspection Risk assessment & information from other sources How is advice and internal inspection actually done? Quality of internal inspection (effective?) Cross-check with buying lists Farm re-inspection report forms are used for these external farm inspections

Inspection of Buying/Selling and Handling Farm production, on-farm processing Buying General Handling and storage Processing Selling/ Buying Ware-housing Processing Farm 1 Farm 2 Farm 2 Export Must be under supervision of the ICS

Reporting ICS inspection report is completed. Report serves as checklist during inspection (usually completed by hand). Findings of the inspection discussed with ICS Manager. ICS Manager has to countersign the report. If needed, the same format is used after the inspection to prepare the complete report electronically with more details/descriptions.

Evaluation of Non-conformities Compliance criteria have different levels of importance: A: Major MUST B. Minor MUST to be implemented short term C: Minor MUST to be implemented medium term D: Recommendation What should be done if .... ... ICS has not completed 100% internal inspection? ... ICS has failed to detect minor or major non-compliances? ... ICS is formally incomplete/not well documented?

Certificate for the group Certification Organic Certificate + Certified farmers list Certificate for the group Group XXX Address - Soil erosion must be controlled better - check of previous farming practices to be improved - better training for inspectors - receipts have to be given to farmers - farm maps to be improved Certification decision with necessary corrective measures

Introduction of the new harmonized evaluation system Each certifier will probably adapt this standard system to its particular inspection & certification system and may add additional requirements or chose lower standards for some aspects. This applies in particular to all aspects checked on farm level for which each certifier will have its own interpretation of the requirements. It is suggested that, in the first year of the introduction of this new inspection system and the harmonized certification requirements, all ICS operators should be handled as “new operators” or “first inspections”. This implies that they are expected to fulfill fewer requirements and that slightly higher re-inspection rates are recommended. European import authorities may need time to internally familiarize themselves with the new ICS system and the new minimum control rates. Certifiers need to feel on the safe side that lower control rates will still ensure easy market access for their clients.