Release and deployment process Working Group

Slides:



Advertisements
Similar presentations
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Torsten Antoni – LCG Operations Workshop, CERN 02-04/11/04 Global Grid User Support - GGUS -
Advertisements

LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
EMI INFSO-RI EMI Quality Assurance Processes (PS ) Alberto Aimar (CERN) CERN IT-GT-SL Section Leader EMI SA2 QA Activity Leader.
EGEE ARM-2 – 5 Oct LCG Security Coordination Ian Neilson LCG Security Officer Grid Deployment Group CERN.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
CERN – Roberta Faggian Marque, Jan Fiete Grosse-Oetringhaus GRACE General Meeting, September 2004, Brussels 1 D6.1 Integration with the European DataGrid.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
EGEE is a project funded by the European Union under contract IST JRA1-SA1 requirement gathering Maite Barroso JRA1 Integration and Testing.
EGEE is a project funded by the European Union under contract IST User support in EGEE Alistair Mills Torsten Antoni EGEE-3 Conference 20 April.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
EGEE is a project funded by the European Union under contract IST Support Operation Challenge – 1 SOC-1 Alistair Mills Torsten Antoni ARM-4,
INFSO-RI Enabling Grids for E-sciencE Integration and Testing, SA3 Markus Schulz CERN IT JRA1 All-Hands Meeting 22 nd - 24 nd March.
Certification and test activity IT ROC/CIC Deployment Team LCG WorkShop on Operations, CERN 2-4 Nov
EGEE is a project funded by the European Union under contract IST EGEE Services Ian Bird SA1 Manager Cork Meeting, April
How to Read gUSE Documents Orange Docs Series for General Pruposes RELEASE ISSUE POLICY LICENSE HOW TO READ GUSE DOCUMENTS GUSE IN A NUTSHELL by Tibor.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Antonio Retico CERN, Geneva 19 Jan 2009 PPS in EGEEIII: Some Points.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The future of the gLite release process Oliver.
INFSO-RI Enabling Grids for E-sciencE An overview of EGEE operations & support procedures Jules Wolfrat SARA.
Certification and test activity ROC/CIC Deployment Team EGEE-SA1 Conference, CNAF – Bologna 05 Oct
Last update 29/01/ :01 LCG 1Maria Dimou- cern-it-gd Maria Dimou IT/GD CERN VOMS server deployment LCG Grid Deployment Board
EMI INFSO-RI Software Quality Assurance in EMI Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks User Support for Distributed Computing Infrastructures.
EGEE ARM-2 – 5 Oct LCG/EGEE Security Coordination Ian Neilson Grid Deployment Group CERN.
EGEE is a project funded by the European Union under contract IST ARDA Project Status Massimo Lamanna ARDA Project Leader NA4/HEP Cork, 19.
INFSO-RI Enabling Grids for E-sciencE gLite Certification and Deployment Process Markus Schulz, SA1, CERN EGEE 1 st EU Review 9-11/02/2005.
INFSO-RI Enabling Grids for E-sciencE Upcoming Releases Markus Schulz CERN SA1 15 th June 2005.
Status of gLite-3.0 deployment and uptake Ian Bird CERN IT LCG-LHCC Referees Meeting 29 th January 2007.
EMI INFSO-RI Testbed for project continuous Integration Danilo Dongiovanni (INFN-CNAF) -SA2.6 Task Leader Jozef Cernak(UPJŠ, Kosice, Slovakia)
INFSO-RI Enabling Grids for E-sciencE Software Process Author: Laurence Field (CERN) Presented by David Smith JRA1 All Hands meeting,
Integration TestBed (iTB) and Operations Provisioning Leigh Grundhoefer.
INFSO-RI Enabling Grids for E-sciencE GOCDB Requirements John Gordon, STFC.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
1 DIRAC Project Status A.Tsaregorodtsev, CPPM-IN2P3-CNRS, Marseille 10 March, DIRAC Developer meeting.
1 Grid Operations Jinny Chien ASGC June 09, Academia Sinica Slides adapted from the EGEE training material repository:
Scuola Grid - Martina Franca, Thursday 08 November Il Sistema di Supporto INFNGrid & GGUS ( Global Grid User.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks IT ROC: Vision for EGEE III Tiziana Ferrari.
INFN-Grid WS, Bari, 2004/10/15 Andrea Caltroni, INFN-Padova Marco Verlato, INFN-Padova Andrea Ferraro, INFN-CNAF Bologna EGEE User Support Report.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
CERN WLCG Grid Storage Systems Deployment Flavia Donno, CERN 6 November 2007 Organization of Storage Support through GGUS Flavia Donno CERN/IT-GD CERN.
CESGA QR2 SA1-SWE Partner Coordination Meeting 2 CICA, Sevilla
Il Sistema di Supporto INFNGrid & GGUS (Global Grid User Support )
Grid.It Grid Managers Tutorial
Regional Operations Centres Core infrastructure Centres
The EMT Oliver Keeble, SA3 CERN.
Operations Status Report
EGEE is a project funded by the European Union
Support Operation Challenge – 1 SOC-1 Alistair Mills Torsten Antoni
SA1 Execution Plan Status and Issues
Andreas Unterkircher CERN Grid Deployment
User Support Workflow in EGEE
Summary on PPS-pilot activity on CREAM CE
Brief overview on GridICE and Ticketing System
ATLAS support in LCG.
INFN – GRID status and activities
Savannah to Jira Migration
Testing for patch certification
The CCIN2P3 and its role in EGEE/LCG
Operating the World’s largest grid infrastructure
Short update on the latest gLite status
Maite Barroso, SA1 activity leader CERN 27th January 2009
Leanne Guy EGEE JRA1 Test Team Manager
ETICS Services Management
Nordic ROC Organization
LCG Operations Workshop, e-IRG Workshop
Pierre Girard ATLAS Visit
EGEE Operation Tools and Procedures
Site availability Dec. 19 th 2006
Presentation transcript:

Release and deployment process Working Group Łukasz Skitał Central European ROC

Introduction Objective: Timely deployment of new release in the regions Planning Seamless deployment at sites CERN, 19-20/06/2006

Deployment process planning Deployment PLAN SA1 (local cert.) SA1 (1st line support) (certification) SA3 Bugs submited next cycle deployment deployment (applic.) NA4 planning Experience “log” (to share among ROCs) RC admins RC admins Deployment PLAN (to share among ROCs) (release + docs) SA3 CERN, 19-20/06/2006

Topics to be discussed with SA3 Requirements from regional certification of middleware releases TSA1.2.2 and TSA1.1.2 Pre-production service site How can we divide work between them? PPS for earlier phases of releases, beta-versions Without central coordination: Regional certification for Release Candidate installation, stress testing, scalability testing? Contact in SA3 (was Laurence Field) Certification report form – what’s required for SA3 Scope of testing (services, functionality – to be discussed) Documentation/procedures Bug submission (how to do that? Savannah or GGUS) Bug mgmt (priotities, status) Release update plans (timetable, bugs be fixed) Detailed description of newly-introduced services (why are they here, who will need to install it) CERN, 19-20/06/2006

Topics to be discussed with VOs Topics to be discussed with VOs (NA4) Requirements for deployment planning Scheduled VO activites which should not be interrupted by the upgrade to new mw release Functionality at CIC portal for announcing data challenges: https://cic.in2p3.fr/index.php?id=vo&subid=vo_activity&js_status=2 (only biomed VO used that so far) Expected from a site supporting the VO: Software e.g. MPICH Services e.g FTS Middleware components, e.g VO BOX CERN, 19-20/06/2006