Estimated implementation time

Slides:



Advertisements
Similar presentations
SB 778 – Contests and Sweepstakes Mike Falasco Wine Institute.
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
No-Risk Cost Improvement Consulting Advanced Packaging Solutions, LLCwww.noriskconsulting.com.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 110/17/2014 V1.
How to apply to the Mayor’s Low Carbon Prize Include photos or create figures to support your arguments You can adjust the font-size, but no smaller.
ASHLOK Presents Safe Earthing Electrode (ASEEL)
Think In Innovation Open Innovation Innovation Project Challenge Idea Contest for Innovative Projects.
Business Objective Planning Assumptions Future Scenario Investment Analysis Danforth Manufacturing – Future View.
Introduction.  What is on your mind a lot?  What do you most like to spend your time doing?  For what will you prioritize time to make sure you can.
μMS³ μModular Substrate Sampling System μMS³ μ Modular Substrate Sampling System.
Graffiti Reporting A partnership of Local and State Government; My Local Services App enhancements.
Investing in a Transformed Market May 13, 2008 E/ME 103 Caltech Lecture.
EPSRC Collaboration Fund 23 June 2010 Sam Decombel Finance South East.
100302_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
Given Connections Solution
SBIR STTR Small Business Innovation Research & Small Business Technology Transfer at the National Science Foundation.
Bob Howard 10/22/2011.  How many connectors do you need ◦ Max DC/Servo Motor Controllers is 4 so use 4  How long should the connectors be ◦
Enterprise Content Management (ECM) Simulator for Return on Investment (ROI)
Estimating the Benefits and Costs of a Human Factors Engineering Program Adapted from a presentation to: MEK 2005: Congress on Medical Devices, Human Factors.
7 TH ANNUAL GODWIN WONG BUSINESS PLAN COMPETITION.
MERVE ALPEREN Industrial Engineering Department, The 2 nd class Dokuz Eylul University,IZMIR.
A Guide to Creating a Professional and Comprehensive Overview for Your Venture Presentation Guidelines.
CARIBBEAN WEDDING CELEBRATION A J OINT M ARKETING O PPORTUNITY MarryCaribbean.com and the CARRIBBEAN TOURISM ORGANIZATION.
1 REQUIREMENT ENGINEERING Chapter 7. 2 REQUIREMENT ENGINEERING Definition Establishing what the customer requires from a software system. OR It helps.
WEB ANALYTICS ECOMMERCE SOCIAL MEDIA SEARCH ENGINE OPTIMIZATIO PAY PER CLICK MANAGEMENT EFFECTIVE WEBSITE COPY.
17 th April 2014 Launch and Training Session - Business Plan.
Project Sponsor Project Manager Business Case # 04/23/2013 Major Projects Quarterly Review 1.
Idea Name Team Members. Market Need What problems or needs your product will solve?
Decline Warning Lights System Jason Lindley Electrical Technical Officer, Project Engineering August 22, 2011.
Problem Statement There are over 25 million children under the age of 5 in the United States, many of these children are taken out to restaurants to eat.
YOUR PROPOSAL CAN LEAD TO CONTRACT AWARDS
Problem Statement Project Proposal Design a device that will reduce the time of a medial malleolus fracture repair surgery Design a device that simplifies.
Reducing waste through a better grocery shopping experience Recipes > Featured Items > Grocery List >
Siemens Smart Grid Innovation Contest Join the grid – energize the world. Contact for more information: Michaela Stolz-Schmitz (E SGA) Christoph Hielscher.
 System Development Life Cycle System Development Life Cycle  SDLC Phases SDLC Phases Phase 1: Preliminary Investigation Phase 2: Feasibility Study.
Since Member SIPC and NYSE. Piper Jaffray – HPA Retreat
ODesk Product Management MRD. Solution Overview Summary description of proposed solution and basic rationale as to why it’s needed. Sets context for rest.
Quality management systems – Requirements
Feasibility Study.
© Leonard Walletzký. 5C Customer Company Context Collaborators Competitors STP Segmentation Targeting Positioning Marketing Mix 4P 7P 4C 7C 4S Název prezentace.
Materials Reminders. Get out your agenda if you see your name below. I would like to have you in my FLEX Wednesday. Period 2Period 7.
Negotiating the Deal. New Venture Story Short narrative of factual or imagined events Emphasizes goals and merits of venture through the story Often personal.
MLF Can Carrier (Marine Life Friendly Can Carrier*) Justyn B. 13 Virginia *may be changed based on research.
1 Third Party Data Access December 16, Third Party Data Access Green Button Connect My Data (CMD) Con Edison and O&R support third party data accessibility.
Requirements Determination
Presentation (For FICs stage 2)
DENISE HIGGINS Marketing Strategist
Presentation Guidelines
Water safety planning Assessment and management strategies to reduce risks of contamination and insufficient supply of drinking water Chemicals Excrement.
McAfee Customer Support Number
Chapter 4 Systems Planning and Selection
Project proposal for ISO 27001:2013 implementation
Quality Management Systems – Requirements
Business Plan.
Information Session.
Thanks for Downloading Your Pitch Deck Template!
الإقراض وتحليل الإئتمان ( 10)
POP BOTTLE COMPLETE FLOWER PROJECT
NEW PRODUCTS INNOVATION AWARD
FMH ANNUAL RESEARCH PRIZES COMPETITION 2016
Photography Competition
Blackout Poetry Step 1: Skim, DO NOT READ, the page for words you find interesting (anchor words) and circle them with a pencil. Step 2: After circling.
“Deep Dive” (your company name)
DENISE HIGGINS Senior Marketing Strategist Project Samples.
Estimated implementation time
Software Development Life Cycle (SDLC)
Company name Product name
Enabling Large Scale Utilisation of Class 3
SAMPLE SUBMISSION TEMPLATE
1. Get specs from customer Cost out the solution Decide discount strategy Assemble proposed response Approve proposed response.
Presentation transcript:

Estimated implementation time [Solution Name] Short description Stackable and interconnectable caps in a variety of primary colors. Benefit for consumer Amusing, collectable and competitive marketing hook. Technical details Visual I propose "Connect-a-Caps". A Connect-a-Cap is a screw-on bottle cap. It has a ridged edge circling the top of the cap. It has perturbations on the top and four sides. As such, the perturbations make rough surfaces which enhance grip and ease opening. Additionally, once removed, the caps can snap together to form larger assemblies. Caps come in a variety of primary colors. At the end of a party, individual caps can be snapped together to make any toy/object the customer wants to create. A annual contest awards a prize to the best creation that then gets recycled to help Mother Earth. My submission of "Bottle Cap Bob" holding the sponsors beverage is sure to win. Investments Risk mitigation Estimated implementation time Prototyping, testing, and peer group analysis Same risk of choking hazard as current caps < 6 months Andrey