GLAST Large Area Telescope:

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
Advertisements

GLAST LAT ProjectMay 20, 2003 LAT Engineering Meeting Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Revisions to Tray Design.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
Chip Carrier Package as an Alternative for Known Good Die
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
The printed circuit board (PCB) design
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 1 GLAST Large Area Telescope Data Acquisition Subsystem Gamma-ray.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
LSU 08/11/2004Electronics 41 Assembly Techniques Electronics Unit – Lecture 4 Component Preparation Component Placement and Soldering Inspection Activity.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
PACKAGE FABRICATION TECHNOLOGY Submitted By: Prashant singh.
Procedure for MCM rework on tray MID 070
ATLAS pixel module assembly flow
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mini-Tower test results
GLAST Large Area Telescope:
Preproduction Status & Results
GLAST Large Area Telescope:
FNAL Production Experience
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Lessons Learned and Earned Value Management System Assessment
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
IPC Compliance Testing (DPA) Methodology
Presentation transcript:

GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 6E: MCM Assembly

Overview Parts and Materials Teledyne Electronics Technologies Right-angle-interconnect assembly This is the only non-standard process. The long, narrow shape of the board and large number of ICs is also unusual to Teledyne. Connector mounting and soldering of SMT parts Die attach Wire bonding Electronics testing Wire-bond encapsulation Conformal coating SLAC MCM acceptance testing and burn-in

MCM Parts and Materials Teledyne handles receiving of parts and the required traceability, using their internal systems and procedures. PWB (LAT-DS-00077) manufactured to spec LAT-PS-01448 by Young Electronics. Pitch-adapter flex (LAT-DS-00370) manufactured to spec LAT-PS-01132 by Tycho. Nano connector receptacles and connector savers from Omnetics. Polyfused procured from Raychem to spec LAT-PS-01116. HV capacitors procured from Novacap to spec LAT-PS-01194. Standard QML SMT capacitors and resistors. GTFE and GTRC ASICs, tested, lapped, diced, visually inspected (see presentation 5D). Approved adhesives, encapsulants, and conformal coating.

Pitch Adapter Installation Custom tooling developed by Teledyne Electronic Technologies. Mount the blank PWB with machined radius to an aluminum plate that it remains with throughout MCM fabrication. Mount the plate+PWB in the bonding fixture.

Pitch Adapter Installation Screen print epoxy adhesive onto the flex circuit with a motorized screen printer (not shown). Align the flex circuit on the fixture, with tooling holes over pins.

Pitch Adapter Installation Place clamping pieces over the flex circuit. Bend and allow to cure.

Pitch Adapter Installation A bonded flex circuit is shown below before trimming. The assembly is installed in a cutting jig (not shown), which trims the circuit at both ends with a rolling blade (pizza cutter). The rolling blade cuts cleanly through the 1552 narrow traces.

Soldering The two connectors are hand soldered. Solder paste is put on the pads with a robotic volumetric dispenser (a silkscreen cannot be used because of the MCM raised edge). Automated pick-and-place of SMT parts, followed by IR reflow. Attach connector savers, which remain in place until tower assembly. Plug into power supplies to check for shorts and leakage current.

Die Attach and Wire Bond Automatic adhesive dispensing (conductive adhesive on gold pads). Automated pick-and-place of the ICs. Cure at 85°C, to protect the polyswitches and minimize warping. Automatic wedge bonding with 25-micron aluminum wire. Setup and destructive testing on extra MCM PWB+Flex. Wire bonds from IC to PWB, IC to IC, IC to flex, and PWB to flex. An EM MCM completed up through the wire-bond stage. (This one is shown in an opened storage/shipping container, not on the assembly jig.)

Detail of an EM MCM, at One End Nanonics Connector GTRC ASIC Grounding screw hole Polyswitch 90° radius GTFE ASIC Pitch-adapter flex circuit Before wire-bond encapsulation and conformal coating

MCM Functional Test Complete functional test at Teledyne before die encapsulation. Test all register and memory locations Test all I/O functions, including LVDS bias levels Test all inter-chip communication Check power consumption Test all amplifiers by charge injection and test the trigger output Test for excessive noise or instabilities A non-functional IC can be replaced at this point, if necessary. Interface Card (with cover removed) VME with COM Card and ADC Frequency Counter PC MCM DUT Adjustable Clock

Encapsulation After testing, the MCM returns to the robotic adhesive dispenser to encapsulate all wire bonds and ICs in a black hard epoxy. Cure at 85°C. The pitch-adapter pads for wire-bonding to the SSDs and the grounding holes are masked, and conformal coating is sprayed on. After curing, the MCM is removed from the aluminum assembly jig and fastened into the black ESD-safe plastic storage container. The connector savers also are fastened to the container, which is then sealed into an anti-static bag for storage and shipping. The MCM is not removed from the storage container until it is ready to be mounted onto a tray.

EM MCM-Assembly Experience Several problems were encountered that have required improvements in designs and procedures. See LAT-TD-01495 for a complete listing of the issues and the lessons learned. Most issues are small details being resolved to improve manufacturing and quality. The two major issues were The pitch-adapter flex design demanded too much alignment accuracy when bonding to the PWB. This has been resolved by extending the traces in the design (Teledyne has no trouble trimming them cleanly), but the problem resulted in the loss of function in a couple of ladders in the Engineering Model. Most EM MCMs required replacement of one or more ICs after the initial test. This was caused by inadequate testing of the ICs on the wafers. The wafer probing system has since been completed and improved to resolve this problem. See Presentation 5D. The test software is being improved to speed up identification of a bad IC. We must be prepared to replace some ICs before encapsulation as efficiently as possible, but we also will strive to minimize this procedure.

MCM Assembly QA Provisions Only approved parts will be used in the MCM assembly. Teledyne will receive and control parts and ensure proper traceability of all parts & materials. Teledyne has prepared a document of procedures specific to this project. It references all of their relevant standard internal procedures. Replacement of defective ICs before encapsulation will be included but only allowed one time maximum per IC site. Nonconformance reporting will be included. (UCSC personnel will also be on site for the electrical testing.) N. Virmani had a full day meeting with the Teledyne QA manager and will review all of the internal procedures and prepare a summary for GSFC for approval. Teledyne has provided us with copies of their QA documents for review. A Production Readiness Review will be held at Teledyne prior to the start of flight MCM production and following completion of a pilot run of MCMs.