Electron Gun UP (EGUP) Plan

Slides:



Advertisements
Similar presentations
CEBAF Photoinjector: What’s new, what’s the same since HAPPEx 2004? What needs to be done? M. Poelker, HAPPEx collaboration meeting, Feb. 18, 2005.
Advertisements

INJECTOR TEST FACILITY UPGRADE PHASE I: 5-10 MEV INJECTOR Feb. 7, 2014.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
Global Design Effort 1 Polarized electron source update Axel Brachmann, John Sheppard, Feng Zhou, Takashi Maruyama, -SLAC- Matt Poelker -Jlab- LCWS/ILC.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
DC photogun vacuum characterization through photocathode lifetime studies Marcy L. Stutzman, Philip Adderley, Joseph Grames, Matthew Poelker, Ken Surles-Law.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Lifetime Measurements.
Review of e- source for the low power Option and status update Axel Brachmann, John Sheppard BAW2, SLAC 1/18/2011.
Semester Calendar Academic Affairs. Proposed Calendar Outline Two 15 weeks semesters, one week of finals, one week for grading Fall Semester – Begin:
4 th Electron-Ion Collider Workshop, Hampton University, Monday May 19 th, 2008 CEBAF Load-Lock Polarized Electron Photogun Joe Grames & Matt Poelker (Jefferson.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
CEBAF Polarized Electron Guns Marcy L. Stutzman for the Jefferson Lab Polarized Source Group.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
November 17, 2008 A. Brachmann Slide 1 ILC polarized Electron Source R&D Update LCWS 2008 A. Brachmann, J. Sheppard, F. Zhou - SLAC National Accelerator.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
UITF Laser and Gun High Voltage John Hansknecht UITF Operational Review March 18, 2016.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
4 Laser Upgrade CEBAF 4 Hall Ops Joe Grames June 30, 2016 OPS Staytreat 2016 T. Allison, R. Bachimanchi, M. Bickley, W. Brinton, G. Croke, M. Diaz, L.
A bit of CEBAF polarized source history…
JLEIC R&D weekly meeting, Thursday Jan 26, JLab.
SLSP activated well on April 7th
Introduction and Goals
Bubble Chamber Schedule – 2017
SUMMER 2017 SUMMER 2018 >= SUMMER 2019
Joe Grames Center for Injectors and Sources
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
UITF – Upgrade Injector Test Facility
CEBAF Injector Update PREX/CREX March 3-4, 2017
Overview of LERF Status, Plans and Goals
Why are we removing our very good gun?
DC Injector and Space Charge Simulation Status
G0 Backward Angle Accelerator Preparations
CEBAF Injector Overview
Tunnel Penetration Tunnel Floor Gun Little Oil Tank ISB Rack
UITF Operational Review
Accelerator status after the 12 GeV upgrade
Bubble Chamber Planning Meeting
G0 Accelerator Planning Meeting (11/1/05)
Upgraded Injector Test Facility
Operations Department
C75 LLRF Cost and Schedule
QWeak Collaboration Meeting
Magnetized Electron Beam for Ion Cooling at JLEIC
Laboratory Directed Research and Development (LDRD) Proposal
Summer ‘09 SAD Same good photocathode PREP and LOAD chambers
Virgo Update – LSC meeting
Operations Department
Status of 500-kV DC gun at JAEA
Upgraded Injector Test Facility
Riad Suleiman February 2, 2017
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
Data shown for CEBAF upgrade Gun being tested in UITF
A. Freyberg Aug 2016 ECT’16 =>
Uses of UITF 10 MeV spin-polarized electron accelerator, beam current up to 100 uA M. Poelker December 12, 2018.
Carlos Hernandez-Garcia Don Bullard February 2, 2017
Test of Booster at UITF Reza Kazimi (12/12/18)
Polarized Source: Recent Activities
Cooler e-source Magnetized Beam LDRD Progress Report
CEBAF Pulsed Operation for JLEIC Electron Injection
Injector Commissioning & Optimization
Cooler e-source Magnetized Beam LDRD Progress Report
Presentation transcript:

Electron Gun UP (EGUP) Plan CEBAF Fall Run 10 week run in FY18 : September 28 – December 21 Four halls scheduled to receive beam – will be a challenge Gun2 is running splendidly Allocate one week to finalize laser setup: 4 laser @ 250MHz, co-aligned, A/C lenses to 5-axis mount?, chiller? Installing the EGUP ”200kV” gun operating w/o FE @ 130kV, but signs of FE emission onset near 200kV Base pressure of gun likely not yet realized Proposed Plan for the Fall – Commission both guns at UITF, choose best candidate for CEBAF “200kV” gun Re-bake gun w/ with typical NEG activation process HV condition ”200kV” gun to higher voltage (Spellman 225-250kV, Glassman > 225kV w/ R30-R28 SF6 tank) “350kV” gun HV condition gun Bake prep Complete laser/beam line to first pcup Commission w/ beam Complete NEG BPM line Define a plan for CEBAF EGUP HVPS to support 200kV gun + future headroom, e.g. Glassman PS (>300kV)

Week of… Summer SAD Calendar What could we do? Jul 10 200 kV / Inj controls upgrade Gun2 (DBR/high-P) Spin resonator bench test Jul 17 Gun2 (DBR/)high-P Spin resonator install Jul 24 200 kV DBR : high current Jul 31 200 kV / 2K SRF? DBR : high current/Mott Aug 7 Bubble / 2K SRF High-P : QE/Mott Spin resonator test Aug 14 Aug 21 PSS Cert / 2K SRF PQB Laser (RTP) Aug 28 Sep 4 Cryo Reconfig Finalize laser for Fall program Sep 11 Inj setup / 4K operations Sep 18 Inj setup / 2K operations Sep 25 CEBAF setup begins