Outage Adjusted Wind and Solar Forecast Reports

Slides:



Advertisements
Similar presentations
1 ETSO views on Transparency Urban Keussen Member of ETSO Steering Committee Head of Task Force on Congestion Managament ERGEG Public Hearing 6th July.
Advertisements

Mod 26_12 Notification Time for updating Interconnector Technical Data.
Make Whole Payments Modification Proposals Modifications Committee Meeting 04 December 2014.
Market Systems Release Update Modifications Committee Meeting 48 April 11 th
MOD_14_12 Reference to MO Status for VTOD. Context (1)  Mod_47_08 V2  Approved by the RAs in May 2009  Implemented in the SEM systems in November 2010.
Global Aggregation Working Group 15 th September 2010.
Global Aggregation Working Group 15 th September 2010.
Mod Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Evaluation of the Qualified Loss Management Program for Massachusetts Workers’ Compensation History and description of the Program Data and techniques.
Market Systems Release Update Modifications Committee Meeting 61 April 15 th
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
SEM MODS COMMITTEE SLIDES Registration of Charges over Collateral Reserve Accounts – Proposed Code Modification.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 25 September 2012.
Mod 10_11 Interconnector Under Test Mod 14_11 Pumped Storage Under Test Tuesday, 5 th April 2011.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Mod_18_10_v2 : SEM Intra-Day Trading 6 December 2011.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Mod_02_13 Registration of Charges WG Update 03 April 2014.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
Metering Modification to T&S code Cathal Kearney Protection & Metering 03/12/2015.
All Island Single Electricity Market IWFA Update Laura Brien
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – November 1s t 2006 Minutes from last IGG meeting10.00 – Networks AIM Project.
UNCC 11 November 2013 Request for Clarification on AUG Rules Fiona Cottam.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
DRSEC Update Transmission Workstream 06 November 2008.
Curricula Committee Report April 21, 2011 l The Curricula Committee report includes: »2 Degree Change (DC) forms DC0381 – Minor modification of electives.
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
UNC Modifications 061 & 062 – An Overview
Under Test End Dates 1st February 2011.
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Harmonisation Working Group
UNC Trader User – Licence obligations
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Correction of Minor Material Drafting Errors
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Net Inter Jurisdictional Import Submission
MOD_19_18 Part B Housekeeping 1 21st June 2018.
Review of the requirements regarding Unsecured Bad Debt within I-SEM
MOD_04_18 Reporting and Publication for Operational Schedules, Dispatch Instructions, Forecast Availability and SO Trades 13th March 2018.
Update to Unit Under Test Process
MOD_09_18 Interim Credit Treatment for Participants with Trading Site Supplier Units 13th March 2018.
MOD_21_18 Application of Settlement Reallocation Agreements to Market Operator Charges and Settlement Document Definition and Usage 21st June 2018.
MRSO Update James Long MRSO.
Code Administration Code of Practice
DSC Change Committee Summary – 11th July
MOD_10_18 Amendment to Capacity Settlement Statement Publication from Monthly to Daily 13th March 2018.
Ex Ante Quantities Deferral
Notification of Suspension to SEM NEMOs
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Definition of “Day 2 Deployment Date” Mod-11-17
Interim Suspension Delay Periods
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Imbalance Price Modifications
MOD_13_17 V2 Deferral of SEM NEMO Credit Reports and Non-acceptance of Contracted Quantities 13th March 2018.
Credit Cover Signage and Subscript Correction
DSC Change Committee Summary – 13th March ‘19
Meter Data Publication Timing
AUG Query Responses 21st November 2013.
Market Participant Identity Process – migration to UNC
MOD_05_19_V2 Amendment to Uninstructed Imbalance Charge (CUNIMB) to correct for negative price scenarios 11th April 2019.
Imbalance Price Modifications
Part B Suspension When Suspended Under Part A
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Implementation Approach Distribution Workgroup – June 2014
Modification Proposal 136
Gas Information Review Proposal UNC 0140
Credit Treatment For Adjusted Participants
Presentation transcript:

Outage Adjusted Wind and Solar Forecast Reports MOD_12_17 Outage Adjusted Wind and Solar Forecast Reports 21st November 2017

Summary Information Proposal seeks to remove the obligation on SEMO to publish separate outage adjusted wind and solar forecast reports Originally proposed as part of the ‘Solar in ISEM’ modification raised at meeting 76 but subsequently raised separately at the request of the Modifications Committee Outage Adjustment not currently applied to forecast volumes for SEM and originally not intended to be applied to basic forecast reports for ISEM Can now confirm that whatever outage adjustment information is available will be applied to the basic forecast reports for ISEM Separate reports were originally required for the AOLR solution but this is no longer the case Participants were concerned that they would lose the outage adjusted information and requested investigation into deferral as opposed to removal As outage adjusted data will now be available via basic reports, so that it is non-outage adjusted information which will be unavailable, SEMO respectfully suggest that removal is the appropriate course Note - Intention is to include extra-market units in aggregate forecast figures also (TBC at time of writing)