Review of Trade and Transfer Winter 09/10

Slides:



Advertisements
Similar presentations
Trades and Transfers Activity to Date. 2 Introduction  Trade and Transfer functionality added to RMSEC auction (renamed RMTTSEC) from July, applying.
Advertisements

Chubaka Producciones Presenta :.
Discretionary Release Interruptible Entry Capacity 1st November 2007.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Entry Capacity Substitution Workshop 8 – 7 th April 2009.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Third Workstream meeting re Baseline Re-consultation and Substitution 12 September 2007.
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
September 2008 QSEC auction - Allocations Transmission Workstream
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
DRSEC Update Transmission Workstream 06 November 2008.
Entry Capacity transfers in the constrained period Transmission Workstream 5 th October 2006.
Trades and Transfers Workshop, 6 th November 2007.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Transfers and Trades Special Transmission Workstream
Transmission Workstream, 01 October 2009
CMP Transparency Requirements
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Workstream, 2nd March 06
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
Entry Capacity - update
DRSEC Update August 4th 2009.
2018/2019 School Calendar July August September October November
McDonald’s Kalender 2009.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Capacity Methodology Statements: Impact of Mod 452
Action from Workshop 3 – SUB010
Discretionary Non Obligated Capacity release
NTS Entry Charging Review Update
Capacity Methodology Statements
PBIS Update December 2005.
2300 (11PM) September 21 Blue line is meridian..
Exit Capacity Substitution and Revision
McDonald’s calendar 2007.
Proud As A Peacock! We are very proud of__________________
Modification 501 slides for Workgroup
Mod 230: QSEC and AMSEC Timings
Baseline Re-consultation
Agricultural Marketing
Optimisation of Entry Capacity Modification Proposal
ASEP Allocation Graphs
IECR Incremental Step Size
Incremental Entry Capacity Release Methodology Statement
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Modification 0043 – Limitation on offering for sale unsold capacity
Entry Capacity Transfers - Constrained Period
Gemini Contingency Guidelines
McDonald’s calendar 2007.
PLAYMATES LEARNING CENTER CALENDAR
PBIS Update January 2006.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Review of Trade and Transfer Winter 09/10 Transmission Workstream 6 May 2010

Agenda Update on release of non obligated Oct 09 - Mar 10 Overview Trade &Transfer for Oct 09 - Mar 10 Update on release of non obligated Oct 09 - Mar 10

Transfer and Trades Oct 09 to Mar 10 All capacity requests satisfied in stage 1 (i.e by using capacity at the same ASEP) either by : Unsold NTS Entry Capacity (remaining Unsold from QSEC and AMSEC auctions) Surrendered NTS Entry Capacity (i.e. entry capacity made available by Shippers) Surrendered capacity allocated for at least one month at Bacton, Theddlethorpe, Easington, St Fergus More unsold remaining for daily auctions Stage 1 resulted in there being no unsatisfied bids. No Stage 2 required (i.e Transfer and Trade between ASEPs)

ASEPs where capacity was offered for surrender Capacity Surrendered – period 09/10 GWh ASEP OCT NOV DEC JAN FEB MAR Bacton 29 59 Barrow Theddlethorpe 5 3 Easington 218 139 65 135 106 107 Hatfield Moor Storage St Fergus 27 21 17 2 Hornsea Holehouse Farm Teesside 20 2.6

ASEPs where capacity offered for surrender was allocated Allocation met with surrendered – period 09/10 GWh ASEP OCT NOV DEC JAN FEB MAR Bacton 16 29 52 30 41 29.7 Barrow Theddlethorpe 2.5 Easington 1 1.5 2 Hatfield Moor Storage St Fergus 0.5 - Therefore, more unsold remained for daily auctions at these ASEPs

Totals for period October 09 to Mar 10 (GWh) ASEP Amount Requested Amount Surrendered Allocated from unsold Allocated from surrendered Bacton 211 293 13 198 Barrow 3 3.4 Theddlethorpe 4 8 1 Easington 6 771 Hatfield Moor Storage 35 St Fergus 0.5 72 Isle of Grain Hornsea Holehouse Farm Storage Teesside 31

Pre - October 2009 (GWh) April 09 to September 09 ASEP Amount Requested Amount Surrendered Allocated from unsold Allocated from surrendered Bacton 88 38 54 34 Barrow 0.2 Theddlethorpe 8.4 Easington 3.2 1.5 Hatfield Moor Storage St Fergus 4.6 Isle of Grain 963 Hornsea Holehouse Farm Storage 161 Teesside 3

Non obligated October 2009 to March 2010 Currently 3 mechanisms for releasing non obligated entry capacity QSEC Allocations at Isle of Grain WDDSEC Allocations at Hornsea, Avonmouth, Easington, Glenmavis, Partington, St Fergus DRSEC July 2009 – National Grid NTS received a request to initiate a DRSEC Auction National Grid NTS indicated, via letter to the Industry, 70 GWh available across 6 ASEPs for Oct 09 to Mar 10. 26GWh was allocated at Isle of Grain in October, November, December, January, February, March.