Microsoft Project 2007 Demo Part 2

Slides:



Advertisements
Similar presentations
CIS 480 Systems Analysis and Design
Advertisements

MS Project Tutorial EMEN. Entering Project Properties Choose File Properties Click the Summary tab You can now enter general information about the project.
0Quit Student ePlanner 1.Launch Outlook & the Panther Portal: 1.Open Start  All Programs  Office Productivity  Microsoft Outlook Right-click.
Microsoft Office XP Microsoft Excel
Loading Excel Double click the Excel icon on the desktop (if you have this) OR Click on Start All Programs Microsoft Office Microsoft Office Excel 2003.
Using Microsoft Office Excel 2007
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
| | Tel: | | Computer Training & Personal Development Microsoft Office Project 2003 Intermediate.
Project Information: Customizing and Printing Lesson 7.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Microsoft Excel 2010 Chapter 7
Using MS Project To draw a Network diagram. Add tasks Add the 8 tasks listed for making a cup of tea. Add the duration of each –Note: MS Project doesn’t.
Microsoft Project Presentation By Corey Johnson 10/11/00.
Project Plan Formatting – Fundamentals Lesson 6. Skills Matrix SkillsMatrix Skill Format a Gantt ChartModify the Gantt Chart using the Bar Styles dialog.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Excel And Microsoft Project Technology Plug-In T12.
Microsoft Office © Copyright William Rowan Objective By the end of this you will have being given a brief introduction to: Microsoft Word Microsoft.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
Refining Your Project Plan Lesson 4. Skills Matrix SkillsMatrix Skill Apply a task calendar to an individual task Change task typesChange scheduling formula.
Abeer Bin Humaid. Project management is “the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements”
1 Microsoft Project 2010 Demo Part 1. 2 Project: Initial Screen To start click Project/Project Information. Add start date.
MS project Abeer Bin Humaid. What is project management? Project management is “the application of knowledge, skills, tools, and techniques to project.
Introduction to MS WORD.
Microsoft Project Tutorial for Chapters 4 & 5 This Tutorial explains how to: Build a MSP Project Network Build a Probabilistic MSP Network Use the Calendar.
Fourth R Inc. 1 WELCOME TO MICROSOFT OFFICE PROJECT 2003 INTRODUCTORY COURSE.
Office 2003 Post-Advanced Concepts and Techniques M i c r o s o f t Excel Project 8 Formula Auditing, Data Validation, and Complex Problem Solving.
SOFTWARE PROJECT MGT. SESSION # 3– LAB MANUAL AMAN QUADRI
PROJECT MANAGEMENT 3RD YEAR UNDERGRADUATE UNIT U13451 PRMAN DL Tutor: Kathy Parker WEEK FIVE Adapted from slides by Dr Philip J. Scott MSc PhD FBCS CITP.
TUTORIAL 5 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 18/11/2012 Introduction to MS Project 2007.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
Click your mouse to continue. The Office Shortcut Bar The Office Shortcut Bar contains program buttons that, when clicked, start new documents or start.
 The ribbon is the primary form of navigation in the Microsoft Office 2007 system.  There are seven Tabs on the Ribbon, more (contextual) tabs will.
1 Microsoft Project 2003 Starting a New Project. 2 Creating a new project plan To start Microsoft Project, click the Windows Start menu. Point to All.
MS-Excel XP Lesson 7. Creating Charts 1.Excel for windows can produce 14 standard type and 20 custom types of graphs or charts, with many different format.
Customizing Menus and Toolbars CHAPTER 12 Customizing Menus and Toolbars.
1 Microsoft Project 2010 Demo Part 2. 2 Problem 2.8: Enter Tasks Enter tasks and times for problem 2.8. Be sure to click Project/Project Information to.
Opening a File 1.Open Word 2.Click the Microsoft Office button(Very top left hand corner). A menu appears 3.Click Open. The Open dialog box appears 4.Use.
Microsoft Project 2003 By: Mahmoud Saad El-Din. Topics  Creating a new project.  Working with workspace project.  Defining project information.  Working.
Chapter 11 Enhancing an Online Form and Using Macros Microsoft Word 2013.
Excel Tutorial 8 Developing an Excel Application
June 17, 2009 Office 2007 Tips & Tricks.
Integrating Office 2003 Applications and the World Wide Web
Using Macros, Switchboards, PivotTables, and PivotCharts
DRAWING LINES To draw lines click View in the Main Menu Toolbar -> Toolbars and check the Editor option. The Editor toolbar will appear amongst the toobars.
Software project mgt. session # 3– lab manual.
Shelly Cashman: Microsoft Word 2016
MICROSOFT PROJECT MODULE 7 – CRITICAL PATH.
Microsoft Excel 101.
Lesson 8: Granting Patient List [Proxy] Access
Office 2010 and Windows 7: Essential Concepts and Skills
Microsoft Project 2010 Demo Part 3
Chapter 7 Advanced Form Techniques
Signature: Microsoft Word 2003
Microsoft Project 2007 Demo Part 3
ENGINEERING MANAGEMENT (GE 404)
Software project mgt. session # 3– lab manual.
Lesson Seven: Maintaining Patient Lists
Microsoft Office Access 2003
Microsoft Office Access 2003
Lesson Seven: Maintaining Patient Lists
Microsoft Project 2007 Demo Part 1
ENGINEERING MANAGEMENT (GE 404)
Information System Analysis
Entering the Task List Dr. George.
Navigating Excel.
Shelly Cashman: Microsoft Access 2016
Microsoft Project 2010 Demo Part 3
Microsoft Project 2007 Demo Part 2
Microsoft Project 2013 Demo Part 2
All Right Reserved © JiJi Technologies Pvt Ltd
Presentation transcript:

Microsoft Project 2007 Demo Part 2

Problem 2.8: Enter Tasks Enter tasks and times for problem 2.8

Setting Start & Finish Date Click Project/Project Information. Click on down arrow of start date for pull down calendar. Click May 1, 2008.

Setting Time Units To change time units go to Tools/Options. Click on Schedule tab. Change duration.

Setting Calendar Click Tools/Change Working Time. For changing work week, holidays, etc. To add a holiday in Project 2007, click on the appropriate start date. Then type in the name of the holiday in the table at the bottom of the window, the start (e.g. July 4) and finish time (e.g. July 4). Then double click and specify as non-working. If you wish to change working times, use options button at bottom of window.

Resource Use by Task Double click on each task. Click Resources tab. Label resource Labor and enter in units used by each task. At same time also enter in predecessors.

Showing the Critical Path Click Format/Gantt Chart Wizard/Critical Path/Dates.

Resource Use To show resource use click View/Resource Graph.

Resource Availability Click Project/Resource Information (You need to do this while you are in resource use view). In Resource Availability window, enter dates resource is available and maximum units available.

Resource Balanced Schedule To level resources click Tools/Level Resources. Check the Level Now box.

Resource Balanced Schedule To see Gantt Chart click View/Gantt Cart.

Doing Three Time Estimates To enter 3 time estimates: Click View/Toolbars/PERT Analysis. If there is no “PERT Analysis” go to step 2. Otherwise stop. Click View/Toolbars/Customize. Click Commands tab. In Categories box, click All Commands. In Commands box, click ComAddInsDialog and drag it near any toolbar displayed at the top of the Project window. Release mouse button to add ComAddInsDialog command to the toolbar. Click Close on the Customize dialog box. Click COM Add-Ins on the toolbar where it was just added. Clear (undo) check boxes for Adjust Dates, Copy Picture to Office, and Pert Analysis. Then click OK. Click COM Add-Ins again. Click check boxes for Adjust Dates, Copy Picture to Office, and Pert Analysis. Then click OK. Click View/Toolbars/PERT Analysis.

Problem 1.2: Three Time Estimates To enter 3 time estimates: Click View/Toolbars/PERT Analysis. Click on icon 1 to enter three times. Click icon 2 to calculate mean time. 2 1

Problem 1.2: Expected Time Gantt Chart Click View/Gantt Chart to see chart. Don’t forget to enter in prerequisites. Click icon at 3 to show schedule with optimistic, pessimistic, or expected (mode) times. Find critical path. 3

Beware of Indicator Icon To remove indicator, right click task with icon. Then click Task Information. Open the Advanced tab. Set constraint type to “as soon as possible”.

Beware of Indicator Icon Completed removal step is shown below.