Re-Installation (days)

Slides:



Advertisements
Similar presentations
Alfa-Omega Team General information General information (Anna) W Bellows (Alain) DN200 (Andrea) A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013.
Advertisements

LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
LHC (and ATLAS) Status and Plans
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
1 CSCM-7TeV Powering Implementation and ELQA Third LHC Splice Review November 2012 M. Bajko, M. Bernardini, B. Bordini, k. Brodzinski, J. Casas-Cubillos,
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
K. Foraz, S. Prodon TS-IC TS workshop – May 2005 Underground logistics K. Foraz, S. Prodon TS-IC.
WEEK 1 You have 10 seconds to name…
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
LS1 status 6/06/2014. BLM re-installation ARC Sector 3-4 – in work, will be done to Sector 4-5 – from 30(23).06 – Sector for Cool.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
SunSatFriThursWedTuesMon March Candidate Orientation FR Mock Exam #1 FR Mock Exam #2.
MPE LS1 workshop Summary Session 4 – Quench Detection R. Denz, D. E. Rasmussen.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
CMGT 411 Week 5 Learning Team SR-rm-013 Project and Presentation Finalize and submit an 8-10 page Learning Team paper. Prepare a Microsoft ® PowerPoint.
ISCOM 471 Week 5 Learning Team Assignment Scheduling Across the Supply Chain Executive Summary and Presentation To purchase this material click below link.
BSA 310 Week 5 Learning Team Service Request SR-rm-012 Paper and Presentation Check this A+ tutorial guideline at 310/BSA-310-Week-5-Learning-Team-Service-
K. Foraz on behalf of OSS members
HOW LONG DO STUDENTS IN MS. MATHEW’S CLASS PREPARE FOR A MATH TEST?
LVPS HEC Overview and Development
SMACC Tenth report [15 min] 13/09/2013
ELQA Electrical Quality Assurance
Minimum Hardware Commissioning – Disclaimer
TE-MPE LS1 review Vision from EN-EL(CF)
12 October 2009 RRB Plenary R.-D. Heuer
The LHC - Status Is COLD Is almost fully commissioned
Long Shutdown for the LHC: Vacuum Beam Pipes
MPE main activities planned for LS2
What has been learnt from LS1
Renovation of the 45-year old PS magnets
Powering from short circuit tests up to nominal
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
K. Foraz on behalf of OSS members
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
Alice solenoid – orbit distortion
BLM planning 24/02/2014.
BLM planning 03/03/2014.

RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
LS1 status 28/04/2014.
!'!!. = pt >pt > \ ___,..___,..
07/07/2014 * status, all * AccTest framework
Tuesday 22 November 2011.
WELCOME Math 2 Last Night’s HW: None Chapter 9: Circles
LS1 status 17/03/2014.
LHC installation status
Carbon Footprint.
LHC - Week 38 Technical stop: Katy Foraz
BLM planning 03/02/2014.
Week 43 ( LHC only) Installation of BLECF in LSS 4L and LSS 4R (Adrien and Mounir) - Done Check and repairs of BLECF in LSS 4L and LSS 4R (Steve) -? Installation.
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.

Shortening the long RQF/RQD busbar segments in points 1 and 5
Presentation transcript:

Re-Installation (days) SUMMARY's SCHEDULE   BLM's Dismounting (days) Re-Installation (days) RSM(nights) Total days Weeks R1: Q1-Q11 84 1.5 2.5 1 5 ARC12: Q12-Q12 272 3 6 10.5 2,3 L2:Q1-Q11 98 4 R2:Q1-Q11 96 ARC23: Q12-Q12 280 6,7 L3:Q6-Q11 74 8 R3:Q6-Q11 9 ARC34: Q12-Q12 278 10,11 L4: Q5-Q11 47 3.5 12 R4: Q5-Q11 12, 13(1/2) ARC45: Q12-Q12 13,14, 15(1/2) L5:Q1-Q11 81 15, 16(1/2) R5:Q1-Q11 82 16, 17(1/2) ARC56: Q12-Q12 17,18, 19(1/2) L6:Q4-Q5,Q8-Q11 36 0.5 2 19 R6:Q4-Q5,Q8-Q11 20(1/2) ARC67: Q12-Q12 276 20,21, 22(1/2) L7:Q6-Q11 61 4.5 22, 23(1/2) R7:Q4-Q5,Q8-Q11 64 23, 24(1/2) ARC78: Q12-Q12 270 24,25, 26(1/2) L8:Q1-Q11 90 26, 27(1/2) R8:Q1-Q11 27, 28(1/2) ARC81: Q12-Q12 28,29, 30(1/2) L1:Q1-Q11 83 30,31 45 27 154 consequent works for 4 person's team +1 superviser(especially for RSM)- > 31 weeks 2010 Planning

ARC: Dismounting of current installed BLMs 16 Quads/day all 6 monitors Quads (12L-12R) BLM Additional BLM Dismounting (days) 1 ARC12 45 270 2 3 ARC23 10 ARC34 8 4 ARC45 5 ARC56 6 ARC67 7 ARC78 ARC81 Total(days) 23 ARC: Installation of existing and 2 more BLMs 6 Quads/day all 8 monitors 48 BLM/day Quads (12L-12R) BLM Additional BLM Installation (days) 1 ARC12 45 270 92 8 2 ARC23 100 3 ARC34 98 4 ARC45 5 ARC56 6 ARC67 96 7 ARC78 90 ARC81 ARC: RSM Quads (12L-12R) BLM Nights(18:00-6:00) 1 ARC12 362 3 2 ARC23 370 ARC34 368 4 ARC45 5 ARC56 6 ARC67 366 7 ARC78 360 8 ARC81 1 sourse, 2->-> teams,18:00-6:00;12 (6+6) hours or 2 sourse, || 2 teams, 6 hours 30 quads/night

Splices Powering Tests Splices Cool-down PT Warm-up -> 10K CSCM CSCM preparation Splices Cool-down Powering Tests Powering Tests Splices Cool-down Jean-Philippe : “LHC consolidation of the superconducting circuits ” Warm-up Preparation for cool-down Feb. 8th 2012 K. Foraz - LHC Performance Workshop 2012

Splices RMS 8 weeks during the night for RSM : Dec,Jan2014 Dismounting BLM: Dec,Jan,Feb PT Warm-up -> 10K CSCM CSCM preparation Splices 3/12 - 21/12 1 week   7/01-13/01 14/01 – 03/02 1 week   1 week 4/02-11/02 RMS 12/08-08/09 4 weeks Installation BLM: Aug,Sep,Oct,Nov Cool-down 09/09-06/10 4 weeks Powering Tests 7/10-3/11 4 weeks 4/11-1/12 4 weeks Powering Tests Splices Cool-down Jean-Philippe : “LHC consolidation of the superconducting circuits ” Warm-up Preparation for cool-down 8 weeks during the night for RSM : Dec,Jan2014 Feb. 8th 2012 K. Foraz - LHC Performance Workshop 2012