EPIM RUF meeting June 16th 2009

Slides:



Advertisements
Similar presentations
WG EDI Work in Progress on the ENTSO-E Business processes Last updated: Note: The information provided in this document identifies the evolutions.
Advertisements

An Introduction to XML Based on the W3C XML Recommendations.
3/5/2009Computer systems1 Analyzing System Using Data Dictionaries Computer System: 1. Data Dictionary 2. Data Dictionary Categories 3. Creating Data Dictionary.
In collaboration with Building XML for Daily Drilling Report Arnt Vegard Espeland October 2006.
1 1 Roadmap to an IEPD What do developers need to do?
Chapter 12 Creating and Using XML Documents HTML5 AND CSS Seventh Edition.
Method of Converting Resource definitions into XSD Group Name: WG3 (PRO) Source: Shingo Fujimoto, FUJITSU, Meeting Date:
DDR Modelling Patterns Bit data, Casing/Liner/Tubing, and Cement.
And Together. Free your energies New XML schema and HTML report layout Daily Drilling Report Phase II.
Technical Team WITSML SIG Paris 16 May Technical Team Representatives mainly from service companies Energistics (Gary) keep a global issue list.
MPR Reference Data status MPR Project Meeting June 17 th Pål Rylandsholm, DNV.
Introduction of PRO WG activities Group Name: TP Source: Shingo Fujimoto, FUJITSU, Meeting Date: Agenda Item:
ESB Networks Market Release Meeting of the IGG, 20 th August 2009.
© 2012 The MITRE Corporation. All rights reserved. For internal MITRE use 13 June 2013 Meeting #3 hData Record Format Taskforce 1 © 2012 The MITRE Corporation.
Christer Eriksson 11 March 2010 JWG1 - Wind Turbine Gearboxes IEC/ISO Design Requirements for Wind Turbine Gearboxes.
Edwin Aalders 24 March 2012 Materiality Applying Materiality in the Flexible Mechanism.
1 Schema Registries Steven Hughes, Lou Reich, Dan Crichton NASA 21 October 2015.
Monthly Publishing System (MPS) Developer Workshop 25 August, 2015.
PREMIS Rathachai Chawuthai Information Management CSIM / AIT.
Symbols relationship class of relationship class of class of relationship Name RDS Identifier/URI Relationships Classes Name Level 2/Class of class Level.
Standards for Technology in Automotive Retail STAR Update Michelle Vidanes STAR XML Data Architect April 30 th, 2008.
DDR Drilling and Well model Status – core group meeting.
| ICD-11 Field Trials update | 16 Oct |1 | ICD-11 Field Trials Progress & Way forward Nenad Kostanjsek Classifications, Terminologies, Standards.
Introduction to the NCIP DTDs and XML Schemas Tony O’Brien Oct 2 nd 2002.
DDR version 1.2 Project meeting - Web Lillian Hella POSC Caesar Association (PCA)
WITSML Technical Team Update Houston May Technical Team Responsible for technical content of WITSML standard XML Schemas XML Schemas Application.
Versioning and Use Case Demonstration Pavel Stoev Senior Solutions Developer Links Technology Solutions.
Water Framework Directive Report of Activity 1 OR Progress with WFD 2005 schemas.
Yao Bo Lu Stavanger, Daily Drilling Report Elements.
Using DSDL plus annotations for Netconf (+) data modeling Rohan Mahy draft-mahy-canmod-dsdl-01.
Pål Rylandsholm 16 June 2009 DRAFT DDR Phase 2 Status EPIM RUF meeting June 16th 2009.
1 © 2003, Cisco Systems, Inc. All rights reserved. DMTF and Cisco Profile overview/comparison August 17, 2005.
© Copyright IBM 2007DIA ERS SIAC Presentation, January 2008 The HL7 RPS and SPL Standards - A High Level View Terry Hardin Sr. IT Architect Emerging Software.
Daglig borerapport Project meeting March
Stephen Banghart Dave Waltermire
KEEPS – a system for UELMA preservation and security
KEEPS – a system for UELMA preservation and security
Getting a Leg Up on OAI for the NSDL
Input to project from IIP
AIXM – Work in Progress AIXM CCB – Webex, 24 JAN 2014.
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Quick Guide for Offline Reports
DDR version 1.2 Project meeting - Web
Website Booking & S/I & VGM
ETS Submission Process for New Project Applications
Technical update 05 of April 2017
Website Booking & S/I & VGM
Project Meeting June 17th Pål Rylandsholm, DNV
Website Booking & S/I & VGM
Daily Drilling Report Phase 2
Website Booking & S/I & VGM
ROI HSP Project Update Conor Garrigan 21 September 2011.
Website Booking & S/I & VGM
Website Booking & S/I & VGM
Meeting of Working Group Data & Information Sharing (DIS)
Daily Drilling Report Phase 2
ESS.VIP VALIDATION An ESS.VIP project for mutual benefits
Questionnaire on progress in preparing reports under Nature Directives
HB 357 – Prekindergarten Program for Star of Texas recipients
WP 4 - Revision of Natura 2000 dataflow
Website Booking & S/I & VGM
Reporting tools updates & prefilling
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
IT support and support for NICE
Eddy Porosnicu EUROCONTROL
Eddy Porosnicu EUROCONTROL
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Port Back Data Collection & Transition
AIXM scripts and plannning
Canada Gazette Directorate
Presentation transcript:

EPIM RUF meeting June 16th 2009 20 April 2019 DDR Phase 2 Status EPIM RUF meeting June 16th 2009

20 April 2019 DDR to regulators and license partners - Scope and deliverables of DDR phase 2 PCA RDS Operators Regulators NPD/PSA Fact database DDR XSD Daily Drilling reports XML Drilling App/DB PSA/NPD app Drilling data Daily Drilling reports XML License Partners LicenseWeb pdf Daily Drilling reports XML Drilling App/DB Schema/Business validation

Status As of March 24th EPIM officially owns the DDR XML schema 20 April 2019 Status As of March 24th EPIM officially owns the DDR XML schema Updates to XML schema – completed Standard html report layout for PDF reports – completed User guide updates - Draft version available (http://www.ptil.no/getfile.php/PDF/DDRS%20-%20borerapportering/WITSML_drillReport_profiled_schema_for_usermanual.xml) Schema validation error messages - Business rule validation error messages will be updated by cut of to new formats Partner reporting in LicenseWeb Status: Specification document completed Build - in progress October 1st is set as the cut of date for reporting on new the formats to PSA and new DDR partner reporting solution in LicenseWeb will be ready for use!

Way forward Completion of DDR partner reporting in LW - Responsible Tieto, follow-up by LW User forum Communication to EPIM members regarding new DDR formats and date for go live of DDR reporting in Licenseweb – responsible EPIM Report User Forum – Drilling Communicate to operators regarding cut of date for new formats to PSA – Responsible PSA Project documentation will be added to EPIM’s document repository – Responsible PM Further improvements and extensions of the DDR XML schema will be handled by EPIM RUF – Drilling A possible first case can be increased information scope in DDR. See Next slide

Additional information requirements – NB not included project scope 20 April 2019 Additional information requirements – NB not included project scope Identified during DDR Phase 1 Operation codes Cement Period of operation “Drilling like units of measure” Formation name – selection list Datum (reference points) Casing type Pressurized coring Well stimulation (At well testing) indicator Perforation - Shot density RIGTYPE Bit data Side track Tight wells Identified during DDR Phase 2 Cost Report nr -> A sequence number. Each day of operation is a new number increment Start date -> Start of reporting/operation Water depth Bit record (additional info): grading, depth in, depth out, drill lenght (m), duration (hr), rop (m/hr) Casing (new section): OD (in),top, bottom, weight, grade, estimated top of cement "Duration" should be included for all time intervals.

New XML schema – Proposed and implemented changes 20 April 2019 Type Where Remove length constraint <controlIncidentInfo><description> <controlIncidentInfo><formation> <formTestInfo><description> <lithShowInfo><show> <lithShowInfo><lithology> <equipFailureInfo><description> <stratInfo><description> <extendedReport> Increase length constraint to 256 chars <logInfo><tool> © Det Norske Veritas AS. All rights reserved. 20 April 2019

New XML schema – Proposed and implemented changes 20 April 2019 Type Where Make element optional <loginfo><tempBHCT> <loginfo><tempBHST> <loginfo><eTimStatic> <cs_drillReportGasReadingInf><meth> <cs_drillReportGasReadingInf><eth> <cs_drillReportGasReadingInf><prop> <cs_drillReportGasReadingInf><ibut> <cs_drillReportGasReadingInf><nbut> <cs_drillReportGasReadingInf><ipent> © Det Norske Veritas AS. All rights reserved. 20 April 2019

New XML schema – Proposed and implemented changes 20 April 2019 Type Where Spelling <PhaseType><bop test> Activity code: <workover –- stimulate> Activity code: <completion – stimulate> Equipment code: <hoisting equ – nnn>* RDS references Using sawsdl annotation for RDS references All RDS url updated to the March 09 version All RDS references are using RDS id instead of class name as unique id *The group of equipment codes ‘hoisting equ’ © Det Norske Veritas AS. All rights reserved. 20 April 2019

New XML schema – WITSML version changes 20 April 2019 Element Old value New value witsml:drillReports version 1.3.1.0(NPD) 1.4.0.0 witsml namespace http://www.witsml.org/schemas/131 http://www.witsml.org/schemas/1series witsml:documentInfo Child element syntax: ElementName New child element syntax: elementName witsml:timestamp no time zone constraints constraints include time zone (mandatory) Pattern to be used: yyyy-mm-ddThh:mm:ss.000Z where 000Z is the time zone value with respect to UTC. © Det Norske Veritas AS. All rights reserved. 20 April 2019

20 April 2019 HTML Report Layout

20 April 2019 © Det Norske Veritas AS. All rights reserved.

20 April 2019 © Det Norske Veritas AS. All rights reserved.

20 April 2019 © Det Norske Veritas AS. All rights reserved.

20 April 2019 © Det Norske Veritas AS. All rights reserved.

Safeguarding life, property and the environment 20 April 2019 Safeguarding life, property and the environment www.dnv.com