KAGRA Vacuum System VAC (YS) 1 1. Layout (interferometer and survey map) **tilting the optical plane of interferometer for draining water. **horizontal.
KAGRA Vacuum System Items of vacuum sub-group 1 1. Overview VAC (YS) Required Pressure “uhv (ultra-high-vacuum)” in the order of Pa, or lower.
SEO report _SAITO 1. Overall schedule of iKAGRA installation/commissioning change to Michelson Interferometer 2. Scheduling of daily works for installation.
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
Amaldi conference, June Lock acquisition scheme for the Advanced LIGO optical configuration Amaldi conference June24, 2005 O. Miyakawa, Caltech.
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
G D Some questions I wish someone had time to explore (by simulation or otherwise) and give me some answers Stan Whitcomb e2e Meeting 18 October.
LIGO-G D LIGO II1 AUX OPTICS SUPPORT Michael Smith, 6/11/03 STRAY LIGHT CONTROL ACTIVE OPTICS COMPENSATION OUTPUT MODE CLEANER PO MIRROR AND PO.
Optical Levers Layout and Cabling Yuta Michimura, Yuya Kuwahara Ando Group Department of Physics, University of Tokyo November 19, 2015.
LIGO- G R Aspen winter conference, January Toward the Advanced LIGO optical configuration investigated in 40meter prototype Aspen winter.
40m AOS DRD, G R1 40m Auxiliary Optics Support Design Requirements Document & Conceptual Design Michael Smith 10/18/01 Stray Light Control Initial.
New iKAGRA Configuration Yuta Michimura Department of Physics, University of Tokyo 11th KAGRA F2F (University of Tokyo) Feb 6, 2015.
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo December 8, 2015.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Summary of iKAGRA Test Run Mar 25-31, 2016 Yuta Michimura Department of Physics, University of Tokyo April 12, 2016JGW-T
Lessons from CLIO Masatake Ohashi (ICRR, The University of TOKYO) and CLIO collaborators GWADW2012 Hawaii 2012/5/16.
IKAGRA 初期アラインメント手順 Initial Alignment Procedure for iKAGRA Yuta Michimura Department of Physics, University of Tokyo July 5, 2016JGW-T
Local control sensors for iKAGRA payloads and perspective (Optical lever) Kazuhiro Agatsuma 2013/Dec./5 ELiTES meeting at Tokyo1.
LIGO- G R Amaldi7 July 14 th, 2007 R. Ward, Caltech 1 Prototyping for eLIGO: Power Recycled Fabry Perot Michelson DARM RF ITMy ITMx BS PRM SRM.
Main Interferometer Subsystem
Summary of iKAGRA Test Run Apr 11-25, 2016 Yuta Michimura Department of Physics, University of Tokyo May 9, 2016JGW-T
Input Mode Matching of LCGT 2012/1/5, Yoichi Aso.
Cryogenic development in KAGRA
Main Interferometer Subsystem
Main Interferometer Subsystem
Demonstration of lock acquisition and optical response on
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Apr 11-25, 2016
Yuta Michimura Department of Physics, University of Tokyo
KAGRA Control Room Appearance (tentative)
Yoichi Aso on behalf of the LCGT ISC Group
Vibration Isolation Systems
The Advanced LIGO Angular Control System (ASC) (Hanford edition)
A photo sensor to monitor the motion of the recoil mass
Summary of the iKAGRA Run
Interferometer Design for bKAGRA Phase 1 and Beyond
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Cartoon of the optical layout around IMC, IFI and IMM
40m Laboratory Upgrade Progress Report
Thermal lensing effect: Experimental measurements - Simulation with DarkF & Finesse J. Marque (Measurements analysis: M. Punturo; DarkF simulation: M.
Interferometer Design for bKAGRA Phase 1 and Beyond
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Commissioning Procedure for bKAGRA Phase 1 ( )
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Commissioning Procedure for bKAGRA Phase 1 ( )
Summary of the iKAGRA Run
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1 ( )
Progress report from 40m team for the Advanced LIGO
40m TAC Update October 2006 The 40m Team 11 April 2019 G I.
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Interferometer Design for bKAGRA Phase 1 and Beyond
Beam Propagation for bKAGRA Phase 1 with flat ETMs
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1
KAGRA ISC Electrical Components Layout
Yuta Michimura Department of Physics, University of Tokyo
KAGRA ISC Electrical Components Layout
Presentation transcript:

iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA JGW-T1604823 April 22, 2019 iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA Yuta Michimura Department of Physics, University of Tokyo

Expected Situation on Mar 2 All the mirrors (PR2, PR3, BS, ETMX, ETMY) installed with actuation from digital system (pico, OSEMs, coils) stable >250 mW from IMC in high finesse mode (s-pol) both 3km ducts evacuated (φ100 mm viewport on each end; for Y arm, IYA+IYC also evacuated) EYA GV closed evacuated GV opened IYA φ100 mm viewports IYC φ150 mm viewports GV closed from IMMT2 GV closed GV closed PRM PR3 PR2 BS IXC IXA EXA GV opened vented cleaned evacuated

IMMT2 Alignment (Mar 3) Use picomotors on IMMT2 to center the beam on PR2 PR3, PR2 chambers opened EYA IYA IYC center the beam by looking at PR2 surface (beam radius 3.7 mm) align IMMT2 PRM PR3 PR2 BS IXC IXA EXA

PR2 Alignment (Mar 3) Use picomotors on PR2 to center the beam on PR3 PR3, PR2 chambers opened EYA IYA IYC align PR2 PRM PR3 PR2 BS IXC IXA EXA center the beam by looking at PR3 surface (beam radius 34 mm)

Beam Profiling at PR3 (Mar 3) Measure the profile of the beam going to PR3 tilt PR2 temporarily PR3, PR2 chambers opened EYA IYA IYC tilt PR2 PRM PR3 PR2 BS IXC IXA EXA large beam profiler (beam radius 34 mm)

PR3 Alignment (Mar 4) Use OSEMS on PR3 to center the beam on BS PR3, PR2, BS chambers opened EYA IYA IYC PRM PR3 PR2 BS IXC IXA EXA align PR3 center the beam by looking at BS surface (beam radius 34 mm)

Beam Profiling at IXA (Mar 4) Measure the beam profile at IXA If not well collimated, move PR2 and iterate (it’s not easy to decide if collimated or not with this length, but we will do our best) PR3, PR2, BS, IXA chambers opened EYA IYA IYC PRM PR3 PR2 BS IXC IXA EXA large beam profiler (beam radius 34 mm) align PR3

Pointing to X Arm (Mar 4-7) Put PD in EXA chamber, sweep PR3 alignment by OSEMs, and wait for the PD to get any signal (we will also put screens + cameras to monitor EXA) Put PD at EYA also to get signal by chance PR3, PR2, BS, EXA chambers opened If no success, go to plan B EYA Thorlabs PDA100A (beam radius 40 mm) IYA IYC beam spot on GV 3.5195 mm ↑ from the center PRM PR3 PR2 BS IXC IXA EXA beam spot on GV 3.5195 mm ↑ from the center sweep PR3 alignment Thorlabs PDA100A (beam radius 40 mm)

Beam Profiling at EXA (Mar 7) Measure the beam profile at IXA (this beam is clipped by φ100 mm viewports) PR3, PR2, BS, EXA chambers opened EYA IYA IYC PRM PR3 PR2 BS IXC IXA EXA sweep PR3 alignment large beam profiler (beam radius 40 mm)

Pointing Back from X Arm (Mar 8) Evacuate EXA if possible Sweep ETMX alignment by coils, and wait for the PD to get any signal PR3, PR2, BS chambers opened EYA IYA IYC sweep ETMX alignment PRM PR3 PR2 BS IXC IXA EXA evacuate Thorlabs PDA100A (beam radius 40 mm)

Back to IFI (Mar 8) Adjust ETMX alignment to center the reflected beam on BS, PR3, PR2, and get the beam back to IFI and then REFL port PR3, PR2, BS chambers opened EYA IYA IYC adjust ETMX alignment to IFI PRM PR3 PR2 BS IXC IXA EXA

Close X arm (Mar 9) Put X arm bellows, and evacuate IXC + IXA (evacuate slowly; open arm GV after IXC+IXA reached10-100 Pa) EYA IYA IYC PRM PR3 PR2 BS IXC IXA EXA put duct evacuate

Pointing to Y arm (Mar 9-10) Put PD in EYA chamber, sweep BS alignment by coils, and wait for the PD to get any signal PR3, PR2, BS, EYA chambers opened EYA Thorlabs PDA100A (beam radius 40 mm) beam spot on GV 16.0000 mm → from the center IYA IYC beam spot on GV 8.0000 mm → from the center sweep BS alignment PRM PR3 PR2 BS IXC IXA EXA

Pointing Back from Y arm (Mar 11) Evacuate EYA if possible Put PD in BS chamber, sweep ETMY alignment by coils, and wait for the PD to get any signal (block X arm beam) PR3, PR2, BS chambers opened EYA sweep ETMY alignment IYA IYC block X arm beam PRM PR3 PR2 BS IXC IXA EXA Thorlabs PDA100A (beam radius 40 mm)

Get Fringe at REFL/AS (Mar 11) Unblock X arm beam and confirm fringing at REFL/AS PR3, PR2, BS chambers opened EYA IYA IYC block X arm beam PRM PR3 PR2 BS IXC IXA EXA Thorlabs PDA100A (beam radius 40 mm)

Close Everything (Mar 12-13) Close remaining bellows and start evacuate the whole IFO (continue evacuation during observation) EYA IYA IYC evacuate PRM PR3 PR2 BS IXC IXA EXA put bellows

Lock Michelson (Mar 14) Lock Michelson with REFL PD EYA IYA IYC PRM BS IXC IXA EXA

Plan B (if we don’t see the beam at EX)

Evacuate Central Part (Mar 8) Put AS screen in BS chamber, put all the bellows, and evacuate the central part Open gate valves at IX/IY EYA IYA IYC evacuate open this GV PRM PR3 PR2 BS IXC IXA EXA put bellows AS screen (beam radius 40 mm) Thorlabs PDA100A (beam radius 40 mm)

All the rest Pointing to X arm (Mar 9) Back to IFI from X arm (Mar 10) Pointing to Y arm (Mar 11) Back to IFI from Y arm, and get fringing (Mar 12) Evacuate EXA and EYA (Mar 13) Lock Michelson (Mar 14) We skip beam profiling at EXA Use cameras/screens/irises(?) after evacuation of the central part