Stefan Leedham 22 November 2007

Slides:



Advertisements
Similar presentations
Application of User Pays Principles to Existing Service Lines 22nd November 2006.
Advertisements

1 Project Smart Metering Portfolio Foundation Updates June 2013.
Orifice Plate Meter Error Stuart Gibbons, Extraordinary Offtake Arrangements Workstream Meeting: 16 October 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
ISO 9001:2008 What did the November 2008 amendments to ISO 9001 mean to you?
Potential reforms to the CoS meter reading process for smart gas meters Setting the open letter in context Rachel Hay 16/01/14.
NTS to LDZ Meters – Audits & Validations Created by Alison Chamberlain on behalf of Transporters, for meeting 6 th August, 2010, 31 Homer Road Solihull.
Offtake Metering Errors Stephen Skipp Asset Manager (Transmission and Storage)
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Compliance with the WTO Technical Barriers to Trade Agreement and Steps Toward Developing Good Regulatory Practices Bryan O’Byrne Trade Compliance Center.
Research & Technology Implementation TxDOT RTI OFFICE.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
IRTP Part D PDP WG Items for Review. Items for Review Policy Development Process WG Charter GNSO WG Guidelines.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Discussion of RTF Wood Smoke Analysis Recommendations RTF PAC November 24,
Review Group -140 Thoughts on additional information requirements.
Pilot Grant Program EGAD Study OCCUPATIONAL & ENVIRONMENTAL HEALTH.
Special Meeting on Procedures for Information Exchange November 7, 2007 Geneva Session 1 Anne Meininger United States USA WTO TBT Enquiry Point.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Gas Performance Assurance Framework 11 th January 2013.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
CONFIDENTIAL - Modification Proposal 0395 © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
General Data Protection Regulation (EU 2016/679)
User Pays User Committee 12th November 2013
RBD NOTIFICATION PROCESS
EU Implementation Programme
UNC NOMINATION & ELECTION PROCESSES
Code Governance Review UNC Modification Proposals
Introduction of Code Contingency Guidelines Document
Industry Numbering Committee (INC) Report to the NANC
Allocation of Unidentified Gas Statement - Update
Action 0002: Meter Error Notifications
Orifice plate meter error resolution – cash flows
Change Management Committee – June 2019 Update
Assignment Workshop 2 16th September 09, Solihull.
Connected System Exit Points Administration Options
UNC Modification 0335 – Offtake Metering Error Payment Timescales
LDZ Offtake Meter Orifice Plate Error
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Connected System Exit Points Administration Options
Key Value Indicators (KVIs)
Transmission Planning Code Review
Introduction of Code Contingency Guidelines Document
UKL Committee - DN Interruption Update
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
AUG Query Responses 21st November 2013.
Proposed Transitional Gas Exit Arrangements
Transmission Workstream 2nd December 2010
PROJECT NEXUS FUNDING – THE CUSTOMER’S VIEW
Measurement Error Notification Guidelines for NTS to LDZ and LDZ to LDZ Measurement Installations Review 2014.
MP0131: Meter Error Notifications
Stefan Leedham Transmission Workstream 2nd November 2006
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
Implementation Approach Distribution Workgroup – June 2014
UNC MOD 213: USER PAYS GOVERNANCE ARRANGEMENTS
Meter Reads.
DSC Change Committee Update
Joint Office UNC Elections
Joint Office UNC Elections
Joint Office UNC Elections
Presentation transcript:

Stefan Leedham 22 November 2007 MEASUREMENT ERROR NOTIFICATION GUIDELINES FOR NTS TO LDZ METERRED OFFTAKES AND LDZ TO LDZ METERRED TRANSFERS Stefan Leedham 22 November 2007

OVERVIEW Background to 131 Review Group Outputs of 131 Review Group Information Provision Role of the Offtake Committee and Shippers Independent Experts

OUTPUTS OF 131 REVIEW GROUP The 643 Notification Process duplicated a lot of discussions that would already have occurred Introduce concept of significant meter error process Increased transparency would be beneficial The OAW and Offtake Committee to discuss meter error report No potential to delay the process for commercial gain in light of 126 review group Avoid need for expert determination

INFORMATION PROVISION On identification of measurement equipment error downstream Transporter to provide information on error: Location of measurement equipment Relevant LDZ Brief description of error and cause Date when error discovered Duration of the error Estimate of the total energy in error and total volume Impact of the measurement equipment error (credit or debit) Average flow rates Anticipated Meter Error report publication date Contact details Information updated at least every 21 business days via Joint Office

ROLE OF THE OFFTAKE COMMITTEE For meter errors greater than 50GWh OAW to provide forum for discussion Downstream Transporter to provide updates to the OAW Shippers able to use the OAW to raise issues and questions Downstream Transporter to respond to issues and answers Sub-committee can be formed to discuss error further on request Updates to continue to be provided until MER completed and ready to be submitted for reconciliation Discussions limited to technical issues

INDEPENDENT EXPERTS For significant errors tendency for an expert to be appointed Offtake Committee to appoint an independent expert to construct MER Expert to report to Offtake Committee and provide reports to relevant forum Expert to decide on appropriate methodology to be employed Expert to take decision on when MER completed and ready to be submitted for reconciliation Final meeting held to discuss outputs of MER and address any final issues Need for dispute process removed for significant meter errors

QUESTIONS?

THANK YOU