Grid space coating-updates 05/01/2012

Slides:



Advertisements
Similar presentations
ANL MCP #145 Phosphor Tests 1/24/2011 Incom substrate, 33mm diameter, ANL MCP#145 20µm pores, 8° bias, 60:1 L/D, 65% OAR Chemistry 2 resistive layer, MgO.
Advertisements

Main Title Here Additional copy here, additional copy here, additional copy here, additional copy here, additional copy here. ADD YOUR WEB ADDRESS HERE.
TITLE OF THE SHOW (another line is also possible) Optional subtitle here.
End-Spoiling of Electrodes from Photonis June, 24 th 2010 Qing Peng, Anil U. Mane, Jeffery W. Elam ALD Research Program, Process Technology Research Group.
Capacitive-Resistive Spacers by ALD Jeffrey Elam, Qing Peng, Anil Mane, Joe Libera Argonne National Laboratory May 4, 2010.
Speed-I View from Material Side Qing Peng, Anil U. Mane, Jeffrey W. Elam Energy Systems Division Argonne National Laboratory Limitations on Fast Timing.
Fabrication pH Electrode Using Lift-Off Method and Electrodeposition Presented by Na Zhang.
O. Siegmund 11/15/11 20 cm and 33mm MCP Test Progress Lifetest with #164/163 continues – now close to 2 C cm -2 New batch of 33mm test MCPs arrived Chem-3.
Lab 4: Microsoft word 1 Header and Footer, References & Review.
Existing fabrication facilities for PC's for imaging MCP detectors Dr. O.H.W. Siegmund Experimental Astrophysics Group Space Sciences Laboratory University.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.
ALD 20µm Microchannel Plates
O. Siegmund, J. McPhate UCB, SSL 1 8in Photocathode 2 nd Try 8” PC/Seal Test Chamber –
Facilities and Program for Coating 8” Plates Jeffrey Elam, Anil Mane, Qing Peng, Joseph Libera Argonne National Laboratory LAPD Collaboration Meeting June.
Electrical measurements of sputtered NiCr on grid spacers (GS2mm) Dean Walters, Anil Mane Guy Harris, Jeff Elam.
Design and fabrication of electrical measurement system for microchannel plates (LAPD weekly group meeting) Feb Anil Mane, Qing Peng, Jeffrey Elam.
Preparation of Mock tile MCPs Anil Mane, Qing Peng, Jeffrey Elam Argonne National Laboratory.
Berkeley Update Oswald Siegmund & Jason McPhate LAPP Weekly Telecon 11 January 2011.
O. Siegmund, UCB, SSL 1 Incom substrate, 33mm diameter, ANL#103 20µm pores, 8 deg bias, 60:1 L/D, 65% OAR Electrode deposited last (on top/bottom) ANL.
O. Siegmund, J. McPhate UCB, SSL 1 SSL 8in Photocathode 3 rd Try 8” PC/Seal Test Chamber –
Space Sciences Laboratory, University of California, Berkeley Arradiance ALD/Incom MCP Scrub and Life Test Incom substrate 40µm pores, 8 deg bias, 40:1.
Main Title Here Additional copy here, additional copy here, additional copy here, additional copy here, additional copy here. ADD YOUR WEB ADDRESS HERE.
Atomic Layer Deposition for Microchannel Plates Jeffrey Elam Argonne National Laboratory September 24, 2009.
Status of ALD MCP Program at Argonne within last Six Months Qing Peng, Anil Mane, Joe Libera, Jeffrey Elam Energy Systems Division.
33mm MCP Testing at UC Berkeley
Status and Results of ALD Microchannel Plate Program
Atomic Layer Deposition for Microchannel Plate Fabrication at Argonne
[Presentation Title] – Edit this footer by clicking on “View” tab,  “Slide Master” button  this slide’s layout [Date] Changing... Leading... Learning...
[Insert Header Here] [Type Fact #1 Here] [Type Fact #1 Here] [Drag your image on top of this box and resize it using the handles on the edges]
Update from ALD group IN ANL Qing Peng, Anil Mane, Jeff Elam Energy System.
(8”x8”) MCPs Resistance Measurements Oct 04, 2011 Anil Mane, Jeffrey Elam.
(8”x8”) MCPs Resistance Optimization by ALD Sept 20, 2011 Anil Mane, Jeffrey Elam.
Carbon-Foil for reducing first strike issues
PRESENTATION TITLE Presenter’s Name.
Nanocrystal Diamond SEE Layer for MCP’s
First Mock Tile: Resistive ALD and construction
MCP Electrodes and End Spoiling
SSL-UCB, ALD/Incom MCP Test
ALD work status and next plan Nov
UCB Progress with 8” MCPs and Testing
Time-of-flight with LAPPD MCP-PMTs & MRPC
Resistive coating on spacers by ALD
Presentation Title Subtitle or Date.
Surface morphology of p-GaAs
Aileen O’Mahony, Anil Mane, Jeff Elam 1/21/2014
Update on 8” MCP Coating in Beneq
Presentation Title Subtitle or Date.
UCB Progress with 8” MCPs and Testing
Plans for ALD on Large Substrates (8”x8”) July 5, 2011
Claflin Scholars Luncheon
Faculty of Humanities Insert title here.
Large area Inconel coatings
0º 5ºE 10ºE 15ºE 20ºE 25ºE 30º 5ºW 10ºW 15ºW 20ºW 25ºW 30ºW 5ºN 10ºN
Arradiance ALD/Incom MCP Test
Status of ALD on (8”x8”) MCPs/Substrates Jan
Status of AAO 33mm plates at ANL
Main Title Here ADD YOUR WEB ADDRESS HERE
YOUR text YOUR text YOUR text YOUR text
ALD work status and next plan Nov
Faculty of Humanities Insert title here.
Insert Presentation Title Here Insert Presentation Summary Here
First Mock Tile: Resistive ALD and construction
Incom MCP 20µm Substrates 7/27/2010
Status of ALD 33 mm MCP Development at Argonne
Anil Mane, Qing Peng, Jeffrey Elam Argonne National Laboratory
Faculty of Humanities Insert title here.
ALD on MCPs updates LAPD group meeting presentation 10/16/2012
Faculty of Humanities Insert title here.
Presentation transcript:

Grid space coating-updates 05/01/2012 Anil Mane and Jeffrey Elam Go to ”Insert (View) | Header and Footer" to add your organization, sponsor, meeting name here; then, click "Apply to All"

Internal parts needed for a 8”x8” tile Objective Build a 8”x8” frugal tile MCPs based detector Internal parts needed for a 8”x8” tile Main internal parts: a) Two 8”x8” MCPs b) Two 2mm grid spacers c) One 4.45mm grid spacer Go to ”Insert (View) | Header and Footer" to add your organization, sponsor, meeting name here; then, click "Apply to All"

What we have for 8”x8” tile? Layer Thickness (mm) R Layer(MOhm) V(V) I(μA) grid A 2 1.7 170.0 100 MCP 1 1.2 8 800.0 grid B 2.0 200.0 MCP 2 10.0 1000.0 grid C 4.45 3.6 360.0 Total 10.85 25.3 2530.0 Both MCP1 (8M) and MCP2 (10M) tested @ UCB and shows stable resistance Go to ”Insert (View) | Header and Footer" to add your organization, sponsor, meeting name here; then, click "Apply to All"

Photograph of Grid spacers: Note: Many thanks to Dean and his team for NiCr electrode deposition GS 4.45mm GS 2mm Go to ”Insert (View) | Header and Footer" to add your organization, sponsor, meeting name here; then, click "Apply to All"

Grid spacers I-V data: If needed we will make another set of grid spaces Go to ”Insert (View) | Header and Footer" to add your organization, sponsor, meeting name here; then, click "Apply to All"

Plan for demountable: Baking of all the demountable internal parts in vacuum @ 150C. Baking of top plate in new oven @ 100C. Assemble in clean room @ ALD lab (ready). Testing demountable at APS. Good luck to LAPD group!! Go to ”Insert (View) | Header and Footer" to add your organization, sponsor, meeting name here; then, click "Apply to All"