Baltic synchronization plan

Slides:



Advertisements
Similar presentations
Operating Reserves --- Again A Discussion Primer
Advertisements

Black Sea Energy Conference Bucharest April 3-5 Bo Normark
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Joint Grid Code Review Panel POR Working Group Meeting 2 27 th March 2015 Chairperson : Michael Preston.
BALTIC RING STUDY From the beginning of 1996 to early 1998, 18 power companies and utility organizations from the 11 countries around the Baltic Sea have.
Lithuanian TSO view on the Baltic electricity market development Robertas Staniulis 14th Baltic Electricity Market Mini-Forum, Riga September 21, 2012.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Voltage and frequency control of the grid Minute Lectures A complex system In Europe, all electrical grids are interconnected This large international.
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
1 The Tres Amigas SuperStation VLPGO November 2011.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
Lithuanian energy independence strategy: main achievements and remaining challenges Rokas Masiulis Minister of Energy
Renewables and Transmission Task Force Report to WMS March 20, 2007.
Moldova Country Program Gretel Gambarelli World Bank Chisinau, 28 October 2009.
Changing the way europe provides heat and electricity for a sustainable future.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
20th Century Electric Transmission Grid
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
A Nordic vision for 2025 Nordic TSO Cooperation – more focused and effective.
Nord Pool Spot update 11th Baltic Electricity Market Mini-Forum October 01, 2010 Hando Sutter, Nord Pool Spot AS.
Update from the United States Standards and Conformity Assessment Work in the Sub Committee on Standards and Conformance.
HVDC Transmission.
1 The Tres Amigas SuperStation Low Carbon Summit October 22, 2011.
INSTITUTE OF POWER ENGINEERING GDAŃSK DIVISION Some Results of the Study „ Integration Possibilities of Wind Energy with the Polish.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
GC0104 – Demand Connection Code (DCC)
Operation of power systems with high shares of wind power
SOLAR PROGRAMS Presented By Benjamin H. Jordan, P.E. 4/2016.
National Market for Instantaneous Reserves
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
New transparency guidelines
Challenges of integrating Variable Renewable Energy Sources (V-RES)
IG meeting, December 5th, 2012, DERA premises, Copenhagen
Patrick Smith, Vice President
Implementation of Connection Network Codes The French process
Baltic Sea Region Programme : New Funding Opportunities
Public workshop: CBA 3.0 –come and improve with us the transmission and storage assessment methodology Brussels 07 November 2017.
Introduction To Reactive Power
EU-IPA12/CS02 Development of the Renewable Energy Sector
Implementation of Connection Network Codes The French process
A-5 Limits on amount of exchange or sharing of FRR between Synchronous Areas according to Article 118(z) SOGL.
Synchronous Area Framework Agreement for RG CE
Pekka Vile, Senior analyst, Fortum Power and Heat Oy
Imbalance Netting Platform
Counter-activations Compromise proposal for counter-activations in the mFRR- and aFRR-Platforms.
FAT aFRR Summary memo.
Gas balancing – where next
A-6 Limits on amount of exchange or sharing of RR between Synchronous Areas according to Article 118(aa) SOGL.
HVDC Transmission Systems:
26. January 2013 Erik Skjelbred, Snr VP Statnett
Term Project: Challenges in supplying Energy to Central Region
Marine Strategy Framework Directive: Transposition and Implementation
Marine Strategy Framework Directive: Status of reporting
Problems identified by NRAs that may lead to new infrastructure needs
Legal and implementation issues update
ESF monitoring and evaluation in Draft guidance
Project intervention logic
Projects of Common Interest
XBID – A review of our 1st year and future plans
Basic principles of the Trial Period (1/2)
Presentation transcript:

Baltic synchronization plan Alexander Mondovic ENTSO-E Baltic Synchronization Stakeholder Workshop 20 December 2018, Tallinn

Baltic synchronization plan 1 Outcome of the Baltic Frequency Stability Study 2 Effects on other synchronous areas 3 State of play of ENTSO-E procedure (system extension process)

Baltic synchronization plan 1 Outcome of the Baltic Frequency Stability Study 2 Effects on other synchronous areas 3 State of play of ENTSO-E procedure (system extension process)

Baltic Frequency Stability Study Scenario number 3 from previous studies Synchronous interface on existing double circuit 400 kV AC line between Poland and Lithuania New submarine HVDC link between Poland and Lithuania Study contractor: Institute for Power Engineering, Gdansk Division (IEN) Professor Krzysztof Madajewski Study consultant: Professor Eckhard Grebe HVDC link (new link in orange) AC double circuit tieline

Schematic view PL LT RU LV EE SE FI Building up the understanding of how Baltic TSOs will be interconnected and operated Existing HVDC links New submarine HVDC link between Poland and Lithuania (minimum 500 MW, maximum 700 MW of commercial capacity and 100 MW of overloading capacity) AC interface: existing double circuit 400 kV line between Poland and Lithuania

Purpose of the AC interface PL LT RU LV EE SE FI In case of any outage in Baltic States and of their HVDC links, the Continental European (CE) system provides immediate support across the AC interface But what if the AC interface itself fails?

No physical flows > 100 MW on the AC interface PL LT RU LV EE SE FI If the AC interface fails, there is no AC support from CE Support can be provided only via HVDC links If the AC interface is used for physical flows, commercial capacity on HVDC links has to be blocked in advance to provide support in case of losing the AC interface, with less potential socio-economic benefit To avoid physical flows on the ACE interface, the commercial capacity CE/Baltic will in the first place be put on the HVDC link PL/LT Physical flows on the ACE interface due to additional commercial transactions will have to be eliminated by counter-trading or, in the future, enabled by installing batteries counteracting the outage of the AC interface The AC interface will, from operational point of view, be used as “life insurance”

And what if there is another outage after the loss of synchronism? PL LT RU LV EE SE FI Within the first 15 minutes after loos of synchronism Baltic and other TSOs will activate fast reserves (FRR) and decrease the flows on HVDC links After this, the HVDC links will be able to provide support in case one of them or a generator in Baltic States fails FRR down Decrease flows, free a portion of HVDC links’ capacity ! FRR down Next outage(s) ~ FRR up

Keeping the necessary level of system inertia Why?

Because a too high Rate of Change of Frequency (RoCoF) can lead to a black-out

Synchronous condensers will have to be installed in Baltic States (at least 4 of them) A level of inertia of 17’100 MWs has to be kept. This will be done with 4 new synchronous condensers with high inertia constants Existing hydro units in LT and LV will have to contribute to inertia (in synchronous condenser operation mode) or else a total of 9 synchronous condensers will be necessary This level of inertia will be kept permanently, i.e. all the time, also during synchronous operation

Costs for synchronous condenser action Costs for keeping 17100 MWs by hydro units in SCm and new SCs Costs for keeping 17100 MWs by new SCs

We need a brain – the Frequency Stability Assessment System (FSAS) FSAS will collect all information from: AC interface HVDC links Generating units Synchronous condensers And also from CE and Nordic synchronous area FSAS will permanently propose optimal solutions for generation, flow, and settings

Requirements for synchronization – summary To commission before synchronization: New submarine HVDC link between Poland and Lithuania (minimum 500 MW, maximum 700 MW of commercial capacity and 100 MW of overloading capacity) – CAPEX: up to 650 mEUR (+ ca. 10% for overloading capacity) At least four new synchronous condensers with high inertia constants in locations suitable also for increasing the short circuit power level and improving the voltage stability – CAPEX: 25 mEUR/unit Frequency Stability Assessment System (FSAS) To update before synchronization: Control systems of the existing HVDC links UFLS scheme CAPEX for FSAS, control systems, and UFLS scheme: up to 10 mEUR

Baltic synchronization plan 1 Outcome of the Baltic Frequency Stability Study 2 Effects on other synchronous areas 3 State of play of ENTSO-E procedure (system extension process)

Impact on the CE synchronous area During synchronous operation of the Baltic States Power System (BSPS) with Continental Europe (CE) power system CE area provides FCR in case of all outages in BSPS Via the submarine cable PL/LT, CE area provides up to 100 MW of fast frequency support in case of loss of synchronism of BSPS (on average once in about 22.5 years) During island operation of BSPS CE area (together with Nordic area) participates in activation of 700 MW of FRR for reducing the flows on HVDC links of BSPS (on average once in about 22.5 years) CE area provides up to 400 MW of fast frequency support (normally less if the Nordic area provides a part of this support) in case of outages in BSPS during island operation (on average maximum once in a century) These points have to be considered in operational planning of the Baltic TSOs and Polish TSO, PSE, all the time, but should normally not lead to additional costs in daily operation

Impact on the Nordic synchronous area During synchronous operation of the Baltic States Power System (BSPS) with Continental Europe (CE) power system Via existing HVDC links, Nordic area provides up to 100 MW of fast frequency support in case of loss of synchronism of BSPS, but only in case the submarine cable PL/LT is not available (on average maximum once in a century) During island operation of BSPS Nordic area (together with CE area) participates in activation of 700 MW of FRR for reducing the flows on HVDC links of BSPS (on average once in about 22.5 years) Nordic area provides up to 400 MW of fast frequency support (normally less if the CE area provides a part of this support) in case of outages in BSPS during island operation (on average maximum once in a century) These points have to be considered in operational planning of the Baltic TSOs and Nordic TSOs all the time, but should normally not lead to additional costs in daily operation

Baltic synchronization plan 1 Outcome of the Baltic Frequency Stability Study 2 Effects on other synchronous areas 3 State of play of ENTSO-E procedure (system extension process)

System extension process The system extension process is in the competence of Regional Group Continental Europe (RGCE) of ENTSO-E Steps System extension application of Baltic TSOs submitted to RGCE on 9 October 2018 RGCE examined the application and found that the continuation of the process is feasible RGCE created the Project Group Baltic and asked them to draft the Agreement with Baltic TSOs (including a Catalogue of Measures) The Agreement with the Catalogue of Measures shall be ready for signature in spring 2019 Further steps Implementation of measures Island operation test Trial synchronous operation Permanent synchronous operation (in 2025 if everything is fine)