Preparing for a Stack Test

Slides:



Advertisements
Similar presentations
Tips to a Successful Monitoring Visit
Advertisements

EPA Regions 9 & 10 and The Federal Network for Sustainability 2005
EMS Auditing Definitions
TEL382 Greene Chapter /27/09 2 Outline What is a Disaster? Disaster Strikes Without Warning Understanding Roles and Responsibilities Preparing For.
Network security policy: best practices
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Radiopharmaceutical Production
Maricopa County Air Quality Department Performance Test Specifics Rob Arpino Environmental Engineering Specialist.
Where to find Information About Facilities. Overview of Title V Permits.
Primacy Revision Application The Arsenic Rule. Major Points Components of Primacy Revision Application Attorney General’s Statement Special Primacy Requirements.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Creating Pathways for Education, Career and Life Success Webinar: Developing a Pathways Plan January 18, 2013 Facilitated by Jeff Fantine, Consultant.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
Environmental Justice & Air Permitting Training - August 15, 2012 EPA Region IV – Atlanta, Georgia.
Reimbursement Statements What you need to know. Let’s Take a Closer Look… …at invoicing, cost ledgers, SB and budget revisions.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
ISO Environmental Management Systems 1 ISO LEGAL AND OTHER REQUIREMENTS.
How to Survive an Inspection Questions What type of inspection is being conducted? Will there be field evaluations involved? What type of information.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Responsibilities of Sponsor, Investigator and Monitor
Contract Compliance Training
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
NJDOE Testing for Lead in School Drinking Water
Incident Reporting And Investigation Program
Surviving the EPA/MDEQ Inspection Process
FTIR - SOME LESSONS LEARNED
Chapter 12 Administrative Controls
Emergency Call Support
Responsibilities of Sponsor, Investigator and Monitor
Major Changes Additional Updates
IRB reporting updates.
Investigator of Record – Definition
Contract Basics For State Agencies.
Preparing for Permit Review
Readiness Review Course
PREPARATION FOR GMP INSPECTION
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Request a Content Change for Novartis.com
Orientation for New Associates
Clinical Engineering Lecture (3).
National Laboratory Association
Request for Proposal - Best Value
Contract Compliance Training
Temporary Works Co-ordination
Project Development and Managing your Build Agenda
November 2005 Liaison Report from P1901
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
GMP Inspection Process
Incident Reporting And Investigation Program
EPA Region 10 Alternate Test Procedures and Method Update Rule
Request for Proposal - Best Value
Florida DEPARTMENT OF HEALTH AND PROVIDERS: A PARTNERSHIP
ASSISTANCE DOGS INTERNATIONAL ACCREDITATION PROCEDURES 2018
Investigator of Record – Definition
Investigator of Record – Definition
How did we do it? Case examples from AIC
Orange ASP Training Module
Manage Meetings.
Montclair.edu/iacuc IACUC at MSU montclair.edu/iacuc
I want to submit a grant. What do I do?
Chapter 12 Administrative Controls
Guidance for Patient Interactions
County Wide Safety Program
Construction Contract Administration
Office Manager Meeting
Project Manager / Utility Liaison
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Preparing for a Stack Test February 2018 Mike Sherer Principal Consultant Trinity Consultants

Agenda General Testing Information Engineering Testing Compliance Testing

Centralized Scrubber

General Testing Info (1 of 3) Be ready for the unexpected! It usually does not go the way it is planned. Plan for additional test runs. Be clear on what is being tested, and that the test methods to be used will provide data required. This includes understanding gas matrix, analytical methods to be used for samples, and all detection limits. Review detection limits with available data (e.g., air flow) to ensure that detection limits will provide usable results. Work with site personnel to determine if any data could be useful for them.

General Testing Info (2 of 3) Understand before testing how to review data once available (don’t sample for unusable data). Review sampling locations to meet EPA Methods Work with testing companies that are similar in your approaches and want to assist facility personnel. Provide safe access for testers. Understand safety equipment needed, provide safety training, and provide company safety procedures.

General Testing Info (3 of 3) Work closely with all personnel involved (including process, engineering, and facilities), with frequent planning meetings. Understand how each process and control device operates, and ensure enough product flow and chemicals available for testing. If control device is involved, ensure operation is reviewed for what is needed for testing (minimum combustion temperature, scrubber recirculation rate, maximum air flow, etc.). Secure enough funding, including contingencies.

Engineering Testing (1 of 2) Engineering testing, including compliance pre-testing, is generally used for understanding control device performance, control device trouble-shooting, and emissions characterization (including process byproducts). Test methods do not need to be performed by EPA or other regulatory test methods. However, these regulatory test methods should be considered as it relates to future compliance testing. There are test methods provided by industry guidance documents (e.g., semiconductor). These test methods can be used for other industries.

Engineering Testing (2 of 2) Good to have test plan for engineering testing. If the engineering testing is prelude to compliance testing, ensure the results will assist in what is needed for compliance testing (meeting permit limits, control device trouble-shooting and repairs, etc.) Consider whether it should be done under Attorney-Client Privilege.

Compliance Testing Also called performance testing. Usually done for air permit conditions and other regulations (NSPS, NESHAP, local regulations, etc.). “Passing” is critical for success. Important to work closely with regulatory agencies and testing companies.

Compliance Testing – Possible Steps (1 of 5) Review air permit conditions and relevant regulations to determine all requirements. Review regulatory agency compliance test guidelines. Develop in-house test plan, with test methods, detection limits, timeline, resources, access equipment, physical stack/exhaust duct modifications, etc. Develop testing company scope of work. Will engineering test be done?

Compliance Testing – Possible Steps (2 of 5) Select testing companies to quote, if quotes needed. Provide detailed scope of work to testing companies, and request quotes with due date. Get funding approved, including contingencies. Select testing company and issue authorization to proceed (e.g., P.O.). Have on-site pre-test meeting and sampling location(s) survey. Develop timeline, actions needed, testing variances, and responsibilities.

Compliance Testing – Possible Steps (3 of 5) Develop test protocol, with regulatory agency submittal form if applicable. Due to business information, confidentiality may need to be claimed and included. Send certified to regulatory agency (some want hard copy and electronic copy). Please ensure enough time before test dates (usually specified in permit conditions). Receive regulatory agency approval of test protocol before test date(s).

Compliance Testing – Possible Steps (4 of 5) Test date notifications may be required, so make sure this is done in test protocol as a defined statement or separate communication as required. Good idea to determine if regulatory agency is observing compliance test and make sure facility access approval is completed. Test day(s): conduct engineering test if applicable, and then compliance test. Testing coordination between all parties involved is critical. Review any data available as it is generated. Food and water are always good!

Compliance Testing – Possible Steps (5 of 5) Review test data and QA/QC as part of draft report development. Testing company should notify facility personnel of any concerns prior to sending draft report. Review and issue final report to regulatory agency within timing allowed. There could be a regulatory agency submittal form. Also further confidentiality claims if needed. Ensure compliance test approval communication is received from the regulatory agency.

Questions?

Contact Us Mike Sherer – msherer@trinityconsultants.com Trinity Phoenix 1661 E Camelback Road, Suite 290 Phoenix, AZ 85016 Phone: 602-274-2900 http://www.trinityconsultants.com/phoenix/