A B Hz Hz Rocky Reach Unit 1 on Frequency Control BA – CFC target=60

Slides:



Advertisements
Similar presentations
POTF Status update.
Advertisements

Developing two year funding in Richmond.. Where are we now? Current scheme has approximately 100 places available for children in term after 2 nd Birthday.
Frequency control (MW-Hz) with wind
Creating and Submitting a Necessary Wayleave Application
Circulating Water System
“10 SECOND” ANCILLARY SERVICE IT IS ALL ABOUT THE “C” POINT.
P A C I F I C C O N C O U R S E D R. S U I T E L O S A N G E L E S, C A P | F | E I.
Western Regulation Usage and Pilot Program Results 1.
E-pledging
FREQUENCY CONTROL DURING BLACK START OPERATIONS
Northeast Congestion Management/SPS in TCR Calculations James J. Teixeira John Moseley.
Load Resource Deployment Summary 2006 to Present 2006 DateTime Duration (min) Amount of Response (MW)Type of Deployment 4/17/200615: EECP Step.
Indistar® Creating school/district plans and tasks.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Chapter 8 Media Planning and Buying Media: still big business Setting media objectives Developing media strategies Media selection procedures Media buying.
Stereo microscope – 5.4% air manual mm spacing manual.
Applications of Logarithms Decibels – Power Gain Decibels – Voltage Gain Frequency and Gain Bode Plot Bode Plot - 2.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
HELP : Integration View : Slide 1 IVR GATEWAY SMS MEZZANINE IVR Content HTTP M/W I-SERVER SQL SMS Content.
Easier to get started Easier to plan Easier to report.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
Effect of generation loss and Frequency Response Characteristics (FRC) on tie-line flow to Southern Region under various scenarios and Target setting for.
MO-260 Medical Office Applications
FREQUENCY CONTROL AND AUTOMATIC GENERATION CONTROL
Volcanoes  Volcanoes form at weak spots in the Earth’s crust.  Magma is a molten mixture of rocky substances. It forms within the Earth in the Magma.
12/19/20151 Lesson 6: Health and Wellness PE Without Boundaries v1.0.
1 Interval Scheduling Time 0 A C F B D G E H
GENERAL BACKGROUND AND SPEED GOVERNORS
Menu bar > MyET account > personal profile Each user can find their own “total online period” here. My suggestion is to let our engineer write an extra.
Restoration Concepts PEAK RC Training Classification: Confidential Version No.: 1.5 Date of Document: Document Owner/Author: B Pederson Classification:
Droop Calculator and Unit Performance Evaluation SAR-003-TRE-001 March 31, 2009 Sydney Niemeyer.
6 Mains Electricity Alternating current. 6.1 Alternating Current Direct current (d.c.) involves the flow of electrons in one direction normally from batteries.
09/20/20061 RTCA, CAM, and SFT Presented by: John Dumas September 20, 2006.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
PowerScheduler Creating a Load Only Scenario. Characteristics of Load Only Current Master Schedule serves as the Master Schedule for next year Much quicker.
海港自由貿易港區及自由經濟示範區之加值作業
Overview of Project Reliability-Based Control Dynamic Transfer Capability Task Force January 31, 2011.
4 Starting Tips to Keep Your Car in Top Condition
Generating Electricity e the need for the National Grid as an electricity distribution system including power use and responding to changing demand.
Date DRILL V = I x R is _________ law. Joule’s law is___________.
Creating an Online Test Session
Current FRRS Language & Explanation of Posted Data
The open loop gain of this op-amp is 105 and the bandwidth is 10 Hz
Communicator : Integration View : Slide 1
Speed Formula - Waves.
ECEN 460 Power System Operation and Control
Understanding Area Balancing
Manual Time Error Correction Discussion
Automatic Generation Control (AGC)
Measure Description Standard Frequency of Measurement
MIT tour of the California ISO Control Center March 31, 2015
Operator Confirmation Change Project
Updating the System Milestones
(x + 2)(x2 – 2x + 4) Warm-up: Factor: x3 + 8
Lesson Four: Building Custom Patient Lists
TBA Schedules.
Graded potential vs action potential
Cash and Cash Management
Lesson 6: Epic Appointment Scheduling Referrals
Debugging Visual Basic Programs
TBA Schedules.
Island Frequency Controller
Lesson 6: Epic Appointment Scheduling Referrals
v = f fn = nf1  = 5558 m 343 = 5558(f) f = Hz 325th harmonic
Access Form Resources New Access Form How-To Guide:
Sound Intensity and Loudness
BA6. BA6 Sprinkler Station Structure Sprinkler Station Structure The metal sheet has been added for being able to install the.
Presentation transcript:

A B Hz Hz Rocky Reach Unit 1 on Frequency Control BA – CFC target=60 Not active – Manual BA – CFC target=60 Not active - Manual Rocky Reach Unit 1 on Frequency Control

A B Hz Hz BA – CFC target=60 Not active – Manual BA – CFC target=60 Rocky Reach Unit 1 on Frequency Control Remove: Rocky Reach Unit 1 on Frequency Control

A B 1. Place BA to “CNI” Hz 2. Place unit(s) in “Auto” To maintain tie at “0”. A B Auto 0 MW BA – CFC target=60 Not active – Manual BA – CFC target=60 Not active - Manual Now we will place the BA AGC control to CNI and unit 4 to “Auto” and it will control the tie line flow to the schedule (currently 0). BA – CNI Active - Auto

Schedule 100 MW from one BA to another Schedule 100 MW from one BA to another. As Sherrill indicated, you cannot enter a negative schedule. Schedules Are “from” and “to”.

A B Hz 1. Place BA to “CNI” 100 MW BA – CFC target=60 Not active – Manual Now we will place the BA AGC control to CNI and unit 4 to “Auto” and it will control the tie line flow to the schedule (currently 0). BA – CNI Active - Auto Now with the 100MW Schedule in place, the Units in “auto” with control Tie line flows to 100MW (directional).

c

c