5 September 2012 Joanna Ferguson

Slides:



Advertisements
Similar presentations
Review of UNC Section Q “Emergencies” Steve Pownall Transmission Workstream.
Advertisements

1 Project Nexus Modelling costs and benefits Andrew Wallace, Cesar Coelho Ofgem Project Nexus IA Subgroup 25 July 2012.
1 Project Nexus Analysis of impacts and next steps Cesar Coelho Ofgem Project Nexus UNC Workgroup 03 April 2012.
Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Credit Scenarios – Modification 0335 Joanna Ferguson.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 Smart Metering Portfolio DCC Day 1 Project Smart Metering Portfolio Focus Group Project Update Thursday 06 th June 2013.
UNC Modification Proposal Daily Metered Elective Action 005: User Pays Proposal Simon Trivella – 4 th November 2008 Development Work Group 0224.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Panel Constitution and Voting Rights Tim Davis March 2010.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
1 Modification 437 – Blank MAM Identities Distribution Workgroup December 2012.
Proposer: Matthew Hatch Panel Date: 15 th May 0501: Treatment of Existing Entry Capacity Rights at the Bacton ASEP to comply with EU Capacity Regulations.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Industry Dialogue on xoserve Services 14 th September 2007.
V User pays change scenarios 8 th October 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 3 rd May 2012.
IGT and Shipper Workgroup meeting 28 th February 2011.
Customer Charge On behalf of all DNs 19 November 2010.
User Pays User Committee 12th November 2013
FGO: ASA Service Line Review
Credit Arrangements – Independent Assessments
Modifications iGT 039 and GT 0440 re iGT Agency Services background
EU Implementation Programme
User Pays Funding – Potential Licence Mechanism
PN UNC Workgroup Invoicing 4th October 2011.
مدیریت استراتژيک منابع انسانی
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
Proposer: National Grid NTS Panel Date: 17th April 2014
Smart Metering Consequential Changes
NTS Entry Charging Review Update
DSC ChMC CSS update 7th November 2018
Simon Trivella – 22nd May 2008 Distribution Workstream
Assignment of NTS Entry Capacity – Background and UNC Obligations
User Pays – Changed & New Services
UNC 0621L: Amendments to Gas Transmission Charging Regime
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Chris Warner UNC Modification Panel 21 December 2017
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
Joint Office Presentation for Modification 0678
Distribution Workgroup 8 August 2012 Joanna Ferguson
Topic raised at July 2009 Distribution Workstream
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Proposer: Transporter /
MOD Deemed applications – User pays initial thoughts.
Ռազմավարական կառավարում
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Proposed Transitional Gas Exit Arrangements
UNC 0621L: Amendments to Gas Transmission Charging Regime
REC Enquiry Services Schedule
Modification 0448 – European Driven Change Process Flow Diagram
Proposer: Debbie Brace Panel Date: 20th March 2014
Original Design Developed by team at UC Berkeley.
Modification 501 slides for Workgroup
User Pays Principles and Governance
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Implementation Approach Distribution Workgroup – June 2014
Dis 1208: Mod The ability and requirement for Users and Transporters to raise issues to be considered by the Allocation of Unidentified Gas Expert.
PN UNC Workgroup (AQ topic)
Transmission Workstream 05 November 2009
Mod 0489 EU Balancing Code - Information Provision changes required to align the UNC with the EU Code Debbie Brace 25th April 2014.
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Proposer: Tracey Saunders, Northern Gas Networks
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

5 September 2012 Joanna Ferguson Modification 0430 – Action 001 5 September 2012 Joanna Ferguson

Action 0430/001 Transporters to review the DECC quantitative view of benefits and produce various ACS options for discussion Review of DECC 0009 IA response (April 2012) sets out summary of benefits allocated to various parties Network benefits are split into constituent parts

UNC 0430: Network Benefits

UNC 0430: User Pays ACSs Based on the analysis of the DECC Impact Assessment and the discussions held at the workgroup the following User Pays allocations should be prepared for the ACS: User Pays Allocation Matrix 100% Shipper All Users by SPC Mandated Users by SPC 99% Shipper : 1% Transporter