Eric van Herwijnen March 10th 2005

Slides:



Advertisements
Similar presentations
CHEP 2012 – New York City 1.  LHC Delivers bunch crossing at 40MHz  LHCb reduces the rate with a two level trigger system: ◦ First Level (L0) – Hardware.
Advertisements

K.Harrison CERN, 23rd October 2002 HOW TO COMMISSION A NEW CENTRE FOR LHCb PRODUCTION - Overview of LHCb distributed production system - Configuration.
L. Granado Cardoso, F. Varela, N. Neufeld, C. Gaspar, C. Haen, CERN, Geneva, Switzerland D. Galli, INFN, Bologna, Italy ICALEPCS, October 2011.
Control and monitoring of on-line trigger algorithms using a SCADA system Eric van Herwijnen Wednesday 15 th February 2006.
Vincenzo Vagnoni LHCb Real Time Trigger Challenge Meeting CERN, 24 th February 2005.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Designing a HEP Experiment Control System, Lessons to be Learned From 10 Years Evolution and Operation of the DELPHI Experiment. André Augustinus 8 February.
Nightly Releases and Testing Alexander Undrus Atlas SW week, May
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001.
Report on the Commissioning Task Force activity Global and sub-detector views on ECS Histogram handling : – histogram handling and PVSS – the ALEPH and.
ALICE, ATLAS, CMS & LHCb joint workshop on
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
ALICE Use of CMF (CC) for the installation of OS and basic S/W OPC servers and other special S/W installed and configured by hand PVSS project provided.
Status of Farm Monitor and Control CERN, February 24, 2005 Gianluca Peco, INFN Bologna.
LHCb-ATLAS GANGA Workshop, 21 April 2004, CERN 1 DIRAC Software distribution A.Tsaregorodtsev, CPPM, Marseille LHCb-ATLAS GANGA Workshop, 21 April 2004.
Clara Gaspar, July 2005 RTTC Control System Status and Plans.
Root – LHCb Online meeting Eric van Herwijnen Thursday June 14, 2006.
March 7th 2005 Stefan Koestner LHCb week ECS-tools for the CCPC/Tell1 (Installation): Many problems/user- requests already arises when installing the framework.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Configuration database status report Eric van Herwijnen September 29 th 2004 work done by: Lana Abadie Felix Schmidt-Eisenlohr.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
SPI NIGHTLIES Alex Hodgkins. SPI nightlies  Build and test various software projects each night  Provide a nightlies summary page that displays all.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
INFSO-RI Enabling Grids for E-sciencE Using of GANGA interface for Athena applications A. Zalite / PNPI.
LHCb Configuration Database Lana Abadie, PhD student (CERN & University of Pierre et Marie Curie (Paris VI), LIP6.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
Calibration & Monitoring M.N Minard Monitoring News Status of monitoring tools Histogramm and monitoring meeting 6/02/08 Calibration farm brainstorming.
Maria del Carmen Barandela Pazos CERN CHEP 2-7 Sep 2007 Victoria LHCb Online Interface to the Conditions Database.
Clara Gaspar, February 2010 DIM A Portable, Light Weight Package for Information Publishing, Data Transfer and Inter-process Communication.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Use of CMT in LHCb CMT Workshop, LAL (Orsay) 28 th February - 1 st March 2002 P. Mato / CERN.
Windows Server 2003 { First Steps and Administration} Benedikt Riedel MCSE + Messaging
LHCb Software Week 25/11/99 Gonzalo Gracia Abril 1 r Status of Geant4 in LHCb. r Ideas on how to populate the LHCb Detector Description Data Base (LHCb.
Yu. Guz 16/04/20081 Radioactive source status R. Dzhelyadin, Yu. Guz IHEP, Protvino.
SQL Database Management
Managing and Monitoring Windows 7 Performance
Development Environment
University of Wisconsin at Madison
CMS High Level Trigger Configuration Management
Hands-On Microsoft Windows Server 2008
Controlling a large CPU farm using industrial tools
ICE Monitoring – status 10 February 2010
How to Fix Microsoft Office Error 2932 at Support Number
TriggerDB copy in TriggerTool
The LHCb Run Control System
GAUSS Work plan Software Week 6 March 2002 F.Ranjard / CERN.
Using JDeveloper.
Exploring the Power of EPDM Tasks - Working with and Developing Tasks in EPDM By: Marc Young XLM Solutions
Philippe Vannerem CERN / EP ICALEPCS - Oct03
What’s new in version 5 of GAUDI
Control and monitoring of trigger algorithms using Gaucho
Exploring the Power of EPDM Tasks Working with and Developing Tasks in SolidWorks Enterprise PDM (EPDM) By: Marc Young xLM Solutions
The LHCb High Level Trigger Software Framework
Gridifying the LHCb Monte Carlo production system
Simulation and Physics
2 Getting Started.
2 Getting Started.
What’s new in version 4 of GAUDI
Summary Computing Model SICb Event Model Detector Description
LHCb Data Quality Check web. cern
First attempt at using WIRED
Status and plans for bookkeeping system and production tools
Use Of GAUDI framework in Online Environment
Configuration DB Status report Lana Abadie
System Center Configuration Manager Cloud Services – Cloud Distribution Point Presented By: Ginu Tausif.
Planning next release of GAUDI
Production client status
Presentation transcript:

Eric van Herwijnen March 10th 2005 Gaucho status report Eric van Herwijnen March 10th 2005

Who? Philippe Vannerem (left last year) Eric van Herwijnen (CERN, come to me if something doesn’t work) Clara Gaspar (CERN) Pere Mato (CERN) Helder Lopes (Rio) Miriam Gandelman (Rio) Fri Jan 21st 2005 Gaucho Status Report

Objectives Control and monitor trigger (Gaudi) processes online PVSS Processes are nodes in ECS hierarchy (FSM) Download appropriate sw from configuration database & send values to application manager Integrated with farm control system Send monitoring data (counters, rates, histograms, status, error messages) to ECS Combine information from individual CPUs Prepare for Real Time Trigger Challenge Fri Jan 21st 2005 Gaucho Status Report

PVSS PVSSDim Server Dim DNS running on a controls PC Gaucho_dll (DIM server) Gaudi job n Gaudi jobs running on n Subfarm PCs

Gaucho production status v1r1 documented, packaged and released http://lhcb-comp.web.cern.ch/lhcb-comp/ECS/Gaucho/ LHCB note 2004-96 used by trigger group System works using a real L1 DaVinci algorithm (F. Legger, Lausanne) Fri Jan 21st 2005 Gaucho Status Report

Current developments Integration with Gaudi done by RIO (Helder Lopes): New MonitorSvc implemented, IMonitorSvc moved into GaudiKernel v18r0 Automatic cleanup on algorithm desctruction New declareInfo method in Gaudi base class Code being tested Select algorithms and properties to run Display and set algorithm properties Traverse Histogram Store and publish histograms on the fly New RootViewer to view histograms with Root PVSS panels updated Fri Jan 21st 2005 Gaucho Status Report

Use taskmanager for jobsubmission instead of plink/ssh Route messages to PVSS instead of cmd window Fri Jan 21st 2005 Gaucho Status Report

Check Root viewer on Linux Study how it could be used (replace PVSS trending tool)

Root viewer Display Hugo Ruiz’ pull histograms (see yesterday’s talk) Run a root macro, publish results back to PVSS Fri Jan 21st 2005 Gaucho Status Report

Gaudi State Machine New option values are given back to DimPropServer Some options are taking into account, others not More important to be able to select algorithms and options before a job starts Find a way to load algorithms into an always running Gaudi shell Fri Jan 21st 2005 Gaucho Status Report

Browsing of transient store No need to rely on the user to publish objects Can browse the store and display its contents Implemented for histograms Fri Jan 21st 2005 Gaucho Status Report

Gaucho job list Test and integrate Helder’s new implementation of the MonitorSvc Package and document current developments Use Bologna’s TaskMgr to start Gaudi On windows, route the Gaudi output to the PVSS message window (on Linux this happens by default) Select algorithms and options and download to a Gaudi shell Use configuration database Fri Jan 21st 2005 Gaucho Status Report