Product Support Strategy Demonstrated Performance

Slides:



Advertisements
Similar presentations
Life Cycle Sustainment (LCS) in DAMIR Briefing by Jeff Frankston.
Advertisements

Curriculum Review LOG 340 “Performance Based Life Cycle Sustainment” Presented to the Life Cycle Logistics (LCL) Functional Integrated Product.
JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
JHP Case Study Exercise 1 UNCLASSIFIED notional data for notional program.
Trini Torres-Carrion. AGENDA Overview of ED 524B Resources Q&A.
DRAFT/PRE-DECISIONAL State Home Construction Grant Program Update State Home Construction Grant Program Update Project Funding VA receives $85M program.
OASD Logistics and Materiel Readiness
Items Required for Process Hand-off
Life Cycle Logistics.
LOG 236 Curriculum Review 15 Jan 2010 Curriculum Review LOG 236 Performance Based Logistics Presented to the Life Cycle Logistics (LCL) Functional Integrated.
CLASSIFICATION (U) 1 GATE 6 SUFFICIENCY REVIEW (SUSTAINMENT) PROGRAM NAME ACAT: ____ Joint Designation: ___ Program Manager Name; PM Code Requirements.
1 Grants.gov Update to the NGP February 1, Grants.gov System Improvements  December 11 – 12, 2010: Oracle Database version 11g upgrade  January.
Strategic Vision Life Cycle Logistics Functional IPT Mrs. Sue Dryden DASD(Materiel Readiness) January 13, 2012.
DAU Life Cycle Logistics Curriculum Review Presented to the Life Cycle Logistics Functional Integrated Product Team (FIPT) 23 JAN 2015.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.
Learning Director, Supportability
Business, Cost Estimating & Financial Management Considerations
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
ISA 201 Intermediate Information Systems Acquisition
PSM Lessons Learned Background
Materiel Solution Analysis (MSA) Phase
Production Considerations
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
Product Support Strategy Demonstrated Performance
DAG CH 3 Figure 11: Weapon System Development Life Cycle
ISA 201 Intermediate Information Systems Acquisition
Life Cycle Logistics DAWIA Certification Requirements (FY18)
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
ISA 201 Intermediate Information Systems Acquisition
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
Range Cost Estimates Estimating Accuracy Trumpet
Cloud in a Rack Tuan Tran 10 March 2016
This template is for guidance FOR OFFICIAL USE ONLY – PRE-DECISIONAL
DAU Acquisition Training Symposium April 3, 2018
A B C Solution Analysis Technology Maturation & Risk Reduction
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Department of the Navy Performance Based Logistics
Product Support Considerations
Adjustments required for program or funding changes Options
DAG CH 3 Figure 18: Weapon System Development Life Cycle
DAG CH 3 Figure 28: Weapon System Development Life Cycle
Product Support Strategy
O&S COST MANAGEMENT: O&S COST INFLUENCE ON PROGRAMS
Fielding plan details and adjustments
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Fielding plan details and adjustments
Definition/Decomposition of Warfighter’s Sustainment Requirements ICD
Planning and Budget Committee
DAG CH 3 Figure 21: Weapon System Development Life Cycle
Cleared for Public Release
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Project Name: This is the final name, and will be used in all future publications. (limit 60 characters) Submitting Firm: Client/ Owner: (not necessarily.
Presentation transcript:

Product Support Strategy Demonstrated Performance SAMPLE PROGRAM: “ABC” Date: Product Support Strategy Metrics Data Sustainment Approach Current (initial CLS covering total system) Future (sub-system based PBL contracts) Issues Shortfall in O&M funding in FYDP Reliability and availability estimates are below goals LCSP requires update before DAB Resolution POM request for O&M restoration submitted Reliability improvement plan with clear RAM goals up for final signature LCSP in draft Metric Antecedent Actual Original Goal Current Goal Demonstrated Performance Current Estimate Materiel Availability 76% 80% 77% 69% 75% Reliability 37 hrs 50 hrs 50.5 hrs 46hrs 48 hrs Operating & Support Cost $7.6B $9.8B $10.4B 10.4B Mean Down Time 12 hrs 20 hrs 18 hrs 18hrs 15 hrs * Test or fielding event data derived from _______ Notes: Sustainment Schedule O&S Data Today Cost Element Antecedent Cost ABC Original Baseline ABC Current Cost 1.0 Unit-Level Manpower 175.5 139.4 158.7 2.0 Unit Operations 102.1 143.0 3.0 Maintenance 30.2 47.5 52.4 4.0 Sustaining Support 98.1 127.7 5.0 Continuing System Improvements 32.6 76.3 86.0 6.0 Indirect Support 38.9 80.8 79.6 Total $477.4 $614.7 $647.4 MS B MS C IOC FRP FOC Sustainment BCA BCA BCA BCA LCSP PBL Recompete LRIP Contract Award Avionics PBL CLS Start PBL Recompete Cost based on average annual per system in BY$K Depot Standup Blended Partnership Startup Total O&S Costs Antecedent ABC Base Year $M $7,638.1M $10,358.3M Then Year $M $8,936.6M $12,749.9M