Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Transfer & Trades Special Transmission Workstream
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Consultation on disposal of part of NTS for CCS 11 May 2009 Bogdan Kowalewicz.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Medium-term TEC Trading ARODG Seminars Glasgow & London February 2007.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Capacity trade and transfer mechanism and the next AMSEC auction Bob Hull Director, Transmission 9 May 2007.
Transfers and Trades Special Transmission Workstream
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Congestion Management
Transmission Workstream 6 January 2011
Interactions with the implementation of RIIO-T1
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Transparency Project GRI NW Region
New transparency guidelines
EU Tariffs Code Update Based on Refined Draft as of 30th October
Exit Capacity Release Methodology Statement
Consideration of issues raised by UNC Modification Proposal 0244
Transmission Planning Code – Draft Document
Review Group 291- Ofgem Update
Transmission Workstream, 01 October 2009
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Planning Code
Transmission Workgroup 4th October 2012
Transmission Planning Code
NTS Entry Charging Review Update
Capacity Methodology Statements
Exit Capacity Substitution and Revision
Background to National Grid’s Baseline analysis
Development of Entry Capacity Substitution
Transmission Workgroup 6th March 2014
Transmission Planning Code Review
Entry Capacity Substitution
Review Group 291- Ofgem Update
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Ofgem presentation to Gas Transmission Workstream
Optimisation of Entry Capacity Modification Proposal
Information Provision for Transitional Exit Capacity
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Entry Capacity Transfers - Constrained Period
Presentation transcript:

Entry Capacity Transfer and Trade Bogdan Kowalewicz Senior Manager, Gas Transmission Policy 30 October 2007

Introduction TPCR Final Proposals settlement included new obligations on capacity Transfer Trade Substitution June 2007 Open letters clarified the new obligations agreed in TPCR Interim arrangements for capacity trade and transfer were put in place to enable capacity transfer for this winter Key objective: better utilisation of existing network assets through reducing the level of sterilised capacity on the network

TTSEC Auction Two rounds of auction held on 27 September and 10 October Capacity traded for November 2007 – March 2008 Good participation in the auction with sold and unsold capacity being moved to where it is valued most

Interim arrangements for this winter Additional capacity sold to where shippers value it most Increase in Aggregate Capacity Holdings after TTSEC November 2007 62 GWh/day December 2007 134 GWh/day ‘Within Zone’ Allocation in Northern Zone Reallocation of capacity to where valued most without capacity loss Better utilisation of existing network assets (i.e. reduction in sterilised capacity) Good progress has been made, but

Considerable scope for improvement … Ofgem outlined a number of concerns in its decision letter on the capacity transfer and trade methodology Shippers outlined a number of concerns in their responses to the NGG capacity transfer and trade methodology consultation Lessons to be learned from initial TTSEC auctions and interim process

Ofgem decision letter on the Entry capacity transfer and trade methodology (6 September 2007) Methodology assessed against objectives set out in the licence Ensuring that trade and transfer is effected in a manner which makes best use of existing network Avoiding material increases in costs (including constraint management costs) Facilitating effective competition We expect to issue a direction requiring NGG to review the entry capacity transfer methodology and to use all reasonable endeavours to have in force by 2 June 2008 an approved methodology statement which has been subjected to this review

Way forward: enduring arrangements (1) Transparency Sterilised Capacity Capacity Degradation

Way forward: enduring arrangements (2) Greater transparency in determination of NAMs, ZAMs ACfAs, and interzonal exchange rates; Need for greater transparency with respect to underlying assumptions and data used; Provision of a rationale for the choice of data; Provision of a rationale for the 150% cap rule; Provision of a rationale for the definition of zones; Desirability of an audit to review how effective the arrangements have been for this winter and what improvements should be made in the light of this experience.

Entry capacity arrangements for this winter Ofgem 19 June 2007 Open letter on the development of the regime ahead of winter 2007/08: NGG has a range of tools at its disposal to release capacity in response to changing shipper demand (eg sale of additional firm and interruptible capacity, forward or option contracts to buyback capacity, etc.) We will monitor NGG to ensure that they act in accordance with their duties and obligations We will investigate where there are reasons for concern and take enforcement action where necessary We will be asking NGG to present a monthly update on capacity outlook and actions NGG has taken to maximise available capacity to shippers through the appropriate forums We have asked NGG to provide Ofgem with weekly updates on capacity released to market