Connected System Exit Points - Update

Slides:



Advertisements
Similar presentations
Application of User Pays Principles to Existing Service Lines 22nd November 2006.
Advertisements

Individual Meter Point Reconciliation. What? Calculation of actual energy used at meter point level for all supply points Allow sites to be accurately.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
PN UNC Workgroup Supply Point Register 25 th October 2011.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Nexus Workgroup CSEP Transition Topic June
IGT Single Service Provision Requirements Update – 27 th March 2013.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PN UNC Workgroup iGT Services 7 th February 2012.
Project Nexus Workgroup – Invoicing 11 th August 2014.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
Connected System Exit Points Options for strategic regime change Chris Warner.
IGT and Shipper Workgroup meeting 28 th February 2011.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
User Pays User Committee 12th November 2013
FGO: ASA Service Line Review
Supply Point Register 7th December 2011
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Code Governance Review UNC Modification Proposals
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Market Trials ChMC 8th August 2018.
Action 0002: Meter Error Notifications
Change Management Committee – June 2019 Update
iGT Agency Services Background
PN UNC Workgroup iGT Services
Modification th July 2008.
R&N Timeline Release 2 Release 3 Feb-19 June-19
Future Release 3.0 – Release 3 Industry Impacts & Recommendation
Change Management Committee – June 2019 Update
Connected System Exit Points Administration Options
Project Nexus Workgroup
CSEPs Reconciliation Proposals
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Change Management Committee – November 2019 Release Update
DSC Change Committee Summary – 11th July
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Connected System Exit Points Administration Options
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
UNC Modification Proposal 0362
Project Nexus Workgroup
UIG Task Force Progress Report
June 2019 Release Scope DSC Change Management Committee
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Project Nexus Workgroup
Deferral of Retrospective Updates Functionality
UIG Task Force Progress Report
Joint Theft Reporting Review (from meeting 1st March 2019)
PN UNC Workgroup iGT Services
CSEPs SPA Rejections November 2007 update
Gas Customer Forum Project Nexus xoserve update (as of 19th July 2010) 26th July 2010 Final.
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
Change Management Committee – November 2019 Release Update
Recommendations - where we are
CSEPs SPA Rejections December 2007 update
Change Management Committee – November 2019 Update
UIG Task Force Progress Report
Actions Updates Action 0282/006 – Exclude from AQ process
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Modification 440 Project Nexus iGT Single Service Provision
UIG Task Force Progress Report
UIG Task Force Progress Report
CSEPs SPA Rejections January – August 2007
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Customer Issue Management CoMC Update for June 2019
UK Link Change Impacts and Release Update
Presentation transcript:

Connected System Exit Points - Update Chris Warner

Background: Industry CSEP Framework xoserve SPA Aggregate Data DN/iDN Invoice (NTS/DN/iDN Network) Reconciliation Volume Uniform Network Code NExA Shipper iGT iGT Network Code SPA Activity Meter Readings Invoice (iGT Network)

Background Review Group 0157 ‘Review of IGT Settlement and Reconciliation Arrangements’ Raised 11 July 2007, Review Group Report approved 17 July 2008 Key issue: Supply Point Discrepancy 6.3% in July 2007 (based on 6 RbD Shippers), Ofgem CSEP working group Driven by recognition that ‘solutions’ may reside outside UNC Significant regime change – Options 1, 2, and 3 Incremental improvements – Option 4

Actions Taken (Incremental Improvements - Option 4) New connections process mapped between IGTs, DNs and xoserve MOD 226 increased mandatory data provided by IGTs CSEPs process changed to validate using DN reference More “stable” data item in project lifecycle CSEPs process changed to use DN CSEPs project data at Accepted status of quote Decoupling administration and billing from engineering aspect Projects still expected to be progressed to Completed CSEPs process changed to manage nested records 18,000 sites, AQ of 265M kWh now held as nested Removal of AQ04 maximum CSEP AQ rejection

Portfolio Mismatch August 2009 IGT total: 1,192,248 premises xoserve: 1,106,701 premises Mismatch August 2009: -85,547 = -7.18% December 2010 IGT total: 1,315,879 premises xoserve: 1,283,985 premises Mismatch December 2010: -33,064 = -2.5% Note: IGT growth of 123,600 properties (10%) in <18 months