TOG Review Group UNC245 Xoserve Actions.

Slides:



Advertisements
Similar presentations
If R = {(x,y)| y = 3x + 2}, then R -1 = (1) x = 3y + 2 (2) y = (x – 2)/3 (3) {(x,y)| y = 3x + 2} (4) {(x,y)| y = (x – 2)/3} (5) {(x,y)| y – 2 = 3x} (6)
Advertisements

THEFT OF GAS TEAM. THEFT OF GAS TEAM PO Box 6803, 31 Homer Road, Solihull, B91 3LT Fax : Free Phone : Seamus Rogers Account.
Reasonable Endeavours Claims Distribution Workstream MOD231 16/12/08.
New project process – timescalesDN xoserve IGT/ Agent Shipper Apply for connection Ref IG123 OR AG123 Issues quote Ref DN123 Accepts quote Quotes Developer/UIP.
ICS 324 Students Marks and Grades
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
Xoserve sense checks & validation Reasonable Endeavours Claims.
Mod 0194 Presentation on the conclusions reached by British Gas Nick Wye On behalf of the I&C Group.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
PN UNC Workgroup Read Validation 4 th October 2011.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
SoS Report PAC – 13th December 2016.
FGO: ASA Service Line Review
Consideration of issues raised by UNC Modification Proposal 0244
Inter-day Energy Transfer – Opportunity and Risk
Simon Trivella – February 2007 Distribution Workstream
xoserve relocation to 31 Homer Road Solihull
Historical T&D charge volatility
Weekly Progress Update 3rd Aug 2018
UIG Task Force Progress Report
الاسبوع الإرشادي.
Removal of redundant legacy standards
Meter Status Table Providing timely opening reads is an obligation to the confirming shippers. However where the confirming shipper fails to meet this.
Reconciliation of Shipper and Supplier Theft Data – April 2018 PAC
PAF Risk Register and PARR mapping
iGT Agency Services Background
Modification th July 2008.
Weekly Progress Update 13 July 2018
NDM Data Sample Analysis: Final Results (2)
New project process – timescales
CSEPs Reconciliation Proposals
Theft on Shipper-less Sites
Weekly Progress Update 15 June 2018
Reasonable Endeavour Claims
Project Nexus Workgroup
Modification 0429 scenarios v2.0
MOD 258A Demand Estimation Sample Point – Shipper Report.
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
Weekly Progress Update 11 May 2018
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
xoserve Theft of Gas Team
Connected System Exit Points - Update
PN UNC Workgroup (Settlement topic)
Performance Assurance – Consideration of Discussions to date
PN UNC AMR Topic Workgroup
Joint Theft Reporting Review (from meeting 1st March 2019)
M Number Creation process
MOD 640 INVOICING VALIDATION RULES
Modification 421 – Updates and Benefits Case
AQ BTU Form – Process & Timeline 29th September 2009
Recommendations - where we are
Review Group 208 / Development Modification Group 194
CONFIDENTIAL - Inter Shipper Discussion Process Initial Discussions © 24 November 2009 EDF Energy plc. All rights Reserved.
MOD 565 Standards of Service
Unregistered and Shipperless Process
UNC MOD 213: USER PAYS GOVERNANCE ARRANGEMENTS
xoserve Services XOSERVE SCOPE Sites Register Maintenance Shipper
Project Nexus Workgroup
Action: RG b -Theft of gas Workshop
Enabling Large Scale Utilisation of Class 3
Xoserve Draft UIG Incentives Modifications 20 May 2019
RAASP DSC Change Management Committee update
Recommendations - where we are
Shipper Reporting Pack Glossary
Presentation transcript:

TOG Review Group UNC245 Xoserve Actions

Action Ref. RG0245 0017 Analysis of CCAC Closures and Subsequent Resubmissions Based On Shipper Theft of Gas Allegations Cleared by xoserve Between 01/04/08 and 31/03/09 I&C Dom All Total Cleared 245 3693 3938 Cleared as CCAC 65 729 794 % Cleared as CCAC 26.53% 19.74% 20.16% CCACs Resubmitted 9 82 91 % of Original CCACs 13.85% 11.25% 11.46% Resubmitted CCACs Cleared 7 74 81 Cleared as Valid* 1 38 39 % Cleared as Valid 14.29% 51.35% 48.15% Cleared as Invalid** 6 36 42 85.71% 48.65% 51.85%

Action Ref. RG0245 0018 Total Estimated Stolen kWhs Year Number of Thefts Total kWhs Average kWhs per Theft 2008/09 745 33,930,713 45,545 2007/08 1,122 52,743,776 47,009