EVLA Advisory Committee Meeting System Status

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
DATA TRANSMISSION SYSTEM MIKE REVNELL. OUTLINE Top level specifications Basic architecture Fiber plant DTS module Digitizers Formatter Deformatter Transition.
1 National Radio Astronomy Observatory EVLA Status -- Jim Ulvestad, for Mark McKinnon, Rick Perley, and the EVLA Team.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
GBT K-band Focal Plane Array Monitor and Control Interface, Cryogenic LNA Bias System February 27, 2008.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Paul HardenEVLA LO-IF CDR May 17, IF Subsystem Specs & Measured Test Data.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
Dan MertelyEVLA Front-End CDR – C-Band Receiver April 24, EVLA Front-End CDR C-Band (4-8 GHz) EVLA Receiver.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Q, Ka, K, Ku & X-Band Receivers Backup Slides.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Paul Harden VLA Veteran EVLA LO-IF PDR 22 January EVLA IF/LO EVLA “LOW BAND” CONVERTERS For 4/P/L/S/C and Ku Bands.
Q, Ka, K, Ku & X-Band Receivers
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Chuck KutzEVLA Front-End CDR – LO/IF System April 24, EVLA Front-End CDR EVLA Front-Ends and the EVLA LO/IF System.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
High Speed Digitizers EVLA Advisory Committee Meeting March 19-20, 2009 Steven Durand & Mike Revnell.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Future LBO Developments
Cosmic Microwave Technology, Inc.
Software Overview Sonja Vrcic
Mark 5 / VLBA Correlator Topics
EVLA Availability - or - When Can I Use It?
The Development of Broadband VLBI Technologies in SHAO
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
Terry Cotter LO/IF Group Leader
Budget, Schedule, Contingency
EVLA System PDR System Overview
Software Requirements
Rick Perley National Radio Astronomy Observatory
EVLA M/C Software PDR, 14 May 2002
EVLA Advisory Committee Meeting
VLA to EVLA Transition Plan
EVLA Receivers PDR Transition Planning Author Daniel (Mert) Mertely
Terry Cotter LO/IF Group Leader
Terry Cotter LO/IF Group Leader
EVLA Advisory Committee Meeting System Status
Software Requirements
Gustaaf van Moorsel September 9, 2003
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Racks Bins and Modules PDR
Data Transmission System Digital Design Chris Langley NRAO
AM-7026 Down Converter-Receiver
Correlator Growth Path
EVLA Construction Status
EVLA Advisory Panel Mtg. System Overview
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

EVLA Advisory Committee Meeting System Status Jim Jackson, Hardware Systems Engineer 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Overview December 2004 Advisory Committee report Antenna status Antenna 13, 14, 16, 18, 24 and 26 Electronics status Currently in or ready for production Nearing production On-going issues Front-end status Other system highlights 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Responses to 12/04 Adv Comm. Solar Headroom No change from last year – passed System, LO/IF and Front-End CDRs Design is result of consultation w/ NRAO solar astronomer Tim Bastian Could be target for descoping Polarization EVLA polarization performance is good – Rick Perley will discuss Mixed polarization performance is transition issue Committee recommended not diverting effort for this Circular vs. Linear – would make VLA > EVLA transition extremely difficult Data Transmission System (DTS) status New formatter and 8-bit digitizer complete DTS is working well and is in production 3-Bit digitizer options under development DTS module built to accommodate 3-bit digitizer assembly 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Responses to 12/04 Adv Comm. Provide capability for redundant LO systems in test racks Completed and in use Test LNA’s with EVLA feeds before production purchase Feed design shouldn’t affect amplifier performance Preliminary testing shows there is no problem L-Band Orthomode Tranducer (OMT) RF performance excellent Issues with noise and cooling Issues with manufacturability 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Antennas Antennas 13, 14 and 16 Turned over to operations for initial scientific use L,C,X,K and Q bands available with 4 IF’s 4/P bands available on antenna 14 Temporary band switching arrangement No Automatic Level Control (ALC) – will add soon Antennas 13 has production LO hardware Antennas 14 and 16 have prototype LO hardware Software compatible, retrofit Mid CY 2007 Tests and evaluation on-going Scientists being encouraged to use antennas in observations 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Antennas Operating since Mid-March w/ 2 IF’s at X-band Fringes obtained within minutes of first power-up X band now available w/ 4 IF’s 4,P,L,C and K bands available mid May Mostly production hardware Temporary test bed for updated hardware New L302 10.8-14.8 GHz synthesizer firmware M301 converter interface for band switching T301 with updated RF Board T304 baseband converter with ALC Caused minor delay in outfitting Turn over to operations likely in early June 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Antennas Outfitting electronics now First fringes expected mid May M302/M303 utility modules will be added Antenna 26 In barn for azimuth bearing change VLA electronics stripped EVLA refit to begin by 1 June 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Electronics Electronics currently in (or ready for) production D301-4 DTS Module – excluding 3-bit digitizer PCB D351 DTS De-formatter F320 Front End Transition Module L300 Synthesizer Reference Generator L301 12-20 GHz Synthesizer L304 LO Reference Receiver L305 / L350 Reference Generators L351 Offset Generator L354 LO Driver L355 Digital Timing Distributor M304 Module ID P301/302 DC/DC Power Supplies T302 LSC Converter T303 UX Converter T305 Baseband Converter - Digital -48 VDC Power System Front End Card Cage Main Shielded Equipment Racks Represents: 68% of Antenna Electronics 80% of Central Electronics 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Electronics Modules in final design – ready for production by 1 July 2006 F317 Front End Controller – In final testing L353 LO Transmitter – PCB Revision Motherboard to integrate design M301 Converter Interface – In final testing M302/M303 Utility Modules – In final testing P350/P351 DC/DC power supply – PCB Revision PCB Mod to support N+1 redundancy Power Dist. Board for Central LO – New PCB Design T301 4/P Converter – PCB Revision Corrects 1024 MHz Isolation Issue on RF PCB Solar Attenuator PCB to be developed module can be produced without this PCB 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Electronics Modules in final design – ready for production by 1 July 2006 T304 Baseband Converter – In final testing New Total Power Detectors New Filter Arrangement L302 10.8-14.8 GHz Synthesizer – In final testing New MIB / DDS FPGA firmware developed Updated units being tested in Antenna 18 Represents: 27% of antenna electronics, 20% of central electronics 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Electronics – On-going Issues L352 LO Round Trip Phase Meter – Low risk Issues with thermal stability – High priority Issues with measurement repeatability Affects use of higher frequency bands New PCB’s developed – integrated motherboard New design being tested in system 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Electronics – On-going Issues 3-Bit digitizer for DTS – Moderate Technical Risk Two design options – Moderate Priority Comparable cost 3 bit / 4 Gsps device being designed for ALMA IC and PCB’s in development at University of Bordeaux, France Some possible issues with design and performance for EVLA 6 bit / 4 Gsps COTS device from Rockwell IC now available PCB in development at NRAO Socorro Still supplies 3-bits to correlator Additional bits provide flexibility and over-range indication Challenging design – very high speed PCB’s (4 GHz clock) Can tolerate some delay Considerable EVLA capability with 8-bit device WIDAR Correlator checkout does not require 3-Bit Digitizer 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Electronics – On-going Issues Network timing – Low Risk / High Priority Current scheme utilizing NTP timing not working well Causing jumps in time as seen by MIB’s in L302 synthesizer Researching GPS time servers to connect to M&C network at VLA Currently affecting test and scientific data 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Front-Ends 4 Band Complete – Using existing VLA receiver P-Band Mostly complete – Using existing VLA receiver Modification required to stop LNA oscillations in S,C and X-Bands L-Band Horn complete and in production Prototype OMT and receiver in lab testing – issues as mentioned Balanced amps from CDL in use on existing and prototype receivers S-Band Half scale feed horn built and currently being tested Receiver to be developed, CDL wideband amps now available Wideband OMT awaiting L-Band results – S-Band will use scaled down version C-Band Interim receiver in production (final receiver minus wideband OMT) OMT design complete - Awaiting L-Band results – C-Band will use scaled down version 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Front-Ends X Band Currently using existing VLA receiver New X-Band will be last to be developed – funding permitting Ku-Band New feed Horn to be developed New Receiver to be developed – will be based on K-Band design K-Band Using Existing VLA Feed and Receiver Added block converter and modified LO/IF chain In production Ka-Band Horn in production Receiver development underway Q-Band Using Existing VLA feed and receiver New MIMIC post amp and block converter 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Front-Ends – On-going Issues L-Band Ortho-Mode Transducer – High Risk / High Priority Reviewed in recent Front-Ends CDR RF performance excellent Progress slower than expected Affects availability of wideband L-Band receiver Also delays S-Band and C-Band – based on same design Delaying Front-end group progress on Ku/Ka band receivers Difficult to build, assemble and test Size and weight – difficult to maneuver Problems with cooling May need to find new materials / fabrication techniques 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

System Status Other System Highlights New shielded room for WIDAR correlator installed & RFI tested Flooring, alarms and utilities being completed now Will be ready well in advance of WIDAR correlator delivery Cryogenic compressors & Scott-T boxes in production Antenna HVAC systems purchased Feed cone assembly in production Azimuth fiber cable wrap in production All fiber optic cable in the ground Fiber optic termination room complete Control building fiber M&C networking in place 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006

EVLA Advisory Committee Questions? 4/16/2019 Jim Jackson EVLA Advisory Committee 8-9 May 2006