Southern Arizona Modelers

Slides:



Advertisements
Similar presentations
Southwest Safety Training Alliance Inc.
Advertisements

Hand Built Cups Beginning Ceramics Burris. Assemble your Materials and Tools Clay Wire Cutter Magazines Paper Towels Needle Tool or Cutting Tool (a pencil.
© 2011 wheresjenny.com How to bake a cake?. © 2011 wheresjenny.com Here are some words about baking for you to learn. boil – to cook in boiling water.
I visited the Sage on Sep I hoped to gain a new appreciation for how the Sage runs. I learned that it takes everyone working together and talking.
A 5 th Grade Level Fraction Game.  Groups of two  2 Different colored pencils per group  Scratch Paper  The Handout  Virtual Dice  Virtual Dice.
Being Polite In Class By: Mitchell (2nd grade student with ASD)
First Grade Sight Words over 115 new 116 sound 117.
Welding. The safety of your self and people around you is FIRST Priority! Here we have some examples of safety equipment.
Buckle Up …For Life. You and Your Seatbelt To the Job. At the Job. From the Job.
Working Successfully With Property Managers: An Interactive Engagement
Sight Word Vocabulary.
Top 10 Routines & Procedures Sarah Rychart. # 10- How to Sit When you sit in your seat: -Sit facing forward - Seat tucked in - Backs straight - Heads.
Play it again. My new place I’m an American Give it away.
Out and About in Beatrice First Graders Visit the Beatrice Fire Department.
Texas Power Plant Project Contractor Texas Power Plant Job Site Overview.
1st Grade Sight Words. out them then your many.
Assignment 1 Submitted to: Mr. Tucker Submitted by: Carolita Shal.
Mrs. Goodman’s class: Your next job is to make a practice test. The following slides have the question. You must fill in the answer and add a picture of.
Algebra I Keystone Test Prep Part 1: Tuesday, April :00 pm-4:00 pm Part 2: Tuesday, April :00 pm-4:00 pm Part 3: Tuesday, May :00.
First Grade Sight Words. over 112 new 113 sound 114.
Topic/objective: TWO-WAY TABLES Ricardo surveyed 110 eighth grade students to find out if they have a part time job. There are 60 students who have a part-time.
Click to start. The Bible Game 2 Click to play!
Work with Older Adults - A Presentation for High School Students
Pervious Parking lot Matthew Cockerham.
Below are the three most common forms of creating hand built pots: pinchpot, coiling and slab techniques.
Bowling Unit Gym 2.
Borough of Conshohocken Authority 2016 Odor Control Project
RUNWAY INCURSION Runway safety and ground operations high visibility issue for FAA and pilots Accident on 11/22/94 at 2203 hrs at STL highlights seemingly.
Mining.
FRY WORDS.
HXD Project Update 8/10/2016.
Math Expectations Warm Up
Truck Transportation Services By Trucksi
Yahoo Mail Customer Support Number
How To Fix An Old Or Clogged Ink Cartridge In Lexmark Printer
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
Work with Older Adults - A Presentation for High School Students
POLE VAULTING FOR BEGINNERS.
Study Skills sheet Due April 12 *will collect during homeroom*
Trimming and Grading seams
Grade 1 Winter Project All about me….
Elodea Slide Drop water on slide Get on elodea leaf from Mrs. Maguire
Elodea Slide Drop water on slide Get an elodea leaf from your teacher
THANK YOU!.
Thank you.
Essential question: How are goods Produced?
MacBeth Act 2 Tossing Lines Opener
Weekly Warm up October , 2018.
How To Tell The Time.
Bunnings Craft Activity
PUSD High Frequency Word List: First Grade
Grinding Nails.
Field Briefing.
Plan to Do Student Speeches
Surgical Education Week 30 April 2018
Rolling Spheres Part 3.
1st GRADE SIGHT WORDS.
DID YOU KNOW THAT YOU HAVE MORE FUN WHEN YOU USE YOUR NATURAL INTELLIGENCE? YES! WE KNEW THAT!!
2nd Hundred Words Mrs. Hicks 2nd Grade.
PREPARATION Get yourselves ready for painting:
Steps To Prepare Site For Site Work Construction Calhoun GA.
Engineers - Turning ideas into reality!

Group Member 1 Group Member 2 Group Member 3
First Grade Sight Words
How can you improve your letter? What will make it more successful?
How Excavation Companies Help You In Construction Projects In Ooltewah, TN.
Presentation transcript:

Southern Arizona Modelers New Runway Construction April 2016

First the surrounding area of the old runway was cleared and scraped.

Prep work being done in the pit area.

Here comes the asphalt grinder.

Asphalt grinder starting with the taxiways.

Harry and members leveling out the ground asphalt.

Here we go, out with the old!

No turning back now with the last bit of asphalt to go.

The ground asphalt was then smoothened out.

Then watered down. Then watered down.

Then rolled. Thank you Empire Equipment!

Howard and members setting survey stakes.

The runway was then graded to the level of the survey stakes.

A little prep work by the asphalt workers.

The first bit of asphalt going down. Starting with the taxiways.

Some SAM members on hand anxious to get to work.

The start of the new runway!

After the taxiways and the edge of the runway down we can start leveling out the edges. After the taxiways and the edge of the runway were down we can start leveling out the edges.

About half way done, waiting for the next asphalt truck. About half done, waiting for the next asphalt truck.

With the new runway completely down we can finish the edges.

With the runway work complete, the outlying area was smoothened and rolled.

The new runway, ready for some smooth landings! The new runway, ready for some smooth landings. Thank you Pima Asphalt Inc.!