FIP/P1-45: Baking of Aditya Ugrade Tokamak

Slides:



Advertisements
Similar presentations
States of Matter.
Advertisements

NeSSI – Enabling TCO Optimization 29 January 2008 – IFPAC2008, Baltimore MD NeSSI* – An Enabling Platform for the Reduction in TCO** of Process Analytical.
LAPD Run 2 Results and Notes Terry Tope
1 Residential Weatherization Calculator Deriving Realistic Savings Estimates for the “Uninsulated” House.
Self Regulating. 2 Key Points in Pitch What do we mean by self regulation? How does it work? So what!!
EPICS Collaboration Meeting – Aix-en-Provence June 2010 Page 1 ITER welcomes EPICS WD Klotz ITER int. Organiztion That’s me.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
EEC 693/793 Wireless Sensor Networks A Short Name of your Paper’s Title Student Name.
Russ Rucinski, Fermilab, March 29, Commissioning is underway! –2 Cassettes installed on 3/18. –Sensors and control heater mounted. –Multi-layer.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Phase Difference = Phase Difference = 0.05.
Endothermic/Exothermic Processes & Reactions
LCGP Project Mini Case Study Hotcat Small (Crossgates)
Passive Solar House A passive solar house is heated by the sun’s energy.
1 INPUT & OUTPUT ■ INPUT * Voltage Side ( PT side ) Operational range : 0-110% Permissible over range : 150% for 10 seconds 120% continuously * Current.
© Hitachi Europe SAS Tous droits réservés. YUTAMPO SHW heat pump.
P1.1.4 Heating and Insulating Buildings
NCSX Helium Bakeout System M. Kalish 3/25/02
The atom of the isotope of uranium used to make nuclear bombs (uranium-235) has an atomic number of 92 and a mass number of The number of protons.
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
Overview of the KSTAR commissioning M. Kwon 3 June, 2008.
Agenda Property Throwdown Closed System Energy Balance Theory
CHI Run Summary for March 10-12, 31 & April 9, 2008 Flux savings from inductive drive of a Transient CHI started plasma (XP817) R. Raman, B.A. Nelson,
Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014.
Heat measurements A few weeks ago we made some measurements on types of insulation A few weeks ago we made some measurements on types of insulation We.
Your Inspection Business Name Goes Here. Your contact information goes here.
Thermal Design Matthieu GASQUET Cranfield University / Rutherford Appleton Laboratory Coseners House July 9th 2002 EUS consortium meeting.
Oil Bath Safety. Oil Bath Use Safety first  Always wear protective eye-wear and gloves.  Do not set the oil-bath temperature.
Passive Solar Energy By: Jake Wylie And Dustin Smith.
Electrics. Solar Energy Solar water heater Efficient way to heat water at no cost all year long. Work by running copper pipes through a solar panel on.
Chicken Housing Ms. Morris Adapted from:
Modular and Sequential Construction of Complex Process Models – Applications to Process Hazard Assessment Mordechai Shacham Dept. of Chem. Engng, Ben Gurion.
Lancaster-Lebanon IU 13 – Timothy Laubach Educational service agency providing services to schools Provide services across the state 125+ locations Pre-K.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Calculation of the integrated energy performance of buildings.
AT/CRG/cd 1 DFBX Low Current Lead Chimneys Consolidation May 16th 2008.
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
INSTALL INSULATION IN BOILER PLANT PROJECT SECTIONS: 1.VALVE JACKETS 2.BOILER REFRACTOR JACKETS 3.PIPING INSULATION / PVC.
Hot-Spot Temperature Experiment Chats Workshop 10 th October 2013 Kamil Sedlak, Pierluigi Bruzzone EPFL-CRPP, Villigen, Switzerland.
Stave thermal analysis Cooling connections CO2 warm Test
Sun Shiner A solar energy based affordable water heater.
Heat and Temperature.
HD POWER TRANSDUCER SERIES
Simon Brown CAT Member - Chester
INSULATION FOR INDUSTRY AND HOUSING
Specific Heat Problems
10th ITPA on SOL/divertor physics, Jan 2008
HEAT.
Prepared by Frank Cooney B.Arch MRIA
HD POWER TRANSDUCER SERIES
Pellet Target for PANDA (current status)
DC Injector and Space Charge Simulation Status
CRYOGENICS OPERATIONS 2008 Organized by CERN
An Excellent Assistance on How to Write your HR Assignment
IBBelle: Status Commissioning at MPP Transport to KEK
HIGH-VOLTAGE TESTING FOR A HIGH-CURRENT ELECTRON GUN
Insulators and Conductors
Application to the VIS/IR Imaging System of ITER
John Dixon Communications Group Lead Locomotion Phase Lead
Incompatibility between MV Switchgear conforming TO the international standards and their use in DNO’s substations M. Arens – Y Tits – Belgium – Session.
Regular Production of Hydrogen and Argon Plasmas.
Real-Time Feedback Control System for ADITYA-U Tokamak Plasma Position Stabilisation ROHIT et al. Development of transfer function models for the fast.
IAEA FIP/P1-34 Thermal Analysis of Protection Important Components (PIC) of ITER XRCS-Survey Diagnostic System S. Varshney et al. The impact of thermal.
An object travels 40 miles in 2 hrs. Calculate its speed?
Phase Changes Notes.
Progress in the ITER Neutral Beam Test Facility
Aim: Full House Grid: 9 Grid Play: Calculate answer & cross it off
Presentation transcript:

FIP/P1-45: Baking of Aditya Ugrade Tokamak Aditya-U tokamak successfully operated prior to phase-2 diagnostic system installation. All necessary in-vessel & Ex-vessel diagnostic systems were install, its integrity/leak tightness confirmed. Specially designed heaters and heat insulation jackets installed on vessel, complete system commissioned with in-house developed control system. Bake-out temperature of vessel is increased gradually from 35 C to 135 C from few min to 48 Hrs & achieved stable bake-out operation. Most of the Mass 18 removed in first 12 hours of Baking, while preforming GDC carried out at 135 C after 12 hours stable temperature, Mass No. 32 was reduced in 3 order. In this paper, the technical challenges faced during installation , commissioning of baking system in Aditya-U tokamak presented in brief.