Larry Salci February 15, 2011 Washington, D.C.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Streetcar Production – Final Phase Transportation and Trinity River Project Committee 14 April 2014.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
EMS Checklist (ISO model)
PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
NFPA 72 and NFPA 101 Supervised Automatic Sprinkler System Overview
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
1 Americans with Disabilities Act Final Rule Transportation for Individuals with Disabilities at Intercity, Commuter, and High Speed Passenger Railroad.
Jack Mc Gowan, CEM Optimize operating cost for cooling Improve Capital Projects Improve learning environments GHP Best Practices Geothermal Heating and.
2015 Update to OBC September 17, 2014.
EPA EMS General Awareness Training Presented by David Guest, Esq. U.S. EPA Washington, D.C.
1 Union Pacific Railroad David Wickersham Chief Engineer, Western Region February 24, 2014.
2012 Minimum School Bus Specifications for Oklahoma Every five years the National Congress on School Transportation meets to review and update the National.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
Contractor Safety Management
Standardization Working Group Report
TECHNOLOGIES AUTOMATED METERING. Proprietary Information Of Energy 2013 MACDILL AFB METERING DOD Implementation Guidance – MAJCOM Energy Mangers shall.
Coping with Electronic Records Setting Standards for Private Sector E-records Retention.
Independent Review of NGEC Standardization Process.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
ISO EMS CONTRACTOR OVERVIEW May /26/10ISO EMS CONTRACTOR OVERVIEW TRAINING ISO EMS OVERVIEW TRAINING Contents What is ISO
Railroad 101 Equipment April 9, Next Generation Corridor Equipment Committee  Established by Section 305 of the Passenger Rail Investment and Improvement.
Introduction Technical Subcommittee developed and completed a technical specification for a Single-level Passenger Trainset on November 18, 2010 that.
0 PRIIA 305 Technical Subcommittee PRIIA Executive Board Meeting March 10, 2010.
Ship Recycling Facility Management System IMO Guideline A.962
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Understanding ISO 22000:2005 TCISys.com.
From Research Prototype to Production
PRIIA Section 305 Next Generation Equipment Pool Committee Ken Uznanski Amtrak Policy and Development SCORT National Meeting September 21, 2010.
ISO OPERATIONAL CONTROL
NE 127 – Codes, Standards, and Regulations NDT & QA/QC Standards: ISO, ANSI, ATA, AIA, IEEE, etc. INSTRUCTOR: Chattanooga State CC.
Introduction to ISO 9001:2000.
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Michael deLamare Requirements Management Program Functions R-9.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Aviation Maintenance Management
Office of Railroad, Pipeline & Hazardous Materials Investigations Survival Factors Crashworthiness.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
The Role of NCAS Assessments NASA Supply Chain Conference Goddard Space Flight Center November 14, 2007.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Company for Urban Innovative Transport (CUIT) 19/12/2007 Request for proposal.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
PRIIA 305 Diesel Electric Locomotive Specification Independent Review Larry Salci February 15, 2011 Washington, D.C.
1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
SE513 Software Quality Assurance Lecture12: Software Reliability and Quality Management Standards.
1 Proposed Amendments to the Verification Procedure for In-Use Diesel Emission Control Strategies August 23, 2012 California Environmental Protection Agency.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Washington DC 14 December 2009 Standardization Power Christopher Loeser Distribution Statement A: Approved for Public Release.
PRIIA 305 Technical Subcommittee Systems Engineering Processes for Passenger Equipment Acquisition and Life Cycle Support Presented at: NGEC Executive.
Insulating Glass Manufacturing Quality Procedure Manual TM (07)
Steve Griffith February 28th, 2017
SQA project process standards IEEE software engineering standards
Positive Train Control
SQA project process standards IEEE software engineering standards
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
Caltrans/ IDOT New Single-Level Passenger Railcars “CALIDOT”
Standardization in the Beauty and Wellness Sector
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Passenger ECP Brake Equipment
Emulsion Task Force Meeting
TRTR Briefing September 2013
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
NGEC Executive Board Meeting
System Safety Regulation
Presentation transcript:

Larry Salci February 15, 2011 Washington, D.C. PRIIA 305 Single-level Passenger Railcar Specification Independent Review Larry Salci February 15, 2011 Washington, D.C.

Introduction Technical Subcommittee developed and completed a technical specification for a Single-level Standalone type passenger railcar on December 15, 2010 for approval by the Executive Board Executive Board created a Review Panel consisting of FRA, Amtrak, and States (stakeholders) to determine: Did the Specification as produced meet the technical design, performance, and operational objectives? Did the Specification development process undertaken by the Technical Subcommittee meet the inclusive process requirements of PRIIA? Review Panel retained a support consultant, Mr. Larry Salci, to assist the Review Panel in its responsibilities Mr. Salci’s report concluded PRIIA Single-level Design Objectives and Performance Requirements were substantially met, and conditional approval of specification is recommended Conditional approval based on need for Executive Board to consider recommendations from Standardization Working Group’s report prior to approval

Scope of Report The Executive Board of the NGEC established a Technical Subcommittee to perform the following three tasks: Task 1. Develop Specification that addresses specific design objectives and requirements and conforms to PRIIA mandates; Task 2. Summarize the Single-level Specification in a manner that provides the Executive Board the information necessary to determine that the Specification complies with all PRIIA requirements and is ready for approval; Task 3. Document the methodology by which the Specification was developed, reviewed, edited and approved by the Technical Subcommittee to verify inclusive industry participation

Task 1 DEVELOP SPECIFICATION THAT ADDRESSES SPECIFIC DESIGN OBJECTIVES AND REQUIREMENTS AND CONFIRMS COMPLIANCE WITH ALL PRIIA MANDATES 85 foot, stainless steel carbody of four car types (Requirements Document is neutral on car dimensions and carbody material): Coach car Cab/baggage car Café/lounge car Business Class car Designed for all FRA Tier I Requirements, performance spec up to 125mph Design allows for new fleet requirements and full operation and functional integration with existing Single-level fleets (Amfleet I, Amfleet II, Horizon, and Viewliners) Design will provide for proven reliable technology, maintainable, cost effective, durable stainless steel carbody and trucks with minimum design life of 40 years

Task 1 (Cont’d) Design is operationally and functionally compatible with wide spectrum of environmental and physical conditions in US Design meets crashworthiness and incorporates Collision Energy Management (CEM) features Design permits any car type defined in specification to be converted to any other car type without requiring modifications to carbody, except possibly Cab car Design complies with all Federal (FRA, EPA, ADA, etc.) regulations and industry standards and best practices

Task 2 A list of the areas summarized by the tables in the report: SUMMARIZE SINGLE-LEVEL SPECIFICATION AND METHODOLOGY TO VERIFY COMPLIANCE WITH SPECIFICATION A list of the areas summarized by the tables in the report: Operational/Performance Requirements Interoperability Requirements Safety Requirements Reliability and Maintainability Requirements Passenger and Amenity Requirements Communication and Electrical Controls Vehicle Standardization Environmental Initiatives Regulatory and Industry Standards Test and Vehicle Acceptance Requirements

Operations/Performance Requirements Single-level cars can operate without restriction in US Speed and operations issues will be governed by FRA, track, and host railroads Cars capable of negotiating 250 ft. radius horizontal curve, 1,000 ft. vertical curve, 5 in. cant deficiency, and no more than 50% wheel unloading stopped on 7 in. super elevation HVAC maintains interior temp range for operation at ambient temps -30 F to 110 F Design and test for up to 125mph operation, on Class 1-7 track Operating range in corridor service up to 600 miles, up to 20 hrs. Specification silent on tilting capability (Requirements-tilting optional) Conventional pneumatic system for service and emergency brake, wheel slide control, and provision for electrically controlled pneumatic system Operates at both high-level and low-level boarding passenger station platforms Cars are fully ADA compliant, wheelchair accessible (two carborne powered wheelchair lifts), accessible toilet room, wheelchair parking station, OTIS ADA compliant

Interoperability Requirements Spec requires complete functionality and operation, either as new standalone fleet or intermingled with other Single-level cars Design allows for easy passenger walkthrough from an existing car to a new car (aligned end door location, diaphragm, walkway) Design allows States/Amtrak to tailor or customize interior layout for special purpose cars (food service, business class) without altering the cars’ operational and safety characteristics Customer variables provide for exterior graphics, paint and styling, decals, and interior décor options All ADA requirements are included in spec for interoperability

Safety Requirements Design meets all Federal safety regulations, industry standards and industry recommended practices Design is advancement in safety compared to current FRA Tier I 49 CFR Part 238 requirements for crashworthiness, incorporates Collision Energy Management (CEM) CEM requirements for protected operator cab space will provide design challenge for Contractor Design requires safety standards be incorporated for all major components and subcomponents Design specifies each Cab car control architecture provides for Positive Train Control (PTC ) implementation

Reliability and Maintainability Requirements The car reliability requirement is based on a mean distance between train delays (MDBTD) of at least 150,000 miles There are component reliability requirements of mean distance between failures (MDBF) for major subsystems of between 300,000 and 1,000,000 miles Maintainability shall be the primary criterion for the design of the under floor equipment, equipment rooms and access doors Design requires ease of access for inspection, maintenance and repairs Specification defines preventative maintenance requirements that mirror all Amtrak maintenance intervals and procedures, FRA safety requirements and OEM maintenance manuals

Passenger and Amenity Requirements Four sets of side passenger entry doors (two per side) at far ends of cars, except Cab/baggage may have only one side entry HVAC system to maintain the car’s interior temperature at specified values (68 F to 76 F) Four modes of interior lighting: normal, quiet car, standby, and emergency Interior and exterior lighting shall be provided by Light Emitting Diodes (LEDs) or a combination of LEDs and fluorescent lights Communication systems: Public Address (PA), Intercommunications (IC) system, Onboard Train Information System (OTIS), and Passenger Information System (PIS), includes wireless capacity Pressurized fresh water system 112 gal, Café car 224 gal, capacity potable water for drinking, hand washing, toilet flushing, and Café galley requirements Waste system shall be vacuum system with minimum capacity for 225 gal of passenger waste Interior space provides balance between need for revenue seats and for other uses such as luggage racks, bicycle storage

Communications and Electrical Conrols Single-level cars to be functionally compatible with the existing Single-level fleet of Amfleet I and II, Horizon and Viewliner fleets Electrical power distribution and control system for each car and car to car power and signal trainline circuits from HEP 480 VAC, three phase, 60 Hz Car to car communications for MU and COMM provided by 27 pin jumper cables and receptacles System architecture for control, operations, and communications utilizes up to date technologies, open architecture for expansion, and still interface with systems that may already be installed Cab/baggage car equipped with Positive Train Control (PTC) and be fully functional with PTC systems in use or planned for use by host railroads ROW in which Amtrak operates Passenger convenience outlets (120VAC) are distributed throughout the car in the wall panel at each seat pair and two outlets at each Café table for customer electronic equipment

Vehicle Standardizations Technical Subcommittee Working Group developed Report on Proposed Approach to Standardization of Specifications for new equipment and proposed recommendations to the Executive Board that maximize benefits: Standardization of the specification layout and language Standardization of key component interfaces-interchangeable with common performance requirements Standardization of the design of particular component or system resulting in interchangeable components/systems

Environmental Initiatives Specification identifies areas that promote sustainability in the manufacturing process to reduce manufacturing waste and energy consumption: Create reusable packaging for transport of materials Use of recycled materials for packaging Use of recycled materials in the production process Recycling of excess materials used in the manufacturing process Capture of office supplies, paper, cardboard, copier toner Develop or promote employee awareness campaigns Specification requires use of R-400 series refrigerants that lessen the impact on the depletion of the ozone layer

Regulatory Standards Contractor must comply with all Federal regulations including ADA, DOE, EPA, FRA, FTA, APTA, AAR Specification must meet all industry standards and recommended or best practices, some of which are: American National Standards Institute (ANSI) American Public Transportation Association (APTA) American Society of Mechanical Engineers (ASME) American Society of Testing and Materials (ASTAM) American Welding Society (AWS) Institute of Electrical and Electronics Engineers (IEEE) International Organization of Standards (ISO) National Fire Protection Association (NFPA) Burden is on Contractor to be aware of and comply with all Federal regulations and industry standards and practices

Testing and Acceptance Contractor is responsible for developing a Project Management Plan for prosecution of all work Contractor is responsible for submitting an Engineering Plan for accomplishing design functions - four major reviews: 1) Preliminary Design Review; 2) Intermediate Design Review; 3) Mock Up Review; and Final Design Review Contractor is responsible for CPM (Critical Path Method) Plan to schedule all activities related to a contract Specification requires four major categories of tests: Material certification tests Proof of design tests - validate design Production tests - functional, operational and workmanship Acceptance tests - demonstrate conformance with technical specification Contractor shall develop and implement a Quality Assurance (QA) program to ensure control of engineering changes, configuration management, production control and independent audits

Task 3 DOCUMENT THE METHODOLOGY BY WHICH THE SPECIFICATION WAS DEVELOPED, INCLUSIVE INDUSTRY INPUT, EVALUATION PROCESS The Executive Board created a Technical Subcommittee to develop the specification March 2010 - Technical Subcommittee issued industry-wide letter of invitation to participate in Specification development process Amtrak, FRA, the States, and over 100 industry professionals including carbuilders, suppliers and consultants participated in the Specification development Technical Subcommittee formed subgroups to develop major sections of the Specification: Mechanical Electrical Vehicle/track Interface Structural Interiors

Task 3 (Cont’d) Subgroups provide technical input, data and recommended written changes to Amtrak baseline spec December 15, 2010 - Technical Subcommittee met to receive final inputs; voted to approve the Single-level Specification and forward to the Review Panel and Executive Board for approval The Review Panel retained Larry Salci to assist in its assessment of the Specification and provide a report with recommendations