Optimal Electricity Supply Bidding by Markov Decision Process

Slides:



Advertisements
Similar presentations
Chapter 7 Production, Firms and the Market. Profit & the Firm The Bottom Line Incentive and reward for risks Leads to better decision making and greater.
Advertisements

Determining the correct price
Dr. A. K. Dey1 Inventory Management, Supply Contracts and Risk Pooling Dr. A. K. Dey.
Pablo Serra Universidad de Chile Forward Contracts, Auctions and Efficiency in Electricity Markets.
 Copyright 1999 Prentice Hall 10-1 Chapter 10 Pricing Products: Pricing Considerations and Approaches PRINCIPLES OF MARKETING Eighth Edition Philip Kotler.
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Chapter 8 Aggregate Planning in a Supply Chain
Principles of Marketing
Chapter Twenty-Seven Oligopoly. u A monopoly is an industry consisting a single firm. u A duopoly is an industry consisting of two firms. u An oligopoly.
Supply Chain Management
Chapter 8 Managing in Competitive, Monopolistic, and Monopolistically Competitive Markets Copyright © 2014 McGraw-Hill Education. All rights reserved.
Scheduling of Wireless Metering for Power Market Pricing in Smart Grid Husheng Li, Lifeng Lai, and Robert Caiming Qiu. "Scheduling of Wireless Metering.
Department of Telecommunications MASTER THESIS Nr. 608 MASTER THESIS Nr. 608 INTELLIGENT TRADING AGENT FOR POWER TRADING THROUGH WHOLESALE MARKET Ivo Buljević.
Electricity Industry Deregulation in Taiwan I. Summary of the Framework of Electricity Industry Liberalization in Taiwan.
Prof. H.-J. Lüthi WS Budapest , 1 Hedging strategy and operational flexibility in the electricity market Characteristics of the electricity.
Market Structure Dr.Deepakshi Gupta
CHAPTER 8 Managing in Competitive, Monopolistic, and Monopolistically Competitive Markets McGraw-Hill/Irwin Copyright © 2014 by The McGraw-Hill Companies,
Chapter 11 Pricing with Market Power. Chapter 11Slide 2 Topics to be Discussed Capturing Consumer Surplus Price Discrimination Intertemporal Price Discrimination.
Peak Shaving and Price Saving Algorithms for self-generation David Craigie _______________________________________________________ Supervised by: Prof.
Tutorial 1 Introduction to Economics 1. LEARNING OUTCOMES The term “economy” 2. Difference between microeconomics and macroeconomics; 3.The three basic.
Vertical Scope of the Firm What are the appropriate vertical boundaries of the firm?
Leader-Follower Framework For Control of Energy Services Ali Keyhani Professor of Electrical and Computer Engineering The Ohio State University
Inventory Management and Risk Pooling (1)
New Opportunities for Control and Optimization in the Future Power Industry Environment Chen-Ching Liu University of Washington.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Competitors and Competition
Pricing Strategy.  Focus on the value of your product / service delivers  Value = perceived benefits Price Know your competitor Reward staff for sales.
Develop a Marketing Plan.  Your marketing plan gives you a guide on which to base decisions and ensures that everyone is working together to achieve.
PRICING DECISIONS “There are two fools in every market. One charges a very high price and another charges a very low price”
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Markets with Only a Few Sellers
Idil Yaveroglu Lecture Notes
Operation of power systems with high shares of wind power
Tools for Decision Analysis: Analysis of Risky Decisions
Narragansett Electric Rate Classes
FORECASTING.
Professional Excellence : The IT way
Section 1.4 – Day 2 Market Equilibrium.
Pricing Considerations
Optimal Electricity Supply Bidding by Markov Decision Process
Part Two: Microeconomics of Product Markets
Björn Felten, Tim Felling, Christoph Weber
Chapter 8 Aggregate Planning in the Supply Chain
Pricing: Understanding and Capturing Customer Value
Optimisation of Supply Demand Balance Model under Uncertainty
Chapter 8 Aggregate Planning in the Supply Chain
Optimal Electricity Supply Bidding by Markov Decision Process
بازار برق: مباني، انواع و نهادها مقدمه بازار برق: تاريخچه، زمينه‌ها و كاستي‌ها تاريخچه زمينه‌‌هاي مقررات‌زدايي كاستي‌ها انواع بازارهاي برق رقابت‌پذيري.
Pricing Products: Pricing Considerations and Approaches
Market Failures Structure & External Forces
Chapter 8 Aggregate Planning in the Supply Chain
Pricing Methods Cost-based pricing
2016 International Conference on Grey Systems and Uncertainty Analysis
Supply Chain Management (3rd Edition)
Introduction to Market Structures
Long-Run Outcomes in Perfect Competition
Strategic Bidding in Competitive Electricity Markets
Strategic Inventory Positioning in Capital Project Supply Chains
Arslan Ahmad Bashir Student No
Pricing: Understanding and Capturing Customer Value
Competitive Industry Report and Calculations
GENCO Investment Strategies by Simulation
Pricing: Understanding and Capturing Customer Value
GENCO Investment Strategies by Simulation
Solar Energy Commercialization
Micro Economics Scope Nature and Scope
PRICING DECISIONS “There are two fools in every market. One charges a very high price and another charges a very low price”
Pricing: Understanding and Capturing Customer Value
Energy Supply Business Model enabled by the Clean Energy Package
Deregulated Power, Pollution, and Game Theory
Presentation transcript:

Optimal Electricity Supply Bidding by Markov Decision Process Authors: Haili Song, Chen-Ching Liu, Jacques Lawarree, & Robert Dahlgren Presentation Review By: Feng Gao, Esteban Gil, & Kory Hedman IE 513 Analysis of Stochastic Systems Professor Sarah Ryan February 14, 2005

Outline Introduction Purpose Problem Formulation Model Overview Summary

Introduction Electric Industry has Transitioned from Regulated to Deregulated Regulated: Vertically Integrated, Monopolistic Market Deregulated: Ideally, Perfect Competition Market Decision Analysis: Based on Profit & Competition

Introduction Cont’d Traditional Power System Generation, Transmission, Distribution, Consumption

Introduction Cont’d Structure of Power Market Optimize Resources With Competition

Introduction Cont’d Day Ahead Market Considered Inelastic Demand Generation Companies (GenCos) are Risk-Neutral GenCos Bid a Price (P) & Quantity (Q) Bids are Chosen from Cheapest to Most Expensive Market Clearing Price: P from the Highest Chosen Q (Similar to the New Zealand & Great Britain Electricity Markets)

Purpose Overall Objective: Maximize Expected Profit over a Planning Horizon of 7 Days For all States, Determine Optimal Bidding Strategy. Depends on: Competitors’ Bidding Load Forecasting Remaining Time Horizon (given day i, 7 – i) Production Limit (Max Available Supply Remaining over Planning Horizon) Accumulated Data over Time (Past Load & Price Data)

Problem Formulation States are Defined by 7 Variables: Peak Load & Peak Price (2) Off-Peak Load & Off-Peak Price (2) Current Production Limit for the Remaining Planning Horizon (1) Load Forecast for the Following Day (2) Aggregation Limits Number of States P & D Broken into High, Medium, & Low Illogical States Ignored: (High P & Low Q, etc.)

Problem Formulation Cont’d Transition Probability Depends on: Current State i, Subsequent State j, Decision a Pr (i, j, a) Decision Maker Receives Reward R (i, j, a) State of the Market Defines the Competitors’ Bids & Decision Maker’s Bidding Options Bid Prices are Determined Using a Staircase Supply Fn for Varying MW

Problem Formulation Cont’d MDP Algorithm Considers: Rewards Based on Load Forecast Decisions of a State Competitors’ Bidding Characteristics Decision Options Affect Transition Probabilities & Rewards Competitors’ Bids are Independent Scenarios (s) are exclusive

Model Overview Probability of Scenario s: Pr (i, n, k): Probability that Supplier n (n ~= m) Chooses Option k in State i m is decision maker Competitors’ Bids are Independent Remaining Production Limit: q (i, s, t) is the Q used in period t for scenario s. Spot Price for Scenario s: SP(i, s, t)

Model Overview Cont’d Probability to Move from State i to j: Pr (i, LF (j, t) = Probability that Load Forecast for Day After Tomorrow is LF (j, t) Given Present State i Reward for Decision Maker, r (i, s):

Model Overview Cont’d Reward for Transition from i to j & Decision A is Sum of Rewards Weighted by Conditional Probabilities: V (i, T+1): Total Expected Reward in T+1 Remaining Stages from State i Solved by Value Iteration

Summary Introduction Purpose Problem Formulation Model Overview Electric Market is now Competitive GenCos Bid on Demand Purpose MDP Used to Determine Optimal Bidding Strategy Problem Formulation Transition Probability Determined by Current State, Subsequent State, & Decision Made 7 Variables to Define a State Aggregation Used to Limit Dimensionality Problems Model Overview 7 Day Planning Horizon Objective is to Maximize Summation of Expected Reward Value Iteration

Questions???

References Song, H.; Liu, C.-C.; Lawarree, J.; Dahlgren, R.W, “Optimal Electricity Supply Bidding by Markov Decision Process,” IEEE Transactions. Power Systems, Vol. 15, no. 2, pp 618-624, May 2000. http://www.acclaimimages.com/_gallery/_pages/0037-0409-0607-4216.html