Panel II: Adequate capacity for absorbing financial assistance

Slides:



Advertisements
Similar presentations
Financing of OAS Activities Sources of cooperation Cooperation modalities Cooperation actors Specific Funds management models and resources mobilization.
Advertisements

Seminar on European Territorial Co-operation – Brussels - 21 February 2005 Cross border co- operation at the EU external borders Seminar on Territorial.
Linking EU objectives and country sector strategies in programming assistance. Coordination of donors and evaluation of the IPA instrument Presented by.
Central Office for Development Strategy and Coordination of EU Funds ABSORPTION CAPACITY FOR IPA COMPONENTS III AND IV IN CROATIA 19 October 2009 Zvonimir.
PRIME MINISTRY SECRETARIAT GENERAL FOR EU AFFAIRS ABSORBING EU FINANCIAL ASSISTANCE THE CASE OF TURKEY Ahmet YÜCEL Deputy Secretary General October 19,
Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA Components III, IV and V: Conditions for successful preparation and absorption of.
Government of the Republic of Macedonia Secretariat for European Affairs Conference "Effective Support for Enlargement", Brussels Effective.
Planning and Timely Implementation of Structural Funds Interventions Katarína Mathernová Director, DG Regional Policy European Commission 24 November 2005.
EU-Regional Policy and Cohesion Structural Funds and Accession 1 ANNUAL MEETING OF ISPA PARTNERS 2003 FROM ISPA TO COHESION AND STRUCTURAL FUNDS BRUSSELS,
Western Balkans and Europe 2020 Western Balkans and Europe 2020 Towards Convergence and Growth – Draft Conclusions Brussels, March 2011.
Radmila Trkulja, Head of the CHU of Republika Srpska.
Regional Conference “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th October 2007 Working Group II Instrument of Pre Accession and Cross Border.
Commonwealth Local Government Forum Freeport, Bahamas, May 13, 2009 Tim Kehoe Local Government and Aid Effectiveness.
Government of the Republic of Macedonia Secretariat for European Affairs TWINNING EXPERIENCE IN MACEDONIA Orhideja Kaljoshevska. MA NCP Twinning “1 st.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
MAKING USE OF IPA IN CROATIA – OPERATIONAL PROGRAMMES UNDER COMPONENTS III AND IV 13 November 2007.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
The Instrument for Pre-Accession Assistance
Title Consultation on the 7 th replenishment of IFAD’s resources IFAD’s operating model : overall structure and components Consultation on the 7th replenishment.
(Dr. Peter Heil, ALTUS – Hungary)
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
Croatian Experience with Management of EU Funds Nataša Mikuš, Deputy State Secretary Central Office for Development Strategy and Coordination of EU Funds.
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
The Instrument for Pre-Accession Assistance IPA General overview DG Enlargement Financial Instruments and Regional Programmes Directorate.
Regional policy European Commission EN Update on IPA Component III - environment Brussels, 28 November 2008 Erich Unterwurzacher REGIO.I4 – IPA/ISPA.
1 The Instrument for Pre-accession Assistance (IPA) Framework and implementation European Commission DG Enlargement Christine Meisinger EastAgri 2008.
MOBILISATION OF RESOURCES TO IMPLEMENT THE DANUBE STRATEGY Ruse/Giurgiu, May 2010 T. Sobieski European Commission-Head of Unit C2, DG ELARG.
EU Enlargement Donor Coordination Forum meeting, 16 April 2013 IPA Implementation and outline of IPA II Holger Schroeder Head of Operations EU Delegation.
Jovan TEGOVSKI Chief of Staff 10 October 2011, Skopje 2 nd Meeting of the European Forum for Disaster Risk Reduction (EFDRR) The role of the Regional Cooperation.
1 E u r o p e a n C o m m i s s i o nDirectorate General Environment EU Water Initiative The EU Water Inititative The EECCA component.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
DG Enlargement – Effective Support for Enlargement Conference, Brussels 19 October 2009 Concluding Remarks of the Co-chairs.
Strategy for ENP-South partner countries Management Group on Statistical Cooperation (MGSC) meeting, Luxembourg, 22 – 23 March 2012 Presentation by Edward.
EUROPEAN COMMISSION EUROPEAN UNION IPA 2010 National Programme Bosnia and Herzegovina EU Delegation to Bosnia and Herzegovina Donor Coordination Forum.
Belgrade, Donor Coordination Meeting Belgrade, 4 th of June 2012.
Grant Application Form (Annex A) Grant Application Form (Annex A) 2nd Call for Proposals.
The EU Water Initiative and the EU ACP Facility New Instruments to promote sustainable development of water resources and affordable access Antonio Garcia-Fragio.
New approach in EU Accession Negotiations: Rule of Law Brussels, May 2013 Sandra Pernar Government of the Republic of Croatia Office for Cooperation.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 32 – Financial control Bilateral screening:
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 19 – Social Policy and Employment.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Eighth Regional Public Procurement Forum May, 22-25, 2012 Tirana
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 11 – Agriculture and Rural Development.
W. Schiessl, AGRI E.II.4 Programme management and institutions involved in monitoring and evaluation.
Financial Implementation of the Assistance from the Structural Funds and the Cohesion Fund of the EU Sylvia Indjova Head of Certifying Authority Director.
Leader Axis Rural Development Policy by Jean-Michel Courades AGRI-F3.
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity in programming period
PRE-ACCESSION PROJECT IMPLEMENTATION IN CROATIA
Capacity Development Programme
PIFC development in Moldova
Making Technical Cooperation work for capacity building
NSRF and National Development Planning in Greece
7th Meeting of IPS Support Group Council of Ministers
The Instrument for Pre–accession Assistance
Establishment aid coordination and management mechanisms
Future multi-beneficiary IPA programmes
Instrument of Pre-Accession (IPA) IPA State of Play
Supporting Cities and Regions through Projects and Programmes
Governance Structure for 2008 SNA and Related EcoStat Implementation
IPA – European pre-accession funds
ESF IMPLEMENTATION IN MALTA
Instrument za pretpristupnu pomoć
EC approach towards financing infrastructure projects Dagmar KALJARIKOVÁ Policy Officer for Turkey, Montenegro, REC CEE and NGOs Unit for Enlargement.
Statistics in the Enlargement context
Expected Impact and Results
The role of the international department of TurkStat
Making Technical Cooperation work for capacity building
The Active Citizens Fund in Bulgaria Programme Priorities and Measures for Support Short version of the presentation delivered at the Official Launch.
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
IPA 2008 – support to environment Brussels, 28th November PEIP Regional Meeting Joanna Fiedler European Commission DG Environment.
Presentation transcript:

Panel II: Adequate capacity for absorbing financial assistance Effective Support for Enlargement Panel II: Adequate capacity for absorbing financial assistance -setting the decentralised management in the candidate countries- Conference "Effective Support for Enlargement", Brussels 19.10.2009

Absorption capacity (main elements) -Macedonian case- Macroeconomic absorption capacity (as % of GDP) Financial absorption capacity (ability to co-finance) Administrative absorption capacity (demand side-to generate projects, supply side-to manage the funds) Not a constraint in the pre-accession period The intention to increase the co-financing rate beyond the thresholds Supply and demand of mature and ready-to-go projects, to cope with reporting requirements, to supervise implementation, and to avoid irregularities, Structures, Human resources, Tools Conference "Effective Support for Enlargement", Brussels 19.10.2009

Conference "Effective Support for Enlargement", Brussels 19.10.2009 Overall status Programming Implementation Monitoring Evaluation Relevant experience accumulated Conferral of management ongoing Shadow phase introduced Country Interim evaluation Programme introduced Conference "Effective Support for Enlargement", Brussels 19.10.2009

Conference "Effective Support for Enlargement", Brussels 19.10.2009 Implementation Conference "Effective Support for Enlargement", Brussels 19.10.2009

Conference "Effective Support for Enlargement", Brussels 19.10.2009

Conference "Effective Support for Enlargement", Brussels 19.10.2009 Structures Operating structures established per component in line with WLA and act of Systematizations and rule book of working post adopted accordingly: IPA component 1 – 166 employees IPA component 2 – 28 employees IPA component 3 – 46 employees IPA component 4 – 40 employees IPA component 5 – 120 employees Conference "Effective Support for Enlargement", Brussels 19.10.2009

Conference "Effective Support for Enlargement", Brussels 19.10.2009 Capacity Building Conducted trainings thus far: monitoring and evaluation, procurement, grant schemes, financial management, risk management, irregularities, work load analysis, techniques of writing PFs and ToR, and soft skills for less than 2000 civil servants Training of Trainers Conference "Effective Support for Enlargement", Brussels 19.10.2009

Conference "Effective Support for Enlargement", Brussels 19.10.2009 Procedures Written procedures prepared: Programming manuals, NAO, CFCD and NF Internal procedure Manuals, SPO manual of procedures, Monitoring and evaluation manuals, Communication guide, Decrees, Project Implementation manual, etc ) Conference "Effective Support for Enlargement", Brussels 19.10.2009

Component III Regional Development -status and main challenges- 2 major projects prepared, implementation to follow 24 July 2009, FA entered into force on 18 September 2009, Ongoing First installment transferred, procurement process ongoing Regular consultation process is ensured Programming Conferral of Management OP revision Implementation Donors, IFIs and CSOs consultation Conference "Effective Support for Enlargement", Brussels 19.10.2009

Component IV Human Resources Development -status and main challenges- Programming Conferral of Management OP revision Implementation Donors, CSOs, social partners consultations Envisaged projects in three priority axes 16 October 2009 Commission Decision, FA signing in procedure Expected at the beginning of 2010 with launching of first calls for applications Regular consultation process established Conference "Effective Support for Enlargement", Brussels 19.10.2009 Conference "Effective Support for Enlargement", Brussels 19.10.2009

Component V Rural Development -status and main challenges- Unique structure Programming Conferral of Management IPARD campaign Implementation MA and IPARD established IPARD Programme approved Accreditation package submitted, CoM expected in November 2009 Launching - end of October 2009 Beginning of 2010 Conference "Effective Support for Enlargement", Brussels 19.10.2009

Conference "Effective Support for Enlargement", Brussels 19.10.2009 Component I Transition Assistance and Institution Building – status and main challenges- Programming Conferral of Management Implementation Annual Programmes up to 2009, programming 2010 ongoing Expected first quarter 2010 Lessons learned applied Co-financing and ownership increased CPs, CAs and MBs coordination mechanism established ToRs prepared during programming process Revision of threshold of MIPD per priority axes Conference "Effective Support for Enlargement", Brussels 19.10.2009

COMPONENT II Cross Border Cooperation – status and main challenges- Programming Implementation Co-financing Partnerships Info campaign 4 CBC OPs approved, CBC OP with northern border to be initiated Centralized management ongoing, DIS structure to be established Fiscal Decentralisation versus Co-financing arrangements Promotion of sustainable partnerships Info days and partner matching events organised Conference "Effective Support for Enlargement", Brussels 19.10.2009

Monitoring and Evaluation Schemes Procedures established Transitional phase ongoing, Operating structures to take over the responsibility to perform monitoring activities Clear segregation of responsibilities between NIPAC office and CFCD Capacity building for Interim evaluation Monitoring Evaluation Conference "Effective Support for Enlargement", Brussels 19.10.2009

Wider environmental framework PIFC Public Procurement Internal Budgetary procedures Internal audit units established in 49 public sector entities on central level and 39 on local level. (121 internal auditors employed) Strategy for development of the system for public procurement, aimed for strengthening of capacity and system of public procurement is ongoing Co-financing obligation incorporated in the budgetary procedure. Further harmonization of relevant acquis Conference "Effective Support for Enlargement", Brussels 19.10.2009

IMMEDIATE CHALLENGES AHEAD – To finalise the conferral of management processes in the 1 quarter of 2010; Retention policy of civil servants; Capacity Building and increase of number of employees as per WLA; Increase capacities of the potential beneficiaries outside administration; OPs revisions Increase of number of participation in the CPs and CAs Conference "Effective Support for Enlargement", Brussels 19.10.2009

Mid-term and long term steps Maintaining of the conferral of management powers Minimize the staff turnover Institution building of new IA’s Absorption capacity (building) for Structural and Cohesion Funds… from 2014? or earlier? Conference "Effective Support for Enlargement", Brussels 19.10.2009