Working Group 2C Organisational set-up

Slides:



Advertisements
Similar presentations
1 Update on progress in SOE-drafting group. 2 Water Directors Steering of implementation process Chair: Presidency, Co-chair: Commission Strategic Co-ordination.
Advertisements

European Commission - DG Environment Unit D.2: Water & Marine 1 Pau-Plenary Session 14 may 2008 Pau-Plenary Session 14 may 2008 CMA developments and state.
FAIRMODE Forum for Air Quality Modelling in Europe Re-organisation & future work programme 18th EIONET Air Quality Meeting, Dublin, October 2013.
How did we get to this point Reviewed the BDA (2008) Curriculum Framework Hosted a number of consultation events in 2010 with placement providers Developed.
European Commission - DG Environment Unit D.2: Water & Marine 1 Need for continuous exchanges on chemical monitoring issues, in the light of the on-going.
4th Assessment of Progress Against the GEOSS 2015 Strategic Targets
Draft Mandate Johannes Grath Balázs Horvath (DG Env)
CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
Pilot River Basin Network: Environment Directorate
Marine Strategy Framework Directive (MSFD)
STRATEGIC CO-ORDINATION GROUP Water scarcity Expert group
Project Objectives, Workplan and Timescales
WG 2.B Integrated River Basin Management
JRC’s Follow-up work to improve GES assessment
Philippe Quevauviller, Johannes Grath
Chemical Monitoring mandate
Proposed CIS Workshop on WFD Economic Issues
CIS-Workshop on River Basin Management Plans
Informal meeting of EU Water Directors
Chemical Monitoring Activity (CMA)
on Priority Substances Strategic Coordination Group
JRC-Institute for Environment and Sustainability
European Commission DG ENV Unit C1 Water
Water Directors’ Meeting Common Implementation Strategy
Progress report ATG Hymo 1 May – 20 October 2016
19th meeting of the WG GES 22/03/2018
Groundwater monitoring within the WFD
CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
Meeting of Water Directors WFD Common Implementation Strategy
MSFD Com Dec 2010/ 477/ EU review Recommendations for D2
Marine Strategy Framework Directive (MSFD)
Johannes Grath, Balazs Horvath
Working Group C & Links Planning 1st semester 2007
Chemical Monitoring Activity (CMA) ( )
Working Group C Ariane BLUM, Hélène LEGRAND (France)
WG C Groundwater Progress Report to SCG SCG-Meeting, 07/
Meeting of Water Directors Future Work Programme of the CIS
The Common Implementation Strategy – an overview
Water Framework Directive 2000/60/EC
Objectives General objectives Exchanges of knowledge and information on groundwater issues and preparation of specific guidelines in support of the implementation.
WG C Groundwater Mandate and activities
WFD and Agriculture Activity under the CIS 2005/2006 Work Programme
Work Programme of the CIS
Plenary Session 21° October Paris
MAIN COMMENTS ON THE DRAFT MANDATE
CIS work programme Supporting the implementation of the first river basin management plans Water Directors' Meeting 30 November and 1 December.
WG E on Priority Substances
WFD conference Lille 2007: “Water Status Monitoring under the WFD”
Common Implementation Strategy for the Water Framework Directive
Working Group C ( ) Groundwater in the CIS
Assessment of 1st FRMPs and 2nd RBMPs
Organisation Water Directors Strategic Co-ordination Group
Sylvia Barova Unit B.3 – Nature DG Environment, European Commission
Water Science-Policy Interface (CIS-SPI) Progress report
WG C-1 activity Berlin – 3 May 2007
Philippe Quevauviller
Sub-Group on Review of Priority Substances – state of play
WGC-2 Status Compliance and Trends
Marine Strategy Framework Directive reporting: progress and next steps
Strategic Co-ordination Group May 2009
Activity on Eutrophication
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
Common Implementation Strategy for the
Working Group C & CMA ( ) Tasks / Deliverables
EU Water Framework Directive
Brussels – 20 April 2007 European Commission - DG Environment
European Marine Monitoring and Assessment
EU Water Framework Directive
Strategic Coordination Group Brussels, 5-6 November 2008
31st WG GW Meeting summary and deadlines 25/26 Oct 2016, Bratislava
Presentation transcript:

Working Group 2C Organisational set-up STRATEGIC CO-ORDINATION GROUP STEERING GROUP DG ENV (Chair), Austria (co-Chair), JRC PLENARY FORUM 13.10.2003 28.01.2004 25.06.2004 18.10.2004 Forum on Characterisation Forum on Risk assessment Forum on Monitoring Forum on Status and trends 2005 Drafting Group Status / Trends Drafting Group Thresholds Drafting Group Ind. discharges Forum on research and standardisation

WG 2C workshop on “status and trends” – 18 October 2004 Invitation to provide elements for discussion in support of the BRIDGE project: common methodology for establishing threshold values (deadline: 15th September) – Discussion to be planned at the workshop MS invited to present experiences on status and trend evaluation (e.g. linked to investigations/permit procedures) Discussions on expected drawbacks linked to WFD provisions

Work programme 2005 Linking “drafting groups” to Plenary Forum discussions – 1 day ½ meetings (first ½ day: meetings of drafting groups (parallel sessions?) – followed by one day of forum meeting) Drafting groups (max. 10-15 participants) to be formed before the end of 2004 – Volunteers for the three defined topics should indicate their interest – Drafting group mandates to be finalised by the end of 2004 Regular briefings on the progress of the BRIDGE progress (to the Plenary Forum) Discussions of research and standardisation needs if appropriate

Provisional workplan Status & Trends: built up on outcome of the workshop of 18th October – Drafting group on 26.01.2005 afternoon, Plenary Forum on 27.01.2005 Thresholds: directly linked to BRIDGE – Drafting group on 22.06.2005 afternoon, Plenary Forum on 23.06.2005 Indirect discharges: information to be gathered from 80/68/EEC Directive implementation – Drafting group on 19.10.2005, Plenary Forum on 20.10.2005

Finally… Please provide Summary report on presentations held at Risk Assessment Workshop – January 2004 Summary report on presentations held at this Monitoring Workshop Send to Philippe (Philippe.Quevauviller@cec.eu.int) and/or Andi Scheidleder (Andreas.Scheidleder@umweltbundesamt.at)