API 17H ROV/ROT Interfaces

Slides:



Advertisements
Similar presentations
4/25/20151 The Code-Making Process National Electrical Contractors Association.
Advertisements

SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
API Subcommittee 17 Industry Standards for Subsea Equipment
Kent Grebing, API SC 16 Chair
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
SC18:TG8 API Specification Q1 Guidance Document.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Status: Draft Status report for revision of ISO (API 17F) Winter meeting Houston January 2010.
Doc.: IEEE /430r0 Submission José A. Gutierrez November 02 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Status: Draft Status report for revision of ISO (API 17F) Summer meeting Washington June 2010.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API SUBCOMMITTEE 17 SUMMER MEETING 13 January /13/2016 Subsea Industry Standardization Landscape Terry Cook – API SC17 Vice-Chair.
TG Chair: Darren Bane (BHI)
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
Maintenance Task Group Closing Report
Task Group 19LH Liner Hanger Equipment
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
API 17Q Proposed Technical Changes to Rev 0
API Subcommittee 17 - Specification 17D January 2016 Status
Jan Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, January 2003 Date Submitted:
API RP 17A - Discussion Points
doc.: IEEE <doc#>
API 17Q – Subsea Equipment Qualification
Task Group Status January 2014
API 17V – Subsea Safety API 17V January 2014 By Christopher Curran
API SC6 Valves and Wellhead Equipment
doc.: IEEE <doc#>
First 8 slides are what was presented in San Fransisco…
RAISING PERFORMANCE. TOGETHERTM
doc.: IEEE <doc#>
API SC-16 task group for Specification 16D
doc.: IEEE <doc#>
API SC 10, Work Group 3 Update:
WG Technical Editor’s Report
doc.: IEEE <doc#>
doc.: IEEE <doc#>
API 17P TASK GROUP January, 2015.
API 17H TASK GROUP January 15, 2013.
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
doc.: IEEE <doc#>
API Summer Standardization Conference
API 17H TASK GROUP January , 2014.
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17H ROV/ROT Interfaces
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
API 17H ROV/ROT Interfaces
Discussion Points API RP 17A Task Group Members
WG Technical Editor’s Report
API 17H TASK GROUP January, 2015.
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
The Code-Making Process
Task Group Status January 2013
Status report for revision of API 17F
API 17H TASK GROUP June 26, 2013.
API 17P TASK GROUP 13 June, 2012.
API 16C Choke and Kill Equipment
API 17P TASK GROUP June 26, 2013.
Presentation transcript:

API 17H ROV/ROT Interfaces January, 2016

BACKGROUND API 17H 2nd edition was published in June 2013 API 17M was withdrawn and replace with API 17H Errata to correct hot stab drawings issued January 2014 SRRR has been submitted and accepted for the third revision

API 17H TEAM MEMBERS Name Company E-mail Charles White BG Norge Charles.white@bg-group.com Andy Lee FMC Andy.lee@fmcti.com Brian Skeels Brian.skeels@fmcti.com Karl Schnakenburg BHP Karl.Schnakenburg@BHPBilliton.com Didier Renard Technip drenard@technip.com Erich Luzi Statoil Luzi@statoil.com Steve Liso Chevron sliso@chevron.com Eirik Kloster Jacobsen Blue Logic ekj@bluelogic.no Aiyueh.Kwan BP Aiyueh.Kwan@bp.com

CURRENT STATUS Inquiries related to second edition hotstab drawings recieved Released Errata to correct Figure 20 January 2014 Held several meeting to review inquiries related to hotstab drawings 17TR15 currently out for ballot

CURRENT STATUS Historically the hotstab drawings have been donated to API use the drawings as provided without making any design changes to the design drawings do not use a common approach for stab/receptacle alignment seal squeeze/location panel clearance requirements datum for dimensioning misinterpretation of the drawings and a number of inquiries to the taskgroup   

CURRENT STATUS Task group is recommended to publish a technical report related to the hotstab drawings Normalize the drawings Clarify the intent of the drawings as interface drawings Adopt new straegy to control the recepticle dimentions Allow more freedom for manufactures to innovate male hot stab designs while maintaining subsea interchangeabiltiy   

CURRENT STATUS SRRR issued to develop hotstab technial report Technical report to be issued for comment ballot (December 2015) Contents of technical report will be incorporated into 3rd edition API 17H

CURRENT STATUS Focus areas for the next edition are: Incorporate comments from hotstab technical report Clarification of quality requirements Consider outstanding comments left from the previous edition Add references to recently released recommended practice Incorporate Deepstar AUV Document into API17H

NEXT STEPS Resove any comments to 17TR15 Issue hotstab technical report Continue work on third edition API 17H

MILESTONES