MERIT – status and schedule

Slides:



Advertisements
Similar presentations
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Advertisements

AB/ATB-EA ML, le 30/03/071 MERIT INSTALLATION. AB/ATB-EA ML, le 30/03/072 MERIT INSTALLATION Total supported weight Solenoid: 5500 kg (12000 lbs) Hg System.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Pre-installation Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Pre-installation.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
VRVS session, 8th March 2006CERN AB-ATB-EA1 Layout of Passages between TT2 and TT2A Adrian Fabich, CERN AB-ATB-EA VRVS session, 8.
March 2005 A.Fabich, CERN AB-ATB Introduction nToF11 collaboration meeting March 2005 A.Fabich CERN AB-ATB.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos – CERN, AB Dept. Thanks to: A.Fabich, H.Haseroth,
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
The MERIT High-Power Target Experiment H. Kirk (BNL) CERN November 1, 2007.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
Videoconference, 3rd May 2005A.Fabich, CERN1 Nitrogen release from the TT2A cryogenic solenoid systems A.Fabich CERN AB-ATB, Switzerland Videoconference,
MERIT pre-installation review: Preliminary conclusions A.Fabich.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Construction and Installation of the CLIC Experimental Area
Preliminary Studies of the Electric Power Distribution for CLIC
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
TT2A Mercury Jet Experiment The Cryogenic System Roger Bennett and Yury Ivanyushenkov CCLRC, Rutherford Appleton laboratory, Chilto, Didcot, Oxon, OX11.
To TT10 Nitrogen or helium gas LN2 Storage vessel buffer storage vessel G1G2 Magnet cryostat VALVE BOX Schematic diagram of the cryogenic system.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
Target On axis field [scale /20 T] Target Magnets Decay-Channel Triplets Taper magnets.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
MERcury Intense Experiment Experiment Layout
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
Status of the PANDA Magnet
Cryogenic Risk Assessment in LHC
The Proposed TT2A Target Experiment
Status of the PANDA Solenoid Magnet Production in BINP
Status on the PS/SPS  MERIT (nTOF11) interface
The Proposed TT2A Target Experiment
MERIT pre-installation review: Preliminary conclusions
LS1 status 24/03/2014.
MERIT beam request A.Fabich CERN AB-ATB
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
US-LARP Task: IR Commissioning
Nitrogen release from the TT2A cryogenic solenoid systems
Schematic diagram of the cryogenic system
Layout of passages between TT2 and TT2A
Hall C Dump Status Beam Resuscitation Review
US-LARP Task: IR Commissioning
ABP/RTL Main RTL Activities for 2007/8:-
Discussion on MERIT Cryogenics Specifications
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

MERIT – status and schedule A.Fabich CERN AB-ATB http://cern.ch/merit June 2007 MERIT status, June 2007 A.Fabich

Status Mercury loop Solenoid & Cryostat Tested at building 183; positive Installed and operated in TT2A Remotely controlled Solenoid & Cryostat Insulation improved; magnet leads repacked Performance at building 180 satisfactory MERIT status, June 2007 A.Fabich

Safety reviews Solenoid&cryogenics: Mercury loop & transport https://edms.cern.ch/document/710659 Response: https://edms.cern.ch/document/849566 Mercury loop & transport https://edms.cern.ch/document/754444 Response: https://edms.cern.ch/document/849574 Pre-installation: https://edms.cern.ch/document/843377 Response: https://edms.cern.ch/document/847354 MERIT status, June 2007 A.Fabich

Open issues No show-stoppers found. Collection and drainage of condensation on cryostat surface. Catch basin connected to the tunnel drain – to be designed and installed Closing concrete shielding next to door D201 Limited time left for access to TT2 – needed for installation Closing shaft during beam operation possible? MERIT status, June 2007 A.Fabich

Schedule Access granted to TT2A on 11th, 14th and 18th June 2007 “sufficient” to complete installation without cryogenic lines Installed by 18th June: safety systems, beam line, beam instrumentation, mercury loop, solenoid, diagnostics Resources to install cryogenics limited AT/ECR committed to ATLAS installation during June-August Installation of remaining cryogenics during autumn or shut-down. In agreement with physics coordinator and AB/OP Intermediate state of MERIT installation to allow beam commissioning with mercury loop and diagnostics sytems still in year 2007 Final MERIT physics in 2008 MERIT status, June 2007 A.Fabich