Fenton Khan, Gary Johnson, and Mark Weiland

Slides:



Advertisements
Similar presentations
Eat the seasons.
Advertisements

Which season do you like best? 1106 Grade 8 Unit 9.
LOWER YUBA RIVER ACCORD Monitoring and Evaluation Program Redd Surveys Casey Campos PSMFC.
January 6. January 7 January 8 January 9 January 10.
Key Ideas Describe two lines of evidence for Earth’s rotation.
Satellite and Tower Data Reveal Unique Climate Over the Southern Sierra Nevada Eric Waller Department of Environmental Science, Policy, and Management.
X. X September Mo Tu We Th Fr Sa Su
The Months and The Seasons Prepared by Claudia Doria and Terra Myers.
Planning a Mentoring Program A CALENDER FOR A FIRST-YEAR TEACHERS’ PROGRAM.
Activity 27 Investigating Boomtown’s Weather
1 Mainstem Passage Strategies In The Columbia River System: Transportation, Spill and Flow Augmentation Presented By: Albert Giorgi, Ph.D.
Design and Performance of the River Mill Surface Collector
 January is a winter month. It is the first month of the new year. It is after December and before February. What is the weather like in January?
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
BUILDING STRONG ® PORTLAND DISTRICT 1. BUILDING STRONG ® PORTLAND DISTRICT 2 BiOp Performance Standards for Dam Passage Survival RPA RM&E Actions - Strategy.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
Genesis Pipeline Spill Collins, Mississippi Genesis Pipeline Co. USA Application of RamSorb/Oil Gator. Spill detected Dec 20, First RamSorb/Oil Gator.
Annual SARs by Study Category, TIR and D: Patterns and Significance Presenter: Charlie Petrosky CSS Annual Meeting Apr 2 nd 2010.
LGR Adult Ladder Temperature Permanent Fix NOAA Biological Goals: 1) Allow fish the opportunity to exit the ladder without stalling or excessive up/down.
WEATHER BY: JENNIFER FAUTH KINDERGARTEN.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
Northwest Geographic Area Coordination Center Predictive Services Winter of Climate and Significant Fire Potential Outlook Monday December 7.
2005 Subyearling Migration Fish Passage Center. Overview – summer migration Court ordered summer spill occurred from June 20 to August 31, 2005 Question.
Sources of Skill and Error in Long Range Columbia River Streamflow Forecasts: A Comparison of the Role of Hydrologic State Variables and Winter Climate.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
US Army Corps of Engineers BUILDING STRONG ® Mid-Columbia River Projects and Large Spill Events Ken Duncan Portland District PM Environmental Compliance.
Wanapum Dam Total Dissolved Gas Characterization Evaluation of the Wanapum Dam Fish Bypass (WFB) 2008.
The Impact of School Opening on Hospital Admissions for Asthma in New York State Shao Lin, PhD; Xiu Liu, MS; Rena Jones, MS; and Syni-An Hwang, PhD Bureau.
Ms. Comstock Ms. Conigliaro
Activity 27 Investigating Boomtown’s Weather
Deadline for Requisitions Payment Processing Date
Labour Day (May 1st) Spring (March-May) Women’s Day (March 8th)
Northwest Fisheries Science Center Technical Management Team
Weather Data Summary.
Building a Fishway for Sturgeon
Evaluation of Adult Salmonid Downstream Passage Through the Sluiceway and Turbines at The Dalles Dam During Late Fall, Winter, and Early Spring STUDY.
Evaluation of Adult Steelhead Downstream Passage Through the Sluiceway and Turbines at The Dalles Dam During Fall 2009, Winter 2009/2010, and Spring.
Age at ocean entry of Snake River Basin fall Chinook and its significance to adult returns prior to summer spill at LGR, LGS, and LMN dams.
Lower Granite and Little Goose
Comparative Survival Study Project #
Northwest Fisheries Science Center Technical Management Team
A Novel Approach for Identifying Dust Storms with Hourly Surface Air Monitors in the Western United States Barry Baker1,2 and Daniel Tong1,2 1National.
Upper Deschutes River Basin Steelhead Reintroduction
Telling the story in a graph
Activity 27 Investigating Boomtown’s Weather
Year 2 Autumn Term Week 12 Lesson 1
Study Update Tailrace Slough Use by Anadromous Salmonids
SMEAL MENTORING PROGRAM EVENT CALENDAR
2018/2019 School Calendar July August September October November
Evaluation of Steelhead Kelt Passage through the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008.
Aim: How do we measure time?
2017 Flow, Debris, spill and TDG
Mark Fermanich, CU-Denver January 3, 2011
Adult PIT-tag Interrogation System Wells Hydroelectric Project (System Design, Installation and Evaluation)     Shane Bickford* Public Utility District.
Year 2 Autumn Term Week 12 Lesson 1
Behavior Modification Report with Peak Reduction Component
Calendar.
Behavior and Survival for Juvenile Salmonids Passing Ice Harbor Dam during reduced and BiOp spill treatments, Gordon Axel, Eric Hockersmith, and.
PLAYMATES LEARNING CENTER CALENDAR
Habitat Changes and Fish Migration
Unit 3 My school calendar
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Specials Calendar Time Day 1 Day 2 Day 3 Day 4 Day 5 Day 6
Four Seasons! By izabelle.
Presentation transcript:

Fenton Khan, Gary Johnson, and Mark Weiland Hydroacoustic Evaluation of Adult Steelhead Fallback and Kelt Passage at The Dalles Dam in 2008/2009 and 2009/2010 Fenton Khan, Gary Johnson, and Mark Weiland Pacific Northwest National Laboratory 1

Methods Fixed location hydroacoustics technology. Transducers at each of the 22 powerhouse main turbine units. Transducers at each open sluice entrance: SL 1-2, 1-3, 18-1 and 18-2. Three study periods: Period 1: November 1 – December 15, 2009 for the fall/winter sluiceway and turbine study; Period 2: December 16, 2009 – March 7, 2010 for the turbine only study; Period 3: March 8 – April 10, 2010 for the spring sluiceway and turbine study. Note: Oil spill cleanup at sluice outfall delayed the start of the study to March 8 Data collected 24h/d for the entire study (Nov 1, 2009 – April 10, 2010). 2

Fall/Winter: Sluiceway and Turbines Results: Period 1 Fall/Winter: Sluiceway and Turbines (November 1 – December 15, 2009) 3

Passage Rates and Run Timing A total of 879 ±165 (95% confidence interval) adult steelhead-size targets passed through the turbines and operating sluice entrances. Daily average of 20 targets. 804 (92%) passed through the sluiceway and 75 passed through the PH. Run timing peaked in early December. 4

Horizontal Distribution Total passage was highest at SL 1. SL 18 had the second highest number of fish passing. A small number of fish passed through PH turbines 8, 16 and 18. 5

Horizontal Distribution – Sluice Entrances For individual sluice entrances, SL 1-3 passed the highest number of fish (469 targets), followed by SL 18-2 (293). Fewer than 50 targets passed through SL 1-2, and 18-1. 6

Diel Distribution Diel distribution of overwintering steelhead was highly variable and had no consistent pattern. 7

Winter: Turbines Only (December 16, 2009 – March 7, 2010) Results: Period 2 Winter: Turbines Only (December 16, 2009 – March 7, 2010) 8

Passage Rates and Run Timing A total of 62 ± 40 (95% CI) adult size steelhead targets passed through the powerhouse intakes during the 82-day study period. Fish were detected passing the turbines on January 14 and 31 and February 2, 22, and 24. 9

Horizontal Distribution Total fish passage was highest at Main Unit 18 (38 targets). Main Unit 5 passed the second highest number (16) and Main Unit 1 passed 8 fish. Main Unit 8, which typically passes fish in the fall and spring, was offline for most of this study period. 10

Diel Distribution Fish passage occurred during morning periods. Passage did not occur during the afternoon or nighttime. 11

Spring: Sluiceway and Turbines Results: Period 3 Spring: Sluiceway and Turbines (March 8 – April10, 2010) 12

Passage Rates and Run Timing 1,985 ±234 (95% CI) kelt size targets passed the sluiceway and PH intakes. Daily average of 58 targets. 1,958 (99%) passed through the sluiceway and 27 passed through the PH. Run timing peaked twice, once on March 20/21 and again in early April. 13

Horizontal Distribution Total fish passage was highest at Sluice 1 (1,153 targets). Sluice 18 passed the second highest number of fish passing (805) and a small number passed through powerhouse intake unit 8 (27). 14

Horizontal Distribution – Sluice Entrances For individual sluice entrances, SL 1-3 passed the highest number of fish (579 targets), followed by SL 1-2 (574). SL 18-1 passed 430 fish and SL 18-2 passed 375 fish. 15

Diel Distribution Diel distribution was highly variable and indicate steelhead targets were passing the dam at all times of the day. 16

Summary of Key Findings Period 1: Fallback of overwintering summer steelhead occurred throughout the 45-day study period. A total of 879 ± 165(95% CI) adult sized steelhead targets passed through the sluiceway and powerhouse turbine intakes. 92% of the total fish passed though the sluiceway. Run timing peaked in early December. Period 2: A total of 62 ± 40(95% CI) adult sized steelhead targets passed through the powerhouse turbine intakes during the 82 day period. All fish passed between mid January and February. Period 3: Downstream passage of early out-migrating kelt and overwintering summer steelhead occurred throughout the 34-day study period. A total of 1,985 ± 234 (95% CI) steelhead targets passed through the sluiceway and powerhouse intakes. 99% of the total fish passed through the sluiceway. Run timing peaked twice, once on March 20/21 and again in early April. 17

Summary of Key Findings For the two Sluiceway and Turbine study periods, horizontal distribution data indicated Sluice 1 is the preferred route for adult steelhead falling back and out-migrating kelts through the dam. Diel distribution for the two Sluiceway and Turbine study periods was highly variable. The lack of a clear pattern suggests that fish are passing at all times of day. Diel distribution for the Turbine only study indicated fish passage occurred only during morning periods; passage apparently did not occur during afternoon or nighttime 18

Passage Summary During fall, fallback rate at the turbines was twice that of winter and high at the sluiceway (approximately18 fish/day). During winter, fall back through the turbines was low at less than 1 fish/day during the 82-day period. During early spring, passage rates through turbines were low (< 1 fish/day); however, passage rates at the sluiceway were high (58 fish/day). Study Period # of Days Turbine Sluiceway Total Passage Turbine # Fish/Day Sluiceway # Fish/Day Total # Fish/Day Nov 1 – Dec 15 45 75 804 879 1.67 17.87 19.54 Dec 16 – March 7 82 62 N/A 0.75 March 8 – April 10 34 27 1,958 1,985 0.79 57.59 58.38 Total 161 164 2,762 2,926 19

Passage Summary 2008/2009 and 2009/2010 For the 2008/2009 study, 3,556 adult steelhead targets passed the dam during the two study periods combined (11/1/08 – 12/15/08 and 3/1/09 – 4/10/09). For the 2009/2010 study, 2,926 adult steelhead targets passed the dam during all three study periods combined (11/1/09 – 4/10/10). Sluiceway Turbine Units Total Study Years 2008/2009 2009/2010 Nov 1 – Dec 15 1,704 804 86 75 1,790 879 March 1 – April 10 1,673 1,958 93 27 1,766 1,985 3,377 2,762 179 102 3,556 2,864 20

Conclusion The results of this study indicates support for operating the sluiceway for steelhead fallback through December 15, closing it during winter, and opening it again on March 1 for adult steelhead moving downstream at The Dalles dam. 21