Gas field development involves the optimal selection of well number, well placement, well tubing size, and pipeline characteristics to deliver a specified.

Slides:



Advertisements
Similar presentations
Valuation of Natural Gas in Salt Cavern Storage Facilities
Advertisements

DESIGNING A WATERFLOOD Designing a water flood involves both technical and economic consideration. Economic analysis are based on estimates of water.
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
CVEN 5838 Aug 28, 2008 Lecture 2 Reservoir Capacity Yield Analysis (how to size a reservoir and measure its performance)
Nidal Salim, Walter Wildi Institute F.-A. Forel, University of Geneva, Switzerland Impact of global climate change on water resources in the Israeli, Jordanian.
Chapter 7 Estimation: Single Population
OIL RECOVERY MECHANISMS AND THE MATERIAL BALANCE EQUATION
Basic Business Statistics, 11e © 2009 Prentice-Hall, Inc. Chap 8-1 Confidence Interval Estimation.
Introduction to Petroleum Design
Management Application: Volume of Water in Storage (An Ogallala Example with Applicability to All Aquifers in Texas) Judy A. Reeves, Ph.D. Hydrogeologist,
Early Offshore Petroleum Development Cost Estimates Using GIS Narmina Lovely, GEOG 596A Advisor: Patrick Kennelly.
MUD LOGGING DEFINITION, THEORY & LAG CALCULATIONS
OIL AND GAS EVALUATIONS PROBABLE & POSSIBLE RESERVES WHAT WILL THE INVESTOR THINK? February 15, 2010 FORREST A. GARB & ASSOCIATES, INC. INTERNATIONAL PETROLEUM.
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
CAMELOT Coordination Analysis Motivation Execution Logistics Tracking.
Example - Use of a simulation- optimization approach to assess potential strategies for ground- water management in the Albuquerque area, New Mexico.
CE 3354 Engineering Hydrology Lecture 21: Groundwater Hydrology Concepts – Part 1 1.
© 2014 Minitab, Inc. Justin Callahan Commercial Sales Representative.
Centro de Electrónica Industrial (CEI) | Universidad Politécnica de Madrid | | In magnetic components for power electronics applications.
Goal of Stochastic Hydrology Develop analytical tools to systematically deal with uncertainty and spatial variability in hydrologic systems Examples of.
Operations & Logistics Management Lesson 7- Process Design & Lesson 8- Capacity & Buffering Operations.
1 GRI NW Investment project in progress Cross-border gas transmission‏ Update on Investment project I1 GRI NW Focus at Virtual Test (Business Simulation)
What Archipro.com offers Employers: Job Postings Candidate Search Interview Forms Screening Tools Job Postings Candidate Search Interview Forms Screening.
Nominations PEA Meeting October Why ask for Nominations? In a common carriage system gas flows must be approved in advance to keep them within pipeline.
Inventory Management.
Demand Estimation & Forecasting
Chapter 7 Demand Estimation and Forecasting
Chapter 5 Well Testing (III)
H2A Delivery: Enhanced Models, New Results
GMS Geostatistical Realizations CMG-STARS Results
SUBSEA GAS BOOSTING Jon Steinar Gudmundsson October 8, 2008
Chemical additive solutions to overcome challenges and create value
Gas Condensate Rate Equation
Exercise 1 HYSYS Review 11/12/ Design & Analysis II.
Potential for Geological Carbon Sequestration using deep saline aquifers in the Illinois Basin GIS Term Project Julien Botto.
Houston, 4th & 5th February 2003
e-notes (c) Curtis H. Whitson, Robert E. Mott
Gas Condensate Blockage
The material balance for simple depletion defines the relation between average reservoir pressure and (a) cumulative wellstream produced, (b) cumulative.
Calculators and logs Logarithmic equations
Problem statement Given: a set of unknown parameters
PHD IN PETROLEUM ENGINEERING PEDRO PEREIRA Motivation
The material balance for simple depletion defines the relation between average reservoir pressure and cumulative gas produced. The straight-line MB assumes.
Gas Field Development Class Example
Time Format for a New Label
e-notes (c) Curtis H. Whitson
Modeling Well Performance in Simulation
Quarterly Journal of Engineering Geology and Hydrogeology
Gas Condensate Blockage
Gas Condensate Blockage
Condensate blockage is the build-up of liquid around the wellbore, reducing the effective gas permeability and lowering well deliverability.  Condensate.
e-notes (c) Curtis H. Whitson
The Quality Control Function
Gas field development involves the optimal selection of well number, well placement, well tubing size, and pipeline characteristics to deliver a specified.
The gas rate equation defines the relationship between surface gas rate and pressure drawdown (average reservoir pressure minus bottomhole flowing pressure).
Chapter 7: Demand Estimation and Forecasting
WG5: Waste.
Chapter 7: Demand Estimation and Forecasting
e-notes (c) Curtis H. Whitson
Gas Condensate Rate Equation
e-notes (c) Curtis H. Whitson, Robert E. Mott
e-notes (c) Curtis H. Whitson, Robert E. Mott
Gas Field Development Class Example
Gas Condensate Blockage
e-notes (c) Curtis H. Whitson, Robert E. Mott
Chapter 7 Demand Estimation & Forecasting
e-notes (c) Curtis H. Whitson
Demand Estimation & Forecasting
The material balance for simple depletion defines the relation between average reservoir pressure and (a) cumulative wellstream produced, (b) cumulative.
Presentation transcript:

Gas field development involves the optimal selection of well number, well placement, well tubing size, and pipeline characteristics to deliver a specified contract rate (DCQ - daily contract quota) and specified contractual (plateau) period. The engineering tools required are (a) reservoir material balance(s); (b) well rate equations for reservoir and tubing; and (c) pipeline rate equations. Reservoir simulation is often not necessary, but may be convenient. Data acquisition is needed early to estimate key parameters in the calculations mentioned in (2). These include core data, log interpretation, geologic mapping, and well testing. Field gas rate ‘swing’ considerations may be important, accounting for a seasonal variation in production rate demand (maximum in winter). Compression design may be important during the contractual period, but almost certainly during the decline period of production. Uncertainty analysis should focus on the parameters which are known to be important and known to be uncertain (IGIP, kh, skin, aquifer strength).