WG11 Snapshot May ‘11 Date: 08 -May-2011 Authors: Name Company Address

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0224r0 Submission March 2011 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot March ‘11 Date: 13 -March-2011 Authors:
Advertisements

Doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot July ‘09 Date: Authors:
Doc.: IEEE /1096r0 Submission November 2009 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot November ‘09 Date: Authors:
Doc.: IEEE /0259r0 Submission March 2009 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot March ‘09 Date: Authors:
WG11 Opening Report Snapshots March 2013
July 2011 Closing Plenary Motions
Jan 2013 Motions Date: Authors: Jan 2013 May 2006
WG11 Snapshot May ‘09 Date: Authors: Name Company Address
WG11 Snapshot November ‘10 Date: 2010-Nov-07 Authors: Name Company
WG11 Snapshot September ‘11
WG11 Snapshot January ‘11 Date: 16 -January-2011 Authors: Name Company
WG11 Snapshot January ‘11 Date: 16 -January-2011 Authors: Name Company
P802.11s report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
WG11 Opening Report Snapshots September 2013
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
WG11 Snapshot March ‘12 Date: 09 -March-2012 Authors: Name Company
WG11 Opening Report Snapshots January 2013
Revision Process Summary
WG11 Snapshot September 2012 Date: 11 – November Authors: Name
WG11 Snapshot March ‘10 Date: Authors: Name Company Address
WG11 Snapshot July 2012 Date: 16 -July-2012 Authors: Name Company
Working Group Opening Report May 2014
WG11 Snapshot May ‘10 Date: Authors: Name Company Address
WG11 Snapshot July ‘10 Date: Authors: Name Company Address
TGaf Waikoloa Closing Report
June 2010 doc.: IEEE /0705r0 November 2010
WG11 Snapshot July ‘11 Date: 18 -July-2011 Authors: Name Company
WG11 Snapshot September ‘10
January 2013 doc.: IEEE < > January 2013
WG11 Snapshot March ‘10 Date: Authors: Name Company Address
TGaf Geneva Closing Report
WG11 Snapshot March ‘09 Date: Authors: Name Company Address
WG11 Snapshot July 08 Date: Authors: Name Company Address
July 2013 doc.: IEEE < > July 2013
July 2010 Closing Plenary Motions
July 2010 Closing Plenary Motions
WG11 Snapshot January ‘11 Date: 16 -January-2011 Authors: Name Company
Mar 2010 Closing Plenary Motions
WG11 Snapshot November ‘10 Date: 2010-Nov-07 Authors: Name Company
WG11 Snapshot July ‘10 Date: Authors: Name Company Address
Mar 2010 Closing Plenary Motions
July 2010 Closing Plenary Motions
Nov 2009 Closing Plenary Motions
Mar 2010 Closing Plenary Motions
IEEE MEDIA INDEPENDENT HANDOVER
WG11 Snapshot March ‘10 Date: Authors: Name Company Address
Mar 2010 Closing Plenary Motions
July 2010 Closing Plenary Motions
WG11 Snapshot November ‘10 Date: 08 -November-2010 Authors: Name
WG11 Snapshot May ‘10 Date: Authors: Name Company Address
WG11 Snapshot July ‘09 Date: Authors: Name Company Address
June 2010 doc.: IEEE /0705r0 December 2010
July 2011 Closing Plenary Motions
WG11 Snapshot July ‘10 Date: Authors: Name Company Address
Nov 2011 Closing Plenary Motions
TGm Closing Report – May 2010
July 2009 Closing Plenary Motions
WG11 Snapshot May 08 Date: Authors: Name Company Address
November 2010 doc.: IEEE /0800r9 November 2011
WG11 Snapshot September 08 Date: Authors: Name Company
May 2008 Closing Plenary Motions
WG11 Snapshot January ‘10 Date: Authors: Name Company
WG11 Snapshot January ‘10 Date: Authors: Name Company
May 2010 Closing Plenary Motions
WG11 Snapshot September 2012 Date: 11 – November Authors: Name
WG11 Snapshot January ‘09 Date: Authors: Name Company
September 2012 doc.: IEEE < > September 2012
WG11 Snapshot July ‘09 Date: Authors: Name Company Address
Presentation transcript:

WG11 Snapshot May ‘11 Date: 08 -May-2011 Authors: Name Company Address doc.: IEEE 802.11-11/0483r0 May 2011 WG11 Snapshot May ‘11 Date: 08 -May-2011 Authors: Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 bkraemer@ marvell .com Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

PAR Expiration/Renewal Schedule May 2011 PAR Expiration/Renewal Schedule Project PAR Expiration Date MB 31-DEC-2011 S Revision 31-DEC-2012 AA AC AD AE 31-DEC-2013 AF AH 31-DEC-2014 AI https://development.standards.ieee.org/pub/active-pars?n=22&o=1a0a2a3d Bruce Kraemer (Marvell)

May 2011 Officers Bruce Kraemer (Marvell)

WG11 Task & Study Group Officers – May 2011 doc.: IEEE 802.11-11/0483r0 May 2011 WG11 Task & Study Group Officers – May 2011 Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro S Dee Denteneer Guido Hiertz Kazuyuki Sakoda Guenael Strutt U none Necati Canpolat Dave Stephenson V Emily Qi -OPEN- AA Ganesh Venkatesan Alex Ashley AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim Robert Stacey AD Eldad Perahia Vinko Erceg, James Yee Carlos Cordeiro AE Henry Ptasinski Matthew Fischer AF Richard Kennedy Zhou Lan AH Dave Halasz Wong Yu Song Jae-Hyung Song AI Hiroshi Mano Marc Emmelmann Tom Siep Hitoshi Morioka SC WNG Clint Chaplin Ad hoc ARC Dave Bagby JTC1 Andrew Myles REG SG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

WG11 Task & Study Group Officers – May 2011-adj doc.: IEEE 802.11-11/0483r0 May 2011 WG11 Task & Study Group Officers – May 2011-adj Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro S Dee Denteneer Guido Hiertz Kazuyuki Sakoda Guenael Strutt U none Necati Canpolat Dave Stephenson V Emily Qi -OPEN- AA Ganesh Venkatesan Alex Ashley AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim Robert Stacey AD Eldad Perahia Vinko Erceg, James Yee Carlos Cordeiro AE Henry Ptasinski Matthew Fischer AF Richard Kennedy Zhou Lan AH Dave Halasz AI Hiroshi Mano Marc Emmelmann Tom Siep Hitoshi Morioka SC WNG Clint Chaplin Ad hoc ARC Dave Bagby JTC1 Andrew Myles REG SG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

May 2011 Status Reports Bruce Kraemer (Marvell)

Current Membership Status May 2006 doc.: IEEE 802.11-06/0528r0 May 2011 Current Membership Status Status Number Aspirant 117 Potential Voter 42 Voter 315 Definitions: Aspirant: a member who has attended 1 qualifying meeting Potential Voter: a member who has attended 2 qualifying meetings and will become a voter at the start of the next plenary they attend Data as of 2011-01-14 Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell

IEEE 802.11 Standards Pipeline May 2011 doc.: IEEE 802.11-11/0483r0 May 2011 IEEE 802.11 Standards Pipeline 802.11z TDLS 802.11s Mesh 802.11 -2007 MAC 802.11r Fast Roam e QoS 802.11u WIEN 802.11k RRM h DFS & TPC 802.11aa Video Transport 802.11V Network Management 802.11Y Contention Based Protocol 802.11ai FILS i Security Smart Grid f Inter AP 802.11ae QoS Mgmt Frm 802.11p WAVE 802.11mb Revision WNG 802.11 ah a 54 Mbps 5GHz 802.11n High Throughput (>100 Mbps) 802.11af TVWS g 54 Mbps 2.4GHz 802.11ac VHT 5GHz 802.11W Management Frame Security 802.11b (’99) 11 Mbps 2.4GHz PHY 802.11ad VHT 60GHz Published Amendment Discussion Topics Study groups TG without draft WG Letter Ballot Sponsor Ballot Published Standard Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

WG11 Editor Abstract / Agenda – May 2011 July 2007 March 2010 doc.: IEEE 802.11-10/0990r1 May 2011 WG11 Editor Abstract / Agenda – May 2011 Roll Call / Contacts / Reflector Go round table and get brief status report ANA Status / Process / What is administered 802.11 Mandatory Editorial Coordination before SB Numbering Alignment process / Spreadsheet Amendment Ordering / Draft Snapshots Style Guide for 802.11 MIB style and Frame practices (FrameMaker 10.0) Slide 9 Bruce Kraemer (Marvell) Page 9 Bruce Kraemer (Marvell) Terry Cole (AMD)

WNG SC – May 2011 Review of objectives Advanced Clear Channel Assessment (CCA) &/or Specific Transmit Power Control (TPC) – Lawrence Zuckerman 802.11 WNG Presentation on the use of UWB spectrum for 802.11 – Jim Lansford (11-11-0591-00-0wng-dsa-system-for-2-4ghz-ism-band.pptx) – Shoichi Kitazawa Review Objectives for July 2011 Meeting Page 10

802.11 ARC SC meets “as needed” Ongoing Topic is Architecture revision May 2011 May 2008 doc.: IEEE 802.11-07/0547r0 doc.: IEEE 802.11-11/0483r0 May 2011 IEEE 802.11 ARC SC – May 2011 802.11 ARC SC meets “as needed” Ongoing Topic is Architecture revision 802.1 architecture document revision effort Brief update given in May Plenary Concerted effort to complete comment resolutions and got to ballot in July No ARC session slot in May Slide 11 Bruce Kraemer (Marvell) Page 11 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

May 2008 Month Year doc.: IEEE 802.11-yy/xxxxr0 doc.: IEEE 802.11-07/0547r0 May 2011 TGmb - May 2011 Recirculation Sponsor Ballot on Draft 8.0 closed 14 Apr Pool 186, 136 affirmative – 92%, 12 Disapprove – 8%, 10 Abstain – 6% 863 comments This meeting Comment resolution, work towards recirculation SB Revisit timelines Agenda in 11-11-0614 Plan to incorporate published amendments (11s) during SB process Skype request for Adrian Slide 12 Bruce Kraemer (Marvell) Page 12 John Doe, Some Company Bruce Kraemer (Marvell)

IEEE 802.11s Mesh Networking May 2011 November 2009 September 2009 doc.: IEEE 802.11-07/0547r0 doc.: IEEE 802.11-xxx May 2011 IEEE 802.11s Mesh Networking TGs Draft 10.0 passed the 3rd Recirculation Sponsor Ballot (closing April 9 ) with 96.6% approval and 246 comments. The approval rate was slightly up compared to the second recirculation Sponsor Ballot, the number of comments was slightly down. The group resolved all comments during the intervening telecons, prepared Draft 11.0, and started a new recirculation on April 22. The Ballot closed with 96.6% approval and 119 comments, see below. After the ballot closed 177 additional comments were received (120 Ed, 57 Tech). 1 editorial Technical/General Must be satisfied 0% 18 15% Other 54 45% 47 40% Slide 13 Bruce Kraemer (Marvell) Page 13 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

IEEE 802.11aa – Indian Hills, CA - May doc.: IEEE 802.11-09/xxxxr0 Jan 2011 IEEE 802.11aa – Indian Hills, CA - May Goals: Resolve 3nd recirculation LB comments and approve corresponding resolutions Start recirculation letter ballot on Draft 5.0 Form Sponsor Pool (depends on LB175 results) Opening report in document 11/0500r0 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

IEEE 802.11ac – May 2011 Continue with Draft D0.1 comments resolution. November 2010 doc.: IEEE 802.11-10/xxxxr0 May 2011 IEEE 802.11ac – May 2011 Continue with Draft D0.1 comments resolution. Continue with Ad Hoc group meetings and straw polls. Prepare TG draft D1.0 and ask for WG permission to start WG Letter Ballot. Technical Submissions. Agenda in document 11-11/0582r0. Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

TGad – Meeting Goals - May Finish comment resolution on D2.0 Approve D3.0

TGae May 2011 Summary LB 176 Result Summary: Month Year doc.: IEEE 802.11-yy/xxxxr0 Month Year TGae May 2011 Summary LB 176 Result Summary: 86% Approval (163 Approve, 21 Disapprove, 37 Abstain). Complete LB 176 Comment Resolution 142 Comments (84 Editorial, 58 Technical) Approve Recirculation LB Form Sponsor Ballot Pool Revise plan of record. John Doe, Some Company John Doe, Some Company

TGaf – Meeting Goals May 2011 Approve meeting, ad hoc meeting and teleconference minutes Review the results of LB171 Approve the LB171 comment spreadsheet in 11-11/277r11 Review the progress since March Comment resolution Plan for July meeting and teleconferences Slide 18

IEEE 802.11ah Snapshot - May Primary focus Start work on, Month Year doc.: IEEE 802.11-10/0587r0 May 2011 IEEE 802.11ah Snapshot - May Primary focus Make progress on channel model document Start work on, Requirements document Specification framework document Timeline review & Teleconference schedule David Halasz, OakTree Wireless David Halasz, Aclara

IEEE 802.11 FIA TGai – Palm Springs, May 2011 doc.: IEEE 802.11-09/xxxxr0 May 2011 IEEE 802.11 FIA TGai – Palm Springs, May 2011 Goals for the Meeting: Review and Approve the Singapore and Teleconference meeting minutes Presentation of submissions Approve a use case scenario documentation Approve a functional requirement documentation TIME line of task group Plan for July & Teleconference Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

May 2008 doc.: IEEE 802.11-07/0547r0 May 2011 IEEE JTC1 ad hoc – May 2011 The agenda items that will be addressed this week are: Tuesday Review status of liaisons previously sent to SC6 Review “draft liaison” presentation for SC6 meeting in June Consider update on WAPI progress Review “identifier conflict” presentation for SC6 meeting in June Discuss “802.11 is secure” presentation for SC6 meeting in June Thursday Review possible NPs to be discussed at SC6 meeting in June Discuss “802.11 replacement” presentation for SC6 meeting in June Review “802.1 replacement” presentation for SC6 meeting in June Review and approve any liaisons and presentations to SC6 Discuss delegation & planning teleconferences for SC6 meeting Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

Regulatory Ad Hoc Committee Meeting Goals May 2011 The regulatory summaries Regulatory issues status FCC open issues Test plan for TVDBs EN 300 328 revision update; actions in TG11 FCC 5 GHz rules changes update Critical issues actions

Tuesday pm1 & Thursday am1 Revision NIST Smart Grid PAP#2 Report plan. May 2011 doc.: IEEE 802.11-11/0483r0 May 2011 Smart Grid – May 2011 Tuesday pm1 & Thursday am1 Revision NIST Smart Grid PAP#2 Report plan. Australian Smart Metering RFI UK Consultation Update of activities in P2030 Open SG ITU Focus Group ITU-R paper IEEE Vision Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

May 2011 Recent Ballots Bruce Kraemer (Marvell)

Recent Ballot History Year Inter meeting Period Ballots Completed WG May 2011 Recent Ballot History Year Inter meeting Period Ballots Completed WG Sponsor 2010 July - Sept 2 7 Sept - Nov 4 2010/2011 Nov - Jan 1 3 2011 Jan - Mar Mar - May Bruce Kraemer (Marvell)

May 2011 P802.11ad – D2.0 - WG LB 174 802.11 Ballot #174 was the first 15 day Working Group technical recirculation Ballot asking the question "Should P802.11ad D2.0 be forwarded to Sponsor Ballot?". The Official results are: Ballot Opening Date: Monday March 21, 2011 - 23:59 ET Ballot Closing Date: Tuesday April 05, 2011 - 23:59 ET RESPONSE RATE: 278 eligible people are in this ballot group. 175 affirmative votes 25 negative votes 25 abstention votes === 225 votes received = 80.9% valid returns = 11.1% valid abstentions APPROVAL RATE: 175 affirmative votes = 87.5 % affirmative 25 total negative votes = 12.5 % negative The 75% affirmation requirement has been met, Motion passes. There were 330 comments received. Bruce Kraemer (Marvell)

May 2011 P802.11aa – D4.0 - WG LB 175 IEEE 802.11 WG Letter Ballot #175 was a 15 day recirculation Working Group Technical Ballot asking the question "Should P802.11aa D4.0 be forwarded to Sponsor Ballot?" The Official results follow: Ballot Opening Date: Friday March 25, 2011 - 23:59 ET Ballot Closing Date: Saturday April 09, 2011 - 23:59 ET RESPONSE RATE: 257eligible people are in this ballot group. 135 affirmative votes 23 negative votes 37 abstention votes === 195 votes received = 75.8% valid returns = 19.0% valid abstentions APPROVAL RATE: 135 affirmative votes = 85.4 % affirmative 23 total negative votes = 14.6 % negative The 75% affirmation requirement has been met, Motion passes. There were 93 comments received. Bruce Kraemer (Marvell)

May 2011 P802.11ae - D3.0 - WG LB 176 802.11 Ballot #176 was a 15 day Working Group technical recirculation Ballot asking the question "Should P802.11ae D3.0 be forwarded to Sponsor Ballot?". The Official results are: Ballot Opening Date:    Monday April 11, 2011 - 23:59 ET Ballot Closing Date:   Tuesday April 26, 2011 - 23:59 ET  RESPONSE RATE: 278 eligible people are in this ballot group.     163 affirmative votes    21 negative votes     37 abstention votes ===   221 votes received = 79.5% valid returns                          =  16.7% valid abstentions   APPROVAL RATE: 163  affirmative votes       =   88.6 % affirmative   21  total negative votes  =     11.4 % negative The 75% affirmation requirement has been met, Motion passes. There were 142 comments received. Bruce Kraemer (Marvell)

P802.11s D10.0 - 3rd Sponsor recirc May 2011 The third IEEE P802.11s (MESH networking) 15 day recirculation Sponsor Ballot asked the question “Should P802.11s Draft 10.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date: Friday March 25, 2011 - 23:59 ET Ballot Closing Date: Saturday April 09, 2011 - 23:59 ET RESPONSE RATE: 184 eligible people are in this ballot group. 140 affirmative votes 5 negative votes with comments 0 negative votes without comments 9 abstention votes ======= 154 votes received = 83.7 % valid returns = 5.8% valid abstentions APPROVAL RATE: 140 affirmative votes = 96.6 % affirmative 5 total negative votes = 3.4 % negative The motion passes. There were 246 comments received Bruce Kraemer (Marvell)

P802.11s D11.0 - 4th Sponsor recirc May 2011 The fourth IEEE P802.11s (MESH networking) 15 day recirculation Sponsor Ballot asked the question “Should  P802.11s  Draft 11.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date:   Friday  April 22, 2011 - 23:59 ET Ballot Closing Date:     Saturday      May 07, 2011 - 23:59 ET  RESPONSE RATE: 184 eligible people are in this ballot group.     140 affirmative votes 5 negative votes with comments 0 negative votes without comments 9 abstention votes ======= 154  votes received  =  83.7 % valid returns                              =  5.8% valid abstentions   APPROVAL RATE: 140  affirmative votes       =      96.6 % affirmative    5  total negative votes  =     3.4  % negative   The motion passes. There were 119 comments received + 177 late comments Bruce Kraemer (Marvell)

P802.11Revmb D8.0 – 2nd Sponsor recirc May 2011 P802.11Revmb D8.0 – 2nd Sponsor recirc The IEEE P802.11REVmb (802.11 roll-up revision) 20 day 2nd recirculation Sponsor Ballot asked the question “Should P802.11REVmb Draft 8.0 be forwarded to RevCom?” The official results for this Sponsor Ballot follow: Ballot Opening Date: Friday March 25, 2011 - 23:59 ET Ballot Closing Date: Thursday April 15, 2011 - 23:59 ET RESPONSE RATE: 186 eligible people are in this ballot group. 136 affirmative votes 12 negative votes with comments 0 negative vote without comments 10 abstention votes ======= 158 votes received = 84.9 % valid returns = 6.3% valid abstentions APPROVAL RATE: 136 affirmative votes = 91.9 % affirmative 12 total negative votes = 8.1 % negative The motion passes. There were 863 comments received Bruce Kraemer (Marvell)