2018 RTEP Report Key Maps, Tables & Figures

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Resource Adequacy in PJM
NERC’s Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
©2003 PJM Factors Contributing to Wholesale Electricity Prices Howard J. Haas Market Monitoring Unit November 30, 2006.
PJM©2012 Offshore Wind Integration Studies at PJM September 13, 2012 Steven Herling Vice President, Planning PJM Interconnection.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
©2004 PJM 1 STATE OF THE MARKET REPORT 2003 Joseph E. Bowring Manager PJM Market Monitoring Unit FERC Briefing Washington, D.C. April 14, 2004.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
PJM©2010 PJM Regional Transmission Planning Experience Andrew Ott Senior Vice President, Markets 2010 NASUCA Mid-Year Meeting June 15, 2010.
Attachment to Testimony of Joseph Bowring Ohio Energy Mandates Study Committee April 16, 2015.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
Updated 1/28/2011.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
PJM©2015 ATTACHMENT TO TESTIMONY OF ANDREW OTT OHIO ENERGY MANDATES STUDY COMMITTEE MARCH 18,
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
1 Entergy Transmission Planning Summit Transmission Planning Process Doug Powell New Orleans, LA July 8, 2004.
Gas/ Electric Coordination
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Generation Adequacy Task Force Meeting April 10, 2014.
PJM© Market Efficiency RTEP Proposal Window PJM TEAC 1/9/2014 – Market Efficiency Presentation.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
PJM ©2007 NERC LTRA Workshop August 16, 2007 Paul McGlynn Manager, Transmission Planning Department.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
1 PLANNING CONFERENCE ON MARYLAND’S ENERGY FUTURE WILLIAM GAUSMAN VICE PRESIDENT ASSET MANAGEMENT JULY 25 – 26, 2007.
Wind Management at MISO
Oncor Electric Delivery Company LLC
Affordable Energy Production from Renewable Fuel
Compliance Report to ERCOT TAC February 2007
Massachusetts Electric Restructuring Roundtable
Evolving Economic Dispatch in SPP
Wind Industry Market and Policy Overview
Michael I. Henderson ISO New England Inc.
Transmission Planning at PJM Interconnection LLC
Andrew Ott, President & CEO PJM Interconnection
Module 4 Smart Grid Implementation Issues
Reliability Assessment Committee Reliability Workshop Priorities
Appendix: 2017 RTEP Report Key Graphics and Information
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
New England Resource Adequacy
NERC LTRA Workshop August 16, 2007
Alternative ICAP Proposal
Reliability Assessment Committee Reliability Workshop Priorities
2021 Adequacy Assessment Status Report
Anna Garcia Air Innovations Conference August 2004
Integration of Wind Energy in PJM
Power Generation: Natural Gas Role
Solar Energy Commercialization
Supplemental Project Planning Process Under Order 890 Within PJM
Presentation transcript:

2018 RTEP Report Key Maps, Tables & Figures The following set of slides provides key information from PJM’s 2018 RTEP cycle. The slides are provided for the reader’s own communications needs. www.pjm.com

Backbone Map www.pjm.com

RTEP Process – RTO Perspective www.pjm.com

System Enhancement Drivers www.pjm.com

Approved RTEP Projects (December 31, 2018) NOTE: Since 1999, the PJM Board has approved transmission system enhancements totaling $37.1 billion. Of this, $29.9 billion represents baseline projects to ensure compliance with NERC, regional and local transmission owner planning criteria and to address market efficiency congestion relief. An additional $7.2 billion represents network facilities to enable more than 85,000 MW of new generation to interconnect reliably. www.pjm.com

Approved Baseline Projects by Voltage – 2015-2018 www.pjm.com

PJM Existing Installed Capacity Mix RPM Eligibility Capacity (December 31, 2018) As of Jan 31, 2018 www.pjm.com

PJM Queued Generation Fuel Mix- Requested Capacity Interconnection Rights (December 31, 2018) NOTE: Nameplate Capacity represents a generator’s rated full power output capability. www.pjm.com

Requested Capacity Interconnection Rights, Renewable Fuels (December 31, 2018)) www.pjm.com

Requested Capacity Interconnection Rights, Non-Renewable Fuels (December 31, 2018)) www.pjm.com

Queue Status Totals (December 31, 2018)) www.pjm.com

Queued Generation Progression – Requested Capacity Rights (December 31, 2018) www.pjm.com

PJM Generator Deactivations Received January 1, 2018 through December 31, 2018 www.pjm.com

2018 RTEP Baseline Projects by Driver www.pjm.com

Attachment M3 Process for Supplemental Projects www.pjm.com

Market Efficiency 24-Month Cycle www.pjm.com

Market Efficiency 24-Month Cycle NOTE: Ohio Valley Electric Corporation (OVEC) Integration was successfully completed on Dec. 1, 2018. www.pjm.com

Target Market Efficiency Project Study Results – Congestion Cost www.pjm.com

Interregional Market Efficiency Project Study Timeline www.pjm.com

Summer Peak Load Forecast Comparison (2017-2018) www.pjm.com

2018 Load Forecast Report www.pjm.com

10 Year Summer Peak Growth Rate Comparison 2014-2018 www.pjm.com