INTRODUCTION. ARCHITECTURAL TECHNOLOGY COURSES INVOLVED ACH 150 Construction Documents II 2 nd Semester Drafting/Design Studio Normal project – advanced.

Slides:



Advertisements
Similar presentations
Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.
Advertisements

Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Kalamazoo Concept #1 Two plazas at intersection of 52 nd and Kalamazoo fronted with curved.
Thomas Edison High School of Technology Dalewood Drive Silver Spring, Maryland.
CAMPUS MASTER PLAN. Goals To provide the up-to-date facilities that will enhance the quality of student life To redesign the campus so it reflects the.
Student Center Project Manifesting a Vibrant Learning and Campus Life Experience.
SOUTHERN UNIVERSITY at NEW ORLEANS Today, Tomorrow, and Beyond! How the Campus Will Look, and When Southern University at New Orleans Master Programming.
City of Manassas Park PPEA Project Proposal Recreation Center Manassas Park Community Center Department of Parks and Recreation.
Resident Assistant Recruitment
 Students are now required to attend a review session prior to taking placement tests ◦ Sessions last 1-2 hours or a take home packet can be used ◦ The.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
Glenvar High School Renovations School Board Presentation
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
The Kingdom Center Healing Streams Church & PAC Multi-Service Center.
Draft Zoning Code City Council Work Session June 21, 2007.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Lec 26: Ch3.(T&LD): Traffic Analysis – Trip generation
Chapter 16 Designing Homes for Today’s Needs Housing & Design Winter 2013.
Bay Elementary School Historical School Site (1938)
4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.
Cohort 16 & 17: Team 10 Design Studio Dec 2010: Cambridge Museum of Technology Mark Leeson Christopher Pountnay Marvin Lee Jonathan Portlock David Richards.
FSU London Study Centre. Established 1971 Established 1971 Moved to current location in 1993 after renovating facilities Moved to current location in.
Home Work- Boutique Serviced Apartments. Make your worlds meet! Discover the joy of ‘HOMEWORK’ like never before.
Hawthorne Hall – LEVEL 1 EXISTING. PROPOSED Hawthorne Hall – LEVEL 1.
 Using Colleges and Universities as Event Venues Chuck Salem, President of Unique Venues Norma Charette, Director of Conference Sales for Campus Conference.
MiraCosta College 2011 Proposition EE Plan Summary October, 2012.
The Tale of Two Projects: Needs Assessment and Post-Occupancy Evaluation in ITU Student Social Centres pelin dursun korkmaz 18th IAPS Conference, July.
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
________________________________________________________________________________________________________________________________________________________.
Good afternoon, We break ground next week for the Academic Success Center building on our campus that will house all of our programs, including drop-in.
Facilities Modernization Program Funded by Measure B Project Report April 19, 2010.
1 SCS Building Committee. 2 The SCS Building Committee Members: Guy Blelloch Randy Bryant Sharon Burks Peter Lee Jim Skees Manuela Veloso.
THE CATHOLIC UNIVERSITY OF AMERICA WASHINGTON DC SOUTH CAMPUS REDEVELOPOMENT ABDO DEVELOPMENT, LLC proposed by ABDO DEVELOPOMENT, LLC designed by TORTI.
Welcome to Our Virtual Tour. Student Lounge Second Floor.
1130 Connecticut Ave. Washington, DC * 218,750 SF Bldg *25% Vacancy * Built 1986 * Rent = ~$46/SF * Office Building * Valuation =~$91M.
The following slides are photos of the current construction progress on the Marvin & Joyce Whitfield Life Campus.
Site Plan Site Plan Overall Plan Old School Bldg. Classroom Bldg.
Creating Inclusive Universally Designed Spaces Sharon O’Grady MRIAI Senior Executive Architect South Dublin County Council.
Design Charrette - B Damar Mercado-Hastings Chaeyoung Kim Maxwell Hines Isabel Freedman Johari Rhett.
EMILY TOTTEN ADVANCED TOPICAL DESIGN STUDIO: URBAN ARCHITECTURE IN CONTEXT ISI FLORENCE FIRENZE: THE PORTFOLIO.
Hotels April 18 th, context Elements Layout Rooms Amenities Motels.
10 December 2015 Campus Master Plan. 10 December 2015 Draft Master Plan Concept Site Development Plan New Facilities Maintenance Building New College.
HKU SPACE Po Leung Kuk Community College Building Causeway Bay, Hong Kong 9 September 2008.
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
The National Research and Training Institute for the Blind Allison Brown Lighting/ Electrical Option April 17 th, 2003.
February 2, 2012 City of Lee’s Summit Cultural Facilities Master Plan 1.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010.
2008 Internship at Victoria Cooke Interiors Matt Leers ‘08.
Cato Campus Updates February This is what we were two years ago …
Michael Cho LATTC ARC 173 – Architectural Drawing II.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
Visioning Session Schedule Community Opportunities Community Opportunities o Starting with a blank page… Time and Task Time and Task 6:30 Introduction.
Study Abroad Program - Sinai University Winter Break 2017
Cambrian School District March 19, 2015
Coffee Chat: LA COSTA MEADOWS Elementary school Construction update
Present Reading / Homework
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Architecture ~ Architectural Plans ~
Architecture Pathway at NISD
Miami Palmetto SHS Replacement
Architecture Pathway at NISD
Center for Children and Families Cal State San Marcos
1 Semester Project Design A Multi Story Office Building
Kinesiology, Athletics, & Dance Department
1315 E. Cary Street FOR LEASE First Floor Suite Richmond, VA 23219
Special Valuation 1017 W First Avenue Oddfellows Hall/Montvale Event Center Commercial.
Presentation transcript:

INTRODUCTION

ARCHITECTURAL TECHNOLOGY COURSES INVOLVED ACH 150 Construction Documents II 2 nd Semester Drafting/Design Studio Normal project – advanced residential 11 students ACH 250 Construction Documents IV 4 th Semester Drafting/Design Studio Normal project – advanced commercial 3 students

TIME LINE FOR SEMESTER WEEKS 1-2 TOWN PLANNING WEEKS 3-4 CAMPUS PLANNING WEEKS 5-16 BUILDING PROJECT

PROCESS Town Plan Students divided up into three teams Student from ACH 250 acting as team coordinator Analysis of surrounding area Tour of area In-class and outside of class work End product – sketches

PROCESS Analysis of ESH site Class work Field trip Brown bag End Product Digital layout of campus

PROCESS Building Project Team concept Each team has member from ACH 250 ACH students Each student had specific tasks ACH 250 Designed addition alone Total classroom hours – approx. 75 hours

CONTEXT LEXMARK TRANSY BCTC UK IMPORTANT INTERSECTION PROPOSED & EXISTING STREETS FOR LINKAGES TO PROPOSED & EXISTING RESIDENTIAL AREAS CEMETERY

EASTERN STATE HOSPITAL LEXMARK YMCA HOPE CENTER HEALTH CENTER COOLAVIN APTS. COOLAVIN PARK RAILROAD FLORENCE CRITTENTON HOME

EASTERN STATE HOSPITAL ADMINISTRATION

EASTERN STATE HOSPITAL A BUILDING ONLY AN ARCHITECT COULD LOVE OLD LAUNDRY FACILITY

CAMPUS PLAN Program Administration Student Apartments Student Center Bookstore Food Service & Café Auditorium Cont. Ed. & Training Daycare Faculty Offices Amphitheater Walking Trails Parking

EXISTING ESH ADMIN. BLDG. Program Spaces common to both additions General Offices Conference Rooms ACH 150 Break Room & Kitchen Presidential Office Suite ACH 250 Elevator Lounge/lobby Gallery/Museum

EXISTING ESH ADMIN. BLDG. CHARACTERISTICS Common Two-story – first floor aligns with second floor of existing building Additions cannot obscure building front No major renovations proposed for existing building Design of additions not intended to relate to earlier campus plans ACH 150 Project characteristics Residential scale Intended to be more reflective of existing architecture ACH 250 Project characteristics Commercial scale Intended to be modern with some characteristics of existing End Product Construction documents Produced using Revit Architecture 2008