Major Inputs to MRP Process: 1. Bill of Material

Slides:



Advertisements
Similar presentations
Bill of Materials Janean F. Lulloff Business Management 361 Section 1 Dr. Foster Marriott School Brigham Young University.
Advertisements

To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
PowerLink Navigation The Power Of the ‘Right Click’ in PowerLink Jim Simunek
Managing Production across the Supply Chain
High Lights of SAP Business One for Manufacturing.
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
Material Requirements Planning and Enterprise Resource Planning Dr. Ron Lembke.
Parallelogram Inventor Assembly and analysis. Create a project.
Bill of Materials Title Slide.
Material Requirements Planning
Production Concepts. Let’s assume we are a manufacturer of bicycles What do we need to make a bicycle?
Session 11 Multi-Level Bill of Material Explosion pom
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
 SAP AG 2007 Production Maintaining bills of material (BOM) Production process Contents:
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
Lesson 3 — How a Computer Processes Data Unit 1 — Computer Basics.
Intermediate 2 Software Development Process. Software You should already know that any computer system is made up of hardware and software. The term hardware.
Production Process Contents: Maintaining bills of material (BOM) Production process.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Premium 2011 Setting Up the INVENTORY & SERVICES Module.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
More DFDs Class 12.
Production Planning and Control
Resource Planning Chapter 15.
Navigation: If the tutorial opens up in your web browser, simply click your mouse to advance to the next slide. Use the “Backspace”
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
PRODUCTION. Producing Products Production the multistep process of making parts and assembling them into products.
MIS Topic # 5 1 Bill of Materials. MIS Topic # 5 2 Bill of Materials Definition It is an engineering document that specifies the ingredients.
1. Enterprise Resource Planning Enterprise Resource Planning Systems is a computer system that integrates application programs in accounting, sales, manufacturing,
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
SISTEM INFORMASI ENTERPRISE
LESSON 5 Introduction to Materials Requirements Planning (MRP)
Computer Systems Nat 4/5 Computing Science Computer Structure:
Production Contents: Maintaining bills of material (BOM)
Material Requirements Planning (MRP)
MRP: Material Resource Planning
COMPUTER INTEGRATED MANUFACTURING
Topics Introduction Hardware and Software How Computers Store Data
Lecture 34 MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Production Contents: Maintaining bills of material物料清單(BOM)
Principles of Business & Finance Objective 4.03
MVP Insight: The Amazing World of Building Bills of Materials (BOMs)
Introduction to project accounting
Chapter 18 Buying a PC.
Material Requirements Planning and Enterprise Resource Planning
MRP and ERP.
Introduction to Materials Management
CHAPTER 14 MRP and ERP.
Display Item Information
Material Requirement Planning (MRP)
EPARTConnection Setup and Marketing.
Material requirements planning
Tour - session 2 Bills of materials
Topics Introduction Hardware and Software How Computers Store Data
Operations Management
Material Requirement Planning (MRP)
Production management
Inputs and Outputs to Aggregate Production Planning
Functional Information Systems
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Major Inputs to MRP Process: 1. Bill of Material Product structure file Determines which component items need to be scheduled Product Structure Record Clipboard Level 0 Level 1 Level 2 Spring (1) Bottom Clip (1) Top Clip (1) Pivot (1) Rivets (2) Clip Assembly (1) Pressboard (1)

Bill of materials - BOM In order to show the make-up (in terms of the parts needed for production) we have a Bill of Materials (BOM) for the end-product (namely the chair). BOM is a listing of all the subassemblies, intermediates, parts, and raw materials that go into a parent assembly showing the quantity of each required to make an assembly.

Structure of a BOM The diagram illustrates a bill of material for product A. Product A is made of assembly B, components C and D, and material E. Assembly B is made from components F, G, and H (as well as other assemblies or products). Purchased parts are normally  identified as materials  (items E, F, and G) but can be any product, assembly or component that depending on workload you choose to buy-out or manufacture. This chart was found at the following website: http://www.feldmanengineering.com/BoM_Glossary.htm

Processes that utilize a BOM Production Materials planning Product costing Plant maintenance This is just a few of many different areas in business that use a BOM to organize their materials. This list was obtained from the following web site: http://help.sap.com/saphelp_40b/helpdata/en/cd/daf2cd4ab011d18a0f0000e816ae6e/content.htm

Types of BOMs Static (fixed) bill Example: A bill of material for a part that is normally made from the same components, labor and raw materials. Used for standard assemblies, components, and engineer-to-order customer orders. Example: A bill of materials for a standard chair A static bill of materials is a fixed bill for standard assemblies. They use the same materials and components every time. An example of this is the building of a standard chair. The BOM would be the same every time so it would be a static bill of materials.

Types of BOMs Dynamic (parametric) bill Example: A bill of material for a product or part for which size, color, laminate, and other options can be selected. Example: A bill of materials for a Dell computer A dynamic bill can vary in the components that make up a product. An example of this type of BOM is for a Dell computer. For the most part the components are standard, but the customer can choose different features and so those parts will vary from project to project.

Types of BOMs Single level bill of material Example: A bill of material that lists the materials, parts and labor required to make another part. Example: A bill of materials to make a Dell computer A single level BOM lists the parts included in a single product like a Dell computer.

Single-level BOM

Types of BOMs Multilevel bill of material Example: A bill of material that lists the components, assemblies, and materials required to make a part, the components, assemblies, and materials required to make each component and assembly of the part, and so forth. Example: A BOM for the battery inside the Dell computer. To go deeper into a product, a multilevel BOM not only lists the parts of a product, but the parts of the components in the product. For example the BOM not only lists the parts in a Dell computer, but also the parts that are in the battery in the Dell computer. This information was found on the following website: http://www.feldmanengineering.com/BoM_Glossary.htm

Product Structure Diagram P301 Computer

Product Structure Diagram P301 Computer (Continued) b., c. Item Low-Level Code Quantity Required for One Unit* A – Arithmetic Board 2 1 B – Box Casing C – Ram Chip 3 16 K – Keyboard Unit M – Memory Board 4 P – Processor Unit R – ROM Chip S – Switch 9 V – Video Unit X – Board Type X Y – Board Type Y Z - Microprocessor *Assuming no inventory for any item

What information is on a BOM? Quantity Item ID# Description of Item Cost of Item Total Project Cost These five items are the most typical and important items on a BOM. Some examples provided later in the presentation do not follow this exact format because there is no standard format for a BOM. Each company needs to modify where needed to fit their individual needs. To illustrate a bill of materials, we will use the project of building a basic chair.

Quantity Tells user how many of each part is needed for each project Example: A chair needs 1 seat, 4 legs, 1 back, and 5 nails. The quantity is one of the most important parts of the BOM because it tells us how many parts are needed for a project. The chair for example needs 1 seat, 4 legs, 1 back, and 5 nails to hold it together. The builder would not want to order 3 legs or forget to order the back on accident because the chair would not be finished correctly to order.

Item ID # Tells us which part to order Can be any of the following: Catalog number, UPC, or any other identification number. Example: The chair needs a 2PC seat, 5DR legs, 6TU8 back, and 1 inch nails. The item ID number tells us which type of part to buy. The numbers need to be exact for the correct part to be ordered. In our example the chair needs a specific type of seat, legs, back, and nails. The ID number can be a catalog number assigned by either the company or the vendor, or can be a type of UPC scan-able label.

Description of Item Provides a check that the correct item is being ordered. The description of the item is just a quick check to make sure all the parts were included. This way the user does not have to memorize each part by ID number. Instead, they can quickly scan the BOM and see that a seat, legs, back, and nails are included.

Cost of Item Cost is included to show how much each part is per item and the total cost of all like parts. Example: The cost of a leg is $5 per leg. Then the total price of the legs ordered would be $20 because there are 4 legs. The cost of the item lets the user know the cost per item. We can then figure out the cost for all like items. Because we only need 1 seat and 1 back, their cost for like items would be the same as the cost per item. The legs, however, have different costs because we are ordering more than one leg. In this example the legs are $5 each, so the total price of legs ordered are $20.

Total Project Cost Shows the total cost of all items and is also the total cost of the direct materials used in the project. Example: Seat-$10, Back-$5, Leg-$5 per leg, Nail-$.5 per nail Total Cost of a chair = 10 + 5 + 5*4 + .5*5 = $37.50 The total project cost may be included in some BOM to show the total cost of all the items being ordered. In our example, the total cost of the chair is $37.50.

BOM Example Quantity ID# Description Unit Price Total Cost 1 6TU8 Back $5/Unit $ 5.00 4 5DR Legs $5/Unit 20.00 1 2PC Seat $10/Unit 10.00 5 1” Nails $0.50/Unit 2.50 Total Project Cost $37.50 This is a sample BOM based on the examples provided in this tutorial