Blanco TCS Upgrade PDR 23 Aug 2007

Slides:



Advertisements
Similar presentations
GSMT Control Workshop Tucson, September 11-12, 2001 Pointing Control for a giant segmented mirror telescope Patrick Wallace Rutherford Appleton Laboratory.
Advertisements

TCS3 Conceptual Design Review 1 Aug 21, 2003 TCS3 Project Replacement of the Telescope Control System for the IRTF Conceptual Design Review Aug 2003.
Highly Efficient Operations Keck Scientific Strategic Planning 2009 Hilton Lewis T. Armandroff, S. Adkins, R. Goodrich J. Johnson, K. Kinoshita, R. Matsuda.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
BHEL – Electronics Division, Bangalore
Line Efficiency     Percentage Month Today’s Date
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
Golf Swing Robot EE 486 Project Presentation College of Engineering and Technology Presented by Nasser Almarri.
Tim Abbott DECam & CTIO. Tim Abbott DECam & CTIO DECam will greatly expand and extend wide field imaging capability at CTIO.
LSST Scheduler construction plan Francisco Delgado Sr. Software Engineer Telescope & Site.
Tim Abbott DECam & CTIO. Tim Abbott DECam & CTIO: CTIO’s preparations Active Optics –33-pad system, LUT driven, updated every.
Tim Abbott DECam & CTIO. Tim Abbott DECam & CTIO DECam will greatly expand and extend wide field imaging capability at CTIO.
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
Current Telescope Control System Big Bear Solar Observatory Pointing and Tracking Guiding Light Beam Control.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
F/8 Repair and recommissioning status and near term forward look Ron Probst, Roberto Tighe 06 Nov 2012.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan
Pg 1 21 April 2016 ACTR Meeting SOAR Priorities Jay Elias.
CTIO Facilities Improvement Project (CFIP) Tim Abbott Joint Review Jan 2008.
Updates on projects 472, 470, 443, 462, 442, 471, 480, 483, 484 Tim Abbott Changes since 9 July are in blue.
DECam & NOAO/CTIO Tim Abbott DES Collaboration Meeting Rio de Janeiro, May 2009 Tim Abbott, DES Collab. mtg., Rio, May 2009.
Blanco TCS Upgrade PDR Introduction Tim Abbott. This review This Introduction –Panel, Motivation, Goals & Specifications, Staff Encoders & servos – Michael.
1 Board Telescope & Site Tucson, Arizona July 18-20, 2011 LLST Control Software Review Resources Tucson, January
The Blanco Environmental Control System Alistair R. Walker November
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
Fan Assembly Driven by Magnetic Fields
NEW UPGRADE TO THE APS MAGNETIC FIELD INTEGRAL MEASUREMENT SYSTEM
4m. Blanco TCS Upgrade: Signals and Interfaces
Technical resources schedule
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
Jan 2016 Solar Lunar Data.
4m. Blanco TCS Upgrade: Electronic Status at March/2010
Alistair Walker Version 3 December
SOCS/Scheduler Development Plan Michael Reuter, Fransicso Delgado
ETS For ACTR 9the April 2015 R.Tighe april 2011 april /04/2015
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March ver 2
Blanco 4M F8sec Upgrade.
4m. Blanco TCS Upgrade: Signals and Interfaces
INSTRUMENT CONTROLLER OVERVIEW
Average Monthly Temperature and Rainfall

MONSOON Status Barry Michael Starr 11/22/2018.
2017 Safety Group 1 – 5 Year Program Timeline Guide

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Vendor Interactions Paul J. Lotz.

2019 Safety Group 1 – 5 Year Program Timeline Guide

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Command and Data Handling
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
2016 Safety Group 1 – 5 Year Program Timeline Guide
Text for section 1 1 Text for section 2 2 Text for section 3 3

TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
2012 Safety Group 1 – 5 Year Program Timeline Guide
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline

Presentation transcript:

Blanco TCS Upgrade PDR 23 Aug 2007 Introduction Tim Abbott

This review This Introduction Encoders & servos – Michael Warner Panel, Motivation, Goals & Specifications, Staff Encoders & servos – Michael Warner Hardware – Eduardo Mondaca Software – German Schumacher

PDR Panel Bob Marshall (NOAO, Tucson) Brooke Gregory (CTIO) Darren Depoy (OSU) Charge: Is the project as presented capable of achieving its goals with the resources provided and in the time frame available? Please provide written comments and recommendations, separately or as a group.

Project Motivation Keep Blanco operating as a state-of-the art facility DECam, imposes some specifications, DES and the community. NEWFIRM, another potentially very efficient observing facility Existing instruments Retire & replace obsolete components The existing system incorporates many obsolete and obsolescent components and technology. Some components are home built with off-the-shelf options now available. The power amplifiers are originals. The mode-switching control model significantly constrains performance and was driven by the limited technology available at the time. Modernize software Modern servo technology, both and sense and drive ends, has advanced significantly since the last upgrade (20 years ago!). Can improve delivered image quality

Project Motivation Modernize software Modularize Interfaces are dated Capabilities are limited by today’s standards Much useful telemetry is dropped on the floor Modularize Existing system is highly centralized Control and servo functions are blended Improve maintainability Maintenance and modification get harder each year LSST prototyping An opportunity to capitalize on SOAR experience and develop essential experience for LSST Consolidated TCS support for 3 major telescopes.

Goals Maximize telescope efficiency for DECam/DES/NEWFIRM operations Replace obsolete & obsolescent components Replace wire-wrap & bread-boarded components with off-the-shelf and PCB components Use technology with an estimated >5 year market life

Goals Decouple mount, dome, rotator/guider from TCS Use SOAR/LSST model & components Set point / Status model Labview, Ethernet, Linux, new PMAC, Wallace kernel, comms middleware (DDS) (In the longer term, plan to retrofit SOAR with Blanco innovations.) (In the even longer term, plan to retrofit SOAR and Blanco with LSST innovations.) Introduce independent local and/or remote intelligence where appropriate

Goals Use new encoders Integrate all existing instruments higher resolution, greater reliability, precision Integrate all existing instruments Mosaic II, SISPI, Hydra, RC Spec, (NEWFIRM) Record and make available all telemetry from telescope to weather The upgrade is to be performed with existing TCS in place

Specifications Slew requirement: 2 degrees in 17 sec To match DECam readout time Slew, project goal: 3 degrees in 20 seconds, track-to-track Tracking: <0.5” drift in 60 sec everywhere within the DES area Jitter: 100 mas r.m.s. Guide error signal delivery rate: 1 Hz Operational deadline: Sept 2010.

Telescope drive power amplifiers Encoders (SMCs later) Leave: Replace: TCS Kernel Communications Dome & utility control GUI Mount Control Telescope drive power amplifiers Encoders (SMCs later) Leave: Telescope motors Guiders Active optics Rotator f/8 control Instruments (SMCs, for the time being)

Blanco 4M Upgrade Diagram Instruments IMAN Instruments Adapter Ethernet PC-Guider Operator GUI DECAM ISPI HYDRA MOSAIC NEWFIRM Motor Controllers (SMC) Remote Ops To Dome PLC 4MAP IMAN ROT4M F8SEC CFADC Dome Interface UDP, TCP/IP Dome Encoders Ethernet/ Serial RS-485 TCS App Kernel Dome/ Utility Comparison Lamps Interfaces Provided By CTIO Lamps Interface Facility Database To Ra/Dec Motors Mount Control HandPaddle Mount Interface To Guider Motors Interlocks Encoders Guider Interface IRIG-B Guider Encoders Time Weather, MASS DIMM, Sky Cam.

Project Staff Tim Abbott (Project manager/scientist, DECam deputy project manager) German Schumacher (Software manager) Ricardo Schmidt (Electronics group manager) Eduardo Mondaca (Electronics engineer, interfaces, hardware, servos) Michael Warner (Servos, hardware) Manuel Martinez (Connectivity, motor controllers) Rolo Cantarutti (Software) Omar Estay (Software) Francisco Delgado (Software) Andres Montane & group (Mechanics, fab) CTIO DSS Gale Brehmer (mgr), Enrique Schmidt, David Rojas, Javier Rojas, Humberto Orrego.

Software Timeline Control Design Purchases Servo Control 2008 2009 2010 Jul-Sep 07 Oct-Dec 07 Jan-Mar 08 Apr-Jun 08 Jul-Sep 08 Oct-Dec 08 Jan-Mar 09 Apr-Jun 09 Jul-Sep 09 Oct-Dec 09 Jan-Mar 10 Control Design Purchases Servo Control Mount Software Serial Software SMC Control TCS Application Dome/ Utility FD: Francisco Delgado GS: Germán Schumacher MM: Manuel Martínez MW: Michael Warner OE: Omar Estay RC: Rolando Cantarutti Guider Instruments Interfaces Facility Database Operator GUI Commis. GS 50% MW 50% MW 70% MW 50% OE 75% MM 50% RC 10% RC 70% FD 50% FD 70%

Electronics Timeline D&I = Design and Implementation Conceptual Design 2008 2009 2010 Jul-Sep 07 Oct-Dec 07 Jan-Mar 08 Apr-Jun 08 Jul-Sep 08 Oct-Dec 08 Jan-Mar 09 Apr-Jun 09 Jul-Sep 09 Oct-Dec 09 Jan-Mar 10 Conceptual Design Purchases Mount Interfaces and Power Drivers Encoder Tests Mount Tuning SMC Tests TCS Application Tests Support Dome/Utility Interface D&I DOME Tests Guider Interface D&I Guider Tests Instruments Interfaces D&I Instruments Tests Commis. EM 60% ET 30% ED 30% D&I = Design and Implementation

Capital costs