MRS, TEST STAND, EXTRUDER NEWS Victor Rykalin

Slides:



Advertisements
Similar presentations
Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
Advertisements

HCAL-J Status Hadron Calorimeter HCAL-J SBS Collaboration Meeting July, 2014 G. B. Franklin Carnegie Mellon University 7/8/2014 Carnegie Mellon INFN, Catania.
Experimental Method Experimental Method Kihyeon Cho Kyungpook National University Spring Semester 2005 Experimental Method and Data Process.
MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
ANTEC EXTRUSION SIMULATION AND EXPERIMENTAL VALIDATION TO OPTIMIZE PRECISION DIE DESIGN by Srinivasa Rao Vaddiraju, M.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Fermi National Accelerator Laboratory EXTRUDED SCINTILLATOR STRIPS FOR MINERVA Anna Pla-Dalmau Fermilab Victor Rykalin NICADD, Northern Illinois University.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
1 Comparison of One-Hole Die Shape Fermi National Accelerator Laboratory (FNAL) Department of Mechanical Engineering Northern Illinois University Northern.
OPTIMIZATION OF A PROFILE- EXTRUSION DIE DESIGN USING INVERSE CFD SIMULATION June Department of Mechanical Engineering,
Status of CLAS12 PCAL project
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
FNAL testbeam planning Jan 27, 2014 Alain Bellerive.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
Muon triggering system for the ALICE TOF cosmic tests for the ITEP Moscow: A.Akindinov Yu.Grishuk S.Kiselev D.Mal’kevich M.Ryabinin A.Smirnitski K.Voloshin.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
WBS 1.04 KLM Leo Piilonen Virginia Tech. Talk Outline WBS Element Scope Performance Requirements Cost Summary Schedule Risks Summary January 2014Leo.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Preparation for DESY Meeting
LKr status R. Fantechi.
Scintillators and sensors
Micromegas Vertex Tracker Status Report
Jean-Sebastien Graulich, Geneva
SuperB meeting, Frascati
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
Mini-drawers, FE-ASIC , Integrator
Spectrometer Solenoid Fabrication Status and Schedule
F.Guber, A.Ivashkin INR, Moscow
Plan your Time.
Tail-Catcher/Muon Tracker Prototype
What I am Thankful For Mr. How November 2010 Period 1.
SCINTILLATOR HARDWARE
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
Extruded Scintillator for MINERVA Victor Rykalin
Vishnu V. Zutshi For the NICADD team.
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Si PM , the first glance Victor Rykalin
Operations/Failure Analysis
12/7/2018 Irradiation plan Victor Rykalin Victor Rykalin.
Efficiency Study of Prototype Scintillator for INGRID
Scintillators and sensors
Operations/Failure Analysis
Operations/Failure Analysis
Testbeam status report
Krzysztof Czuba ESS LLRF Quarterly Meeting
DCM II DCM II system Status Chain test Schedule.
Operations/Failure Analysis
Test of the designed die
5/14/2019 Scintillator extrusion at FERMILAB (Joint FERMILAB-NICADD project) Victor Rykalin Victor Rykalin.
Equipment Status ARCS equipment status DAQ equipment status
Extruded Scintillator for MINERVA Victor Rykalin
Nov. 10th, Meeting INGRID T. Nakaya (Kyoto)
Some characteristics of the extruded scintillator.
B904 Status Report by Fred B.
Presentation transcript:

MRS, TEST STAND, EXTRUDER NEWS Victor Rykalin 4/17/2019 MRS, TEST STAND, EXTRUDER NEWS Victor Rykalin Victor Rykalin

MRS inside ! 8 channels (+2 spare) has been delivered from CPTA Moscow Russia. The needed documentation is in hands. The tests are on the way (at FNAL). After the new test stand set up at NICADD NIU the R&D with MRS will be continued. 4/17/2019 Victor Rykalin

MRS parameters 4/17/2019 Victor Rykalin

Status of the new test stand. 4/17/2019 Status of the new test stand. Two crates (NIM, CAMAC) and some of the necessary modules has been shipped to lab. 6 from PREP FNAL. The vital modules (ADC and GRIB controller ) are not available at FNAL at this time. FSU agreed to lend parts till the March of 2004. The person responsible for the new test stand has to proceed with material move request and so on. What kind of software are we going to use ? 4/17/2019 Victor Rykalin Victor Rykalin

Current activity Extruder is up with 2*1 die (November 4 first run for the ME department after long interruption). Will be continued on Thursday. A new motor for the loader has been installed and tested. A new polymer coating of the hopper. Problem still exist. The PO for $1500 (Viscosity vs shear rate dependence measurements, first set) has been send. The meeting between Gary Teafoe, Mike Roman and ME department has been organized ( to clarify the set of measurements on the 2*1 cm ** die ). The comparative measurements of the BC 404, BC 408, FNAL extrusion( Ru 106 and cosmic bulk measurements ) work is in progress. For this purpose I am using the NICADD made test stand. Working with Dmitry on photosensors. New (old) PMT’s+dividers have been “spotted” at lab.6 and tested. Two trigger counters have been assembled. There is a hope that patient (trigger) will be back to normal life. 4/17/2019 Victor Rykalin

The problems and their curing. Nitrogen line Delay with ALICE tests (due to the 2*1 die running) a new hopper Talk to Jerry Blazey. To switch die as soon as possible and start with 10 holes die without pins. The decision should be taken (FNAL or other vendor or NIU). 4/17/2019 Victor Rykalin

A plan for the next two weeks.  To make happy ME DEP. with all parameters they need for the simulations.  Proceed with preliminary MRS tests at FNAL.  ?1NIM paper (proceed with some additional measurements of the scintillator bulk).  ?Probable run for the ALICE. 4/17/2019 Victor Rykalin