Internet2 Network of the Future

Slides:



Advertisements
Similar presentations
STAR TAP meeting: International Transit Network Update Heather Boyles and Steve Corbató
Advertisements

HPIIS Program Review The Internet2 Perspective Doug Van Houweling President and CEO, Internet2 25 October 2000 San Diego, CA.
Abilene and Internet2 Engineering Update Guy Almes Terena Networking Conference 2002 Limerick, Ireland Guy Almes Terena Networking Conference 2002 Limerick,
ONE PLANET ONE NETWORK A MILLION POSSIBILITIES Barry Joseph Director, Offer and Product Management.
Internet2, Abilene, and GigaPoPs: Una vista de los EE UU Steve Corbató Director, Backbone Network Infrastructure.
14 June 2015 Internet2: Today, Tomorrow and the GTRN Douglas E. Van Houweling President and CEO, Internet2 Douglas E. Van Houweling President.
03 October 2001 Internet2 International Connectivity Overview Heather Boyles Ana Preston Virtual Internet2 Member Meeting Heather Boyles.
Abilene: An Internet2 Backbone Network Greg Wood Director of Communications Internet2 ORAP Workshop 26 October 1999 Paris, France.
The Campus as key to Internet2 Engineering Atlanta Guy Almes 30 May 2000.
6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego.
Abilene Update Joint Techs Summer ’05 Vancouver, CA Steve Cotter Director, Network Services Steve Cotter Director, Network Services.
23 September 2015 Pan-Continental Perspective: Key Issues seen by Internet2 Guy Almes Heather Boyles Steve Corbató.
International Task Force Meeting March 7, a.m. to noon Washington, DC.
Next Generation Peering for Next Generation Networks Jacqueline Brown Executive Director International Partnerships Pacific Northwest Gigapop CANS2004,
8 May 2002 Abilene Update Session Steve Corbató Director, Backbone Network Infrastructure HENP Working Group Washington DC Steve Corbató Director, Backbone.
14 October 2015 Internet2: Accelerating the Development of Tomorrow’s Internet Heather Boyles Director, International Relations Internet2
 End to End Performance Initiative 1 October 2001 EDUCAUSE October 2000 Internet2 End-to-End Performance Initiative or Fat Pipes Are Not Enough.
Delivering Circuit Services to Researchers: The HOPI Testbed Rick Summerhill Director, Network Research, Architecture, and Technologies, Internet2 Joint.
Abilene update and Internet2 Network of the Future Southern Illinois University Internet2 Day Steve Corbató, Director of Backbone Network Infrastructure.
Abilene SEGP Update  Tennessee Statewide Network Planning Meeting  Heather Bruning, Abilene Program Manager May 13, 2003.
Abilene update IBM Internet2 Day July 26, 2001 Steve Corbató Director of Backbone Network Infrastructure.
Florida International UniversityAMPATH AMPATH: Pathway of the Americas Internet2 Member Meeting: International Task Force October 28, 2002 Julio Ibarra.
 End to End Performance Initiative 12 Noviembre 2001 Reunión de Otoño CUDI 2001 Internet2 End-to-End Performance Initiative or Fat Pipes Are Not Enough.
Indiana University Abilene NOC Abilene ITN Engineering Brent Sweeny Indiana University I2 member meeting, 31 Oct 2000.
Internet2 Overview Bob Riddle, Internet2 14 February 2003.
9 July 2001 Internet2 and Thai Advanced Networking Initiatives Douglas Van Houweling President and CEO, Internet2.
Internet2 Update CCIRN Meeting 8 June 2001 Stockholm.
May Global Terabit Research Network: Building Global Cyber Infrastructure Michael A. McRobbie Vice President for Information Technology & CIO Indiana.
Abilene Overview and Connectivity Options NSF-HPNC Proposal Preparation Workshop Heather Bruning, Abilene Program Manager 12 April 2002.
7 May 2002 Next Generation Abilene Internet2 Member Meeting Washington DC Internet2 Member Meeting Washington DC.
Internet2: Presentation to Astronomy Community at Haystack T. Charles Yun April 2002.
CENIC meeting May 2001 Internet2 international program Heather Boyles
26 October 2001 National Summit On Broadband Deployment Implications From Internet2.
Internet2: an update Heather Boyles Reunión de Otoño CUDI 2000 Monterrey, México 6 y 7 de noviembre.
Abilene: Everything You’ve Always Wanted to Know, but Couldn’t Find on the Web Site Brown Bag Session Heather Bruning, Abilene Program Manager 13 August.
CA*net3 - International High Performance Connectivity 9th Internet2 Member Meeting Mar 9, Washington, DC tel:
Internet2 Members Meeting Washington, DC 1 Advanced Networking Infrastructure and Research (ANIR) Aubrey Bush Division Director, ANIR National Science.
The Internet2 Network and LHC Rick Summerhill Director Network Research, Architecture, and Technologies Internet2 LHC Meeting 23 October 2006 FERMI Lab,
International High Performance Connectivity
SURFnet6: the Dutch hybrid network initiative
The Campus as key to Internet2 Engineering
Campus Focused Workshop on Advanced Networking
Internet2 Today Jane Ryland
Internet2 Focus Areas Middleware Engineering Advanced Applications
Deploying IPv6 Across the Internet2 Infrastructure
Internet2 Network of the Future
MAN LAN Update Rick Summerhill
IPv6 in Internet2 Rick Summerhill
The HOPI Project Linda Winkler Argonne National Laboratory
Internet2: an update Heather Boyles, Director, International Relations, Internet2 APAN meeting Phuket, Thailand January 22-24, 2002.
Gigapop Transport Options
Internet2 Applications and Possibilities
Internet2 Abilene Network and Next Generation Optical Networking
Internet2 Network of the Future
Next Generation Abilene
Internet2 and Health Sciences

Internet2 Network of the Future
Internet2: building the Internet of the future today!
What is Internet2? Mary Kratz, Internet2
Internet2: an overview Heather Boyles

Pfizer Internet2 Day Douglas E. Van Houweling President and CEO, UCAID
Infrastructure Update
National R&E networking infrastructure
Steve Corbató Director, Backbone Network Infrastructure Tempe
Internet2 Network of the Future
The Campus as key to Internet2 Engineering
IPv6 in Internet2 This is a general overview presentation about Internet2. Internet2 is a consortium, led by US universities, which is recreating the partnership.
Abilene Update Rick Summerhill
Presentation transcript:

Internet2 Network of the Future Steve Corbató Director, Backbone Network Infrastructure Pfizer Internet2 Day 11 January 2002 This is a general overview presentation about Internet2. Internet2 is a consortium, led by US universities, which is recreating the partnership among academia, industry and government that fostered today’s Internet in its infancy.

Internet2 Network of the Future Current state of Abilene Evolution of optical networking Next phase of Abilene 4/26/2019

Abilene focus Goals Advanced service efforts Enabling innovative applications and advanced services not possible over the commercial Internet Backbone & regional infrastructure provides a vital substrate for the continuing culture of Internet advancement in the university/corporate research sector Advanced service efforts Multicast IPv6 QoS Measurement Security 4/26/2019

Abilene background & milestones Abilene is a UCAID project in partnership with Qwest Communications (SONET & DWDM service) Nortel Networks (SONET kit) Cisco Systems (routers) Indiana University (network operations) ITECs in North Carolina and Ohio (test and evaluation) Timeline Apr 1998: Project announced at White House Jan 1999: Production status for network Oct 1999: IP version of HDTV (215 Mbps) over Abilene Apr 2001: First state education network added Jun 2001: Participation reaches all 50 states & D.C. Nov 2001: Raw HDTV/IP (1.5 Gbps) over Abilene Partnerships are the foundation of how the Internet developed and they are also a part of the foundation of Internet2. 4/26/2019

Abilene – January, 2002 IP-over-SONET (OC-48c) backbone 53 direct connections 3 OC-48c connections - NCNI will be the 4th 1 Gigabit Ethernet trial - MREN 23 will connect via at least OC-12c (622 Mbps) by 1Q02 207 participants – research universities & labs All 50 states, District of Columbia, & Puerto Rico 15 regional GigaPoPs support ~70% of participants Expanded access 37 sponsored participants 18 state education networks (SEGPs) 4/26/2019

4/26/2019

Growth in corporate participation 13 corporate research sites either on now or pending Alcatel/USA Aventis Boeing Phantom Works Ford Research Fujitsu Labs of America IBM Research (2 sites) Johnson & Johnson Research (3 sites) Microsoft Research Motorola Labs Pfizer 4/26/2019

4/26/2019

International connectivity Transoceanic R&E bandwidths growing! Key international exchange points facilitated by Internet2 membership and the U.S. scientific community STARTAP & STAR LIGHT – Chicago Pacific Wave – Seattle Abilene now has GigE connectivity to both SL and P/WAVE AMPATH – Miami New York City – GigE/10GigE EP under development CA*NET3: Seattle, Chicago, and New York CUDI: CENIC and Univ. of Texas at El Paso International transit service Collaboration with CA*NET3 and STARTAP 4/26/2019

Abilene International Peering and International Transit Network (ITN) STTL CA*net3, (AARnet) APAN/TransPAC, Ca*net3, CERN, CERnet, IUCC, NORDUnet, RENATER, REUNA2, SURFnet, SingAREN, SINET, TAnet2 , (ANSP, HARnet?) OC12 NYCM TEN-155*, JANET, NORDUnet, CA*net3 (HEAnet) BELnet SNVA GEMNET, (SINET) 13+ peers of MoU partners AmPATH STAR TAP ITN…Abilene service component LOSA SingAREN, SINET OC3-12 AmPATH (REUNA2, RNP2, RETINA?) CALREN2 CUDI UT El Paso (CUDI) 4/26/2019 * ARNES, BELNET, CESnet, DFN, GRNET, HEAnet, RESTENA, SWITCH, HUNGARNET, GARR-B, POL-34, RCCN, RedIRIS

National optical networking options 1 - Incremental wavelengths Provision 10-Gbps ’s from provider(s) in the same way that SONET circuits are done for Abilene now Exploit smaller incremental cost of additional ’s 2 - Dim Fiber Partnership with a facilities-based provider Acquisition of fiber IRU and subsequent O&M agreement for inter-PoP services (amplifiers, regenerators, DWD MUXes?) Metro condominium fiber concept on the national scale National footprint of 1-2 fiber pairs IRU for the fiber alone could cost $10-20M Most likely awaits the availability of lower-cost optical transmission equipment 4/26/2019

Future of Abilene Original UCAID/Qwest MoU amended on October 1, 2001 Extension of Qwest’s original commitment to Abilene for another 5 years – 10/01/2006 Originally expired March, 2003 Upgrade of Abilene backbone to optical transport capability - ’s x4 increase in the core backbone bandwidth OC-48c SONET (2.5 Gbps) to 10-Gbps DWDM Capability for flexible provisioning of ’s to support future point-to-point experimentation & other projects 4/26/2019

Key aspects of next backbone - I Native IPv6 Motivations Resolving IPv4 address exhaustion issues Preservation of the original End-to-End Architecture model p2p collaboration tools, reverse trend to CO-centrism International collaboration Router and host OS capabilities Run natively - concurrent with IPv4 Replicate multicast deployment strategy Close collaboration with Internet2 IPv6 Working Group on regional and campus v6 rollout Addressing architecture 4/26/2019

Key aspects of the backbone - II Network resiliency Abilene ’s will not be protected a la SONET Increasing use of videoconferencing/VoIP impose tighter restoration requirements (<100 ms) Options: Currently: MPLS/TE fast reroute Would prefer IP-based IGP fast convergence Addition of new measurement capabilities Enhance active probing Latency & jitter, loss, TCP throughput Add passive measurement taps Support of Internet2 End-to-End Performance Initiative Intermediate performance beacons 4/26/2019

4/26/2019

Regional optical fanout Next generation architecture: Regional & state based optical networking projects are critical three-level hierarchy: Backbone, GigaPoPs/ARNs, campuses Leading examples CENIC ONI (California), I-WIRE (Illinois), SURA Crossroads (Southeastern U.S), Indiana, Ohio Collaboration with the Quilt Regional Optical Networking project U.S. carrier DWDM access is now not nearly as widespread as with SONET circa 1998 4/26/2019

Conclusions Abilene future UCAID’s partnership with Qwest extended through 2006 Backbone to be upgraded to 10-Gbps in three phases starting spring 2002 Capability for flexible  provisioning in support of future experimentation in optical networking Overall approach to the new technical design and business plan is for an incremental, non-disruptive transition Follow-on network most likely will be developed around a national dark fiber facility and will utilize next generation optical transport technology 4/26/2019

For more information Web: www.internet2.edu/abilene E-mail: abilene@internet2.edu 4/26/2019

www.internet2.edu