Workshop commissioning Installation Coordination at ESS

Slides:



Advertisements
Similar presentations
Development plan and quality plan for your Project
Advertisements

Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
Risk Assessment – An Essential Standard
VETiS Moderation meetings – November 2012 Welcome to the Australian Institute of Education and Training.
Managing Accelerator Quality Matthew Conlon 13 April 2015.
Validation Copyright © 2004 Yokogawa Validation. Copyright © 2004 Yokogawa Page 2 Validation ProjectStandard Project > Validation.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
CDM Construction Design and Management
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Steve Griffith February 28th, 2017
Welcome to the FSSC Global Markets Webinar 11 September 2017, 4pm CET
Installation Procurement Package
Desk Based Preconstruction – Planning
EC project periodic and continuous reporting
Technical Scope of Work
AERODROME MANUAL.
IEEE Std 1074: Standard for Software Lifecycle
FC facilitation of Installations
RMS Overview PRI Registrar.
Construction (Design and Management) Regulations (CDM) 2015
Documentation status in WP 5 Goal: To collect all documentation/know-how needed in a structured way for the ESS installation, commissioning, operation,
Quality Management Systems – Requirements
Audit Documentation and Administration
Technical Scope of Work
RISK ASSESSMENT AND METHOD STATEMENT
[Work Order #] [ARB Date]
USNRC IRRS TRAINING Lecture18
ESHAC #9 Safety Readiness Review “Lessons learned”
EN/AS/SJAC 9101 Re-Write EN/AS/SJAC 9101 Audit Process Coordination Draft IAQG Working Group Prepared by: Tony Marino The Boeing Company Supplier Quality.
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Introduction to Software Engineering (CEN-4010)
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Mikael Jakobsson ESS Installation Manager
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Helen Boyer OHS group leader
Adaptive Product Development Process Framework
ESS Installation Binders Readiness Reviews Work Orders Mikael Jakobsson ESS Installation Manager Sep , 2018.
Installation Binder / IRR – an example
Reliability Assurance Initiative (RAI) 101
Infrastructure Project and Component Installation Accelerator Project
INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC
Testing Coordination at ESS
Receiving Inspection on incoming goods
Presenter name Presenters title
PSS verification and validation
Author Team Supervisor A. Toral M. Mansouri S.L. Birch Y.K. Sin
PSS0 Configuration Management,
Radiation Protection Handbook
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
NSS integrated installation plan workshop Introduction
High Level Readiness Reviews
MET workshop Eldin Mukovic
Accelerator NCFE Liaison Officer
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Atefeh Sadeghzadeh Control engineer – Target safety and control
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Acc Collaboration board Trieste
Workshop: Equipment June 29, 2006.
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Workshop commissioning 2018-10-16 Installation Coordination at ESS Olle Lagerblad

Agenda AD installation Project (Infrastructure and Component installation) Harmonized ways of working at ESS Outline The Installation Binder ”Practical Use” The Installation Readiness Review (IRR) The RAMS ”Practical Use” ESS Work Orders ”Mandatory for all installation work”

Introduction “Project changes over time” The project consist of mainly 2 high level phases Engineering phase Construction phase Design and planning AD Project WP x -------------------------- WP z Installation & Commissioning AD Project Installation Commissioning Mainly Installation and commissioning focus Components matrixed for installation and testing Mainly component focus Installation & Commissioning matrixed

Implementation “Daily stand up” meetings in the buildings “Daily” meeting in “installation room” Principal agenda Plan/Comply or explain deviation/Issues (meetings outside) Weekly Meetings Installation detailed working and follow up meetings (weekly) Detail planning and organization of installation activities Service needs (eg. transportation, storage, tools, workshops) Installation binder Commissioning Installation and commissioning meeting “Information” (Friday) Share information General presentations Status updates Safety /quality aspects Issues solved/new

Harmonized ways of working at ESS

Introduction ESS is implementing harmonized ”ways of working” Installation binder (IB) and Installation Readiness Review (IRR) Risk Assessment and Method Statement (RAMS) The Work Order process (WO) NCR (Non Conformity Report) Services and support Information can be found at ESS Installation web page https://confluence.esss.lu.se/category/essinst

ESS Installation Services

Interface between In Kind, ESS WP and Installation Package lead AD installation coordinator IK partner Installation package lead AD Work package lead AD Liaison Officers Responsible for; Installation binder IRR Work order NCR

Installation Binder Purpose Collect all required documentation to perform site work Gathers documentation prepared before and during installation There is a template, if tab is not applicable N/A The installation Scope can be split into several IB, depending on: Time for the installation - If the installation is performed in different time periods it may be better to create separate binders Area - If the work is done in different areas of the building it may be better to create separate binders Disciplines / Contractors - If there are several contractors and/or disciplines involved in the installation, it may be better to do separate binders for each contractor (As electrical, mech. or piping)

Input from Design / Manufacturer Preparation of Installation Binder Check by: Discipline Lead Engineer QC Engineer IRR

Preparation of Installation Documentation Input from Design Preparation of Installation Binder IRR Reviewed by: Discipline Lead Engineer QC Engineer

Preparation of Installation Documentation Pre Job Briefing Perform Installation Test & Inspection Installation Certificate of Compliance TRR SRR

ESS Work Orders The Work Order (WO) control the release of work and work/safety some aspects are: No work shall be executed unless it is planed and organized Synchronize the work with other parallel work (same area) To control plant conditions and equipment To plan and organize delimitations and tag outs “becomes more and more important when entering in to the test and commissioning phase!” The Work Order will mainly state: Installation activity start and end time Summary of the activity Documents related to this activity (RAMS) Any need for delimitations/tag outs https://jira.esss.lu.se/servicedesk/customer/portal/11

Registering WOs Minor work 6 fields + RAMS (attached) Normal work 6 fields + link to installation Binder

Risk Assessment and Method Statement (RAMS) What’s the purpose with a RAMS? Identify hazards and associated risks for an activity and determine if sufficient controls are in place (to reduce the risks to an acceptable level) Who is responsible for preparing the RAMS? Installation Package Lead for making sure it’s prepared. What does a RAMS consist of? The RAMS consists of two parts: A method statement, i.e. a detailed break down/description of the work to be carried out and material to be used to perform this task A risk assessment, i.e. identify the risks associated to the work steps detailed in the method statement. Including adjacent risk.

Questions?