Supervisor: Eng. Mohammad abu neama

Slides:



Advertisements
Similar presentations
Section 12 Under Construction. Your role as the owner What to expect at the preconstruction meeting Dos and Dont during construction How to handle change.
Advertisements

Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
PROCEDURES FOR SELECTING THE CONTRACTOR
1. Definition of a Reconciliation 2. Importance of a Reconciliation 3. When to Prepare a Reconciliation 4. Items Needed to Prepare a Reconciliation 5.
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Abdallah M. Al-Mahasheer
Accounting Specialist Basic Functions : To provide essential data by computing and distributing collections to their respective allocations. Knowing the.
1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.
© 2015 albert-learning.com Marketing Research Process MARKETING RESEARCH PROCESS.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Construction Project Management
Joint Venture in construction company in West Bank.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
Specification & Quantities Estimating
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
King Fahd University of Petroleum & Minerals
Best Value Public Works Procurement September 7, 2007.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Measuring Palestinian labors productivity Rates for Block, Steel and excavation works Measuring Palestinian labors productivity Rates for Block, Steel.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
By Dr Hidayathulla Shaikh. Objectives  At the end of the lecture student should be able to –  Define survey  Mention uses of survey  Discuss types.
Unit 6: Report Writing. What is a Report? A report is written for a clear purpose and to a particular audience. Specific information and evidence is presented,
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
Work shop on Procurement Key-performance indicators with selected implementing entities Public procurement and property administration agency August 2016.
Cost Overrun in Construction Projects Supervisor : Eng.Reema Nassar.
Research and Evaluation
The Value of a Knowledgeable Construction/Surety Attorney
Claims in Construction Projects
Causes of Disputes Prepared by : Ali Jamous Jasser Dwiekat
Using Games to Effect Organizational Change
Measuring Palestinian Labors Productivity
Arbitration as a Dispute Resolution Technique in Construction Projects
Variation Orders By: 1.majed bushnaq 2.mahmoud battat
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Training for the Work-Study Supervisor
Reality of Highway Construction Equipment in Palestine
Administration of a FIDIC Contract - Pre-Contract Phase -
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Causes of Contractors’ Failure “ North West Bank” Graduation Project
PROCESS IMPROVEMENT OF AL-REYAD COMPANY
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
An-Najah National University
Chapter 3: risk measurement
Under supervision of: Eng. Reema Nassar
ENGINEERING MANAGEMENT (GE 404)
About Market Research Making a Questionnaire
Introduction to Marketing Research
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Causes Of Contractors’ Failure In West Bank
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Incident Reporting And Investigation Program
Basic Research Terms Research—the process of finding information relevant to a particular topic Source—any medium that provides information relevant to.
Product Development Scenario Overview
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
An - Najah national university Civil engineering department
Claims during contracts and the idea of the Claim Institution
Developing and using questionnaires
105 Indiana Administrative Code Article 13
Faculty of Industrial Management CONCLUSIONS AND RECOMMENDATION
Zimbabwe 2008 Critical Thinking.
Factors Affecting Bid/No Bid Decision Making IN The West Bank
‘ Causes of Delay During Construction Phase at Palestine ’
Directed Change Constructive Change
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Supervisor: Eng. Mohammad abu neama Construction Claims By Raya Jaber Tasnim Bany Jaber Tala Aydi Supervisor: Eng. Mohammad abu neama

Outline Introduction Definition Methods to resolve construction claims Objectives Methods to resolve construction claims Statement of the problem Methodology Data analysis Conclusion Recommendation

Introduction Managing construction projects with standards and specifications plays a fundamental role in construction projects. Expectations of parties may be disappointing and disputes may arise at any time between the first bid and the last bill of the project.

Definition construction claims are defined as a request from one party to another for adjustment because of change under the contract terms. Parties involved in construction claims are, owner, contractor and designer.

Resolve Construction Claims

Statement of the problem Construction projects in Palestine suffer from many problems, which result in extension beyond budget and time. Because of these problems, construction claims occur. In this project, an identification of the most important causes of construction claims were determined in order to avoid them.

Project objectives Determination of the impact of claims on construction which are time, cost and quality in Palestine. Identification of the party that is responsible for each cause. Identification the most important causes of issuing construction claims in Palestine.

Methodology

Data Analysis In order to achieve the project objectives, data was collected and analyzed using likert scale and Microsoft Office Excel.

Questionnaire Questionnaire template was prepared as a part of this research and distributed over two parties, owner and contractor. The questionnaire consists of three sections, each section aims to gather different information.

Questionnaire Pilot test It is a preliminary study conducted in order to evaluate questionnaire template to get a final, error-free, and clear template. Ways to send questionnaires E-mail. Transmission by hand.

Contractors’ sample Data was analyzed from each party’s point of view From this figure, it is shown that only 58% of respondent have responded.

Work experience Because of high level of experience it is expected that the data will be more accurate and reliable.

Classification of contractor company Most of contractors companies in Nablus are classified from first to third degree

Average number of issuing

Impact of issuing claims on the project Increase in the cost of the project to the owner has the greatest impact, and the second impact is delay in completion the project.

common way to solve claims Negotiation method is considered as a cheap and saves time.

Identifying the responsible for each cause Data was analyzed and each cause was allocated for the party who is responsible for it. In this part of questionnaire, the weighted stake (measured by no. of ticks) of each cause was calculated and allocation made to the party with the highest weight that is 33% or more.

Causes of claims and the degree of occurrence

Causes of claims and the degree of occurrence cont.

Causes of claims and the degree of occurrence cont

Conclusion In conclusion, there is a significant difference perspectives between both owner and contractor. This is because an owner expects that the project will be completed within its established schedule and within its cost.

Conclusion However, a contractor try to complete the project though there is always a probability of obstacles facing any project naturally.

The designer should prepare Recommendation Detailed drawing Bill of quantities specifications General conditions Private conditions The designer should prepare

Recommendation Employ qualified engineers Give authority to approve the drawings and samples. Make sure that the fund is available

Permits License Approvals required Detailed drawings Budget Tender is ready

Recommendation Check all site conditions, especially the soil reports. Make sure that the specification of materials that needed are clear Clear bill of quantities and specification.

Hope you enjoy our presentation, and if you have any questions, please don't hesitate