Poswillow Suite, Children's Dental Unit

Slides:



Advertisements
Similar presentations
Hospital of the Future Construction Update as of Dec. 3, 2010.
Advertisements

Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Rapid Admission of Palliative Patients. Hospital Macmillan Specialist Palliative Care Nurse. Lung Cancer Specialist Palliative Care Nurse. September 2008.
Skyscraper Construction
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
 What are some of the important benefits that Mountain View Community Hospital should seek in using databases? As much as possible, relate your response.
We appreciate your co-operation during our works and any guidance you provide to help us minimise the impact we make on your lives will be gratefully received.
Facilities Maintenance Department LtCol Todd A. Kerzie Facilities Maintenance Officer (760) 725 – 3807 Mr. Jeff Hunt Maintenance Control Director Marine.
Phlebotomy Technician Medical Lab Assistant Medical Lab Technician Medical Technologist/Clinical Lab Scientist.
RMIS Engineering At RMIS Engineering we specialise in Mechanical Engineering Contracting and Fabrication works to serve a wide range of industries in Carbon/Mild.
EMERGENCY MEDICAL EVALUATION DESCRIPTION  Respond to emergency situations which arise in the vaccination clinic: assess the condition of the patient and.
Supporting Paramedics in Challenging Environments: Elliot Lake and Other Places Dr. Michael Feldman Sunnybrook Centre for Prehospital Medicine May 16,
* Fortis Institute, Houston North * 450 N. Sam Houston Parkway E. Suite 200 Houston, TX
MEDICAL GAS SYSTEMS Uganda Experience - By Joel O. Akabway Biomedical Engineer, Biomed Systems Centre Ltd, Ntinda the right Connection.
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
Joanne Macgregor C Lund & Son Ltd March 2016
Pre-Contract Cost Control
UTILITIES MANAGEMENT.
Western Michigan University Central Power Plant
Who pays for today’s healthcare?
1, sq m (20,067 sq ft) Property Highlights
How Completed Interiors Are Achieved: Designing & Building
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Central Venous Access Device (CVAD) Workshop
Discharge Planning and Transition to Home
John Fletcher-Cullum BSc (Hons)
Construction (Design and Management) Regulations (CDM) 2015
Pre-Contract Cost Control
Best Dental Clinics in Hyderabad
A. Datum Corp. Bid package overview.
QMC Nottingham - Refurbishment works to Wards A23 & B50
14 High Leys Drive, Ravenshead, NG15 9HQ
Comprehensive Program Review September 27, 2013
20 Chestnut Drive, Mansfield
The Beehive House, Castledine Street, Loughborough
6 MMC (Off Site Production)
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Field House, Car Colston
The Hollies, Ravenshead
Spire Hospital, Dunedin
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
The Acorn Medical Practice, Wood Street, Mansfield
Value of contract: Length of contract: Contract start date:
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
Dental Bridges Replacement Teeth
Furnishings/Fixtures (five required)
PKL INVESTMENTS LTD Value of contract: Length of contract:
Prepared by HR Department
Ashfield District Council Disabled Facilities Adaptations
Instruments Shielding Project Installation
Coppice Ridge, Fiskerton, Newark
Eaton MEDC, Sutton-In-Ashfield
Value of contract: Length of contract: Contract start date:
Community Practice Asset Management.
Value of contract: Length of contract: Contract start date:
Presentation transcript:

Poswillow Suite, Children's Dental Unit Value of contract: Length of contract: Contract start date: Completion date: £450,000 5 months January 2015 May 2015 Works/services provided: Asbestos removal Internal demolition Structural alterations and support Complex mechanical, electrical & ventilation Installations BMS & medical gases Suspended ceiling replacement Heavy duty flooring & finishes Detailed description of contract: Involving the strip out and alteration of an existing ‘central treatment’ facility located centrally on the second floor. The works involved complex mechanical and electrical installations and forming openings through the roof and structural floor slabs to route new ductwork and the like. New air handling equipment was lifted onto the roof by crane and positioned onto a structural steel frame. Medical gases and building management systems were installed and commissioned by approved specialists. The project was completed in a ‘live’ Hospital environment and its success relied heavily upon constant communication with the client team and clinical staff. Particular challenges to be overcome: Contact details: Working alongside live hospital wards Co-ordinating personnel and material movements around patients and the general public Out of hours ‘Crane-lift’ to place heavy mechanical plant on the roof of the hospital Mr. Nick Wright Department of Estates and Facilities Rotherham General Hospital Moorgate Road Rotherham S60 2UD