Ian Evans SSRL Safety Office

Slides:



Advertisements
Similar presentations
EMS Checklist (ISO model)
Advertisements

2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
SIEP HSE Management System
Contractor Safety Management
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
1 Michael Scharfenstein 1 Environment, Safety and Health CXI Final Instrument Design Review, June Mike Scharfenstein ES&H.
Safety Oversight for SLAC Accelerator Department Operations
Michael Scharfenstein FAC April 7, 2005 LCLS ES&H Process and Documentation.
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
M. Scharfenstein - ES&H Coordinator 8 June 2009
OH&S Management System
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the.
Science What is “Safety” Freedom from danger Safety is the condition of being protected against failure, breakage, error, accidents, or harm. (Protection.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Environmental Management System Fermi National Accelerator Laboratory.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Health and Safety Policy
Safety Culture Improvement Program At LBNL Mike Ruggieri and Arthur Patterson LBNL Safety Culture Work Group Presentation to the Communications Council.
Unit 6 Personnel Roles and Responsibilities & Safety Program Development and Management Chapter 9 and 10.
Hazards Identification and Risk Assessment
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 Team Based Program Design Management and Research Operations Involvement in Nanoscale Materials ES&H.
Indiana Regional Sewer District Association October 26, 2015.
Program Mangers Cross Training Presentation Programs Program Manager Name Date of Presentation Template.
Environmental Officer Course Introduction Fort Wainwright, Alaska Environmental Officer Course 2011 Name//office/phone/ address UNCLASSIFIED 12/24/2015.
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
OHSAS Occupational health and safety management system.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Engineering Environment Awareness
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Overview of FESHCom Subcommittees Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.

Pipeline Safety Management Systems
DOE Accelerator Safety Workshop 2017 Bob Lowrie
OH&S Management System
Safety Configuration Management Process at JLab
LCLS-II ES&H Requirements: Subcontractors
Planning for Succession
Principles of Good Governance
Health and Safety Policy
Accelerator Operations Department Readiness (Part 2)
An Integrated Risk Management & Safety Program: IRMSP
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Safety Accountabilities
OH&S Management System
BU IS GIG Chemical, Oil & Gas
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Safety is part of our culture at Halliburton
Roadmap to COR.
Injury and Illness Prevention Program (IIPP)
Safety Management System Implementation
M. Scharfenstein - ES&H Coordinator 14 May 2009
Integrated Safety and Environmental Management
ESS Handbook for Radiation Protection
Environment, Safety and Health
DOE Review of the LCLS Project October 2006
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Safety Program for LCLS Experiments
Performance based planning and programming
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Ian Evans SSRL Safety Office 650-926-3110 LCLS ES&H Ian Evans SSRL Safety Office 650-926-3110

What is Safety? An organized and managed process that: Identifies and appraises hazardous conditions and practices Develops hazard control methods, practices and programs to mitigate risk Communicates hazard control information through training and education Measures the effectiveness of the controls employed and fine tunes as necessary The role of safety is not to remove the symptom, but to find out what is wrong with the system

Why its in place To reduce and prevent incidents that have an adverse effect on personnel and the environment. To promote good morale through commitment from management. It saves: Resources Time Money

Safety at SLAC The responsibility for safety and for complying with ES&H regulations and standards at SLAC belongs to the line organization. Citizen committees and the ES&H Division support the line organizations in this enterprise. The SLAC Safety Overview Citizen Committee coordinates and assigns safety reviews of new projects and offers an independent review of projects (subsystems) by peer review (Citizen Safety Committees) Committee(s) assigned to review the project give their approval before the activity can proceed.

Peer review process SLAC Peer review process: Receive project Fact Sheets for new projects, describing the undertaking and its associated hazards. Meet with relevant safety representatives to discuss safety questions. Create short-term committees, as appropriate, to address safety problems not covered by the existing committee structure. Issue formal approval when all safety questions are satisfactorily resolved.

Integrated Safety Management System (ISMS) Integrated Safety Management System (ISMS) at SLAC Achieving the scientific mission is based on: Maintaining a respectful workplace which promotes and supports the value of each individual Maintaining excellence in matters of environmental concern and providing for the safety and health (ES&H) of the SLAC staff, users and the general public

ISMS Integration 7 Guiding Principals A comprehensive set of best management practices, fundamental to developing, maintaining and promoting a viable scientific program

ISMS Integration

ISMS Integration - System 5 Core Functions Define scope of work CDR - Project Execution Plan Analyze hazards PSAD, SAD, Ongoing System & Sub-System Reviews Develop and Implement Hazard Controls Engineered - shielding, interlocks, etc. Administrative - Procedures, Operating Documents, etc. Personal Protective Equipment.

ISMS Integration - System Perform work with controls Procedures, manuals, permits, Work Smart Standard set Feedback and continuous improvement. Oversight, regular meetings with system managers, line discussions, system test and certification

ISMS Integration – Personnel Job Hazard Analysis and Mitigation Routine and Non-Routine tasks require review Employee Training Assessments Develop training plan based on work and hazards

Accountability Defined roles and responsibilities Strong safety culture at SLAC Flexible to changing needs Active management of ES&H program (resources available, management support) Dedicated ES&H staff reporting directly LCLS Director and Project Manager. Access to SLAC ES&H Division support and expertise.

Reviews Safety Overview Committee Start of the peer review process and early identification of citizen committees that may need to be involved: Earthquake, Electrical, Radiation, Environmental etc. DOE Review of the LCLS design – April, 2002 External Independent Review (EIR) June, 2004

Where are we now? Conceptual Design Report – ES&H Chapter and Radiation Considerations Section complete Environmental Assessment is complete FONSI issued Preliminary Hazards Assessment is complete Hazards are consistent with those already identified in the Work Smart Standards set and are routinely encountered at SLAC. One exception – tunnel safety Draft Preliminary Safety Assessment Document

Ongoing Activities Recruit full time ES&H person for LCLS Division – position identified and funded Commence Fire Hazards Analysis Complete PSAD and expand into FSAD Develop construction Safety Plan Integrate Accelerator Readiness Review into life of project

Concerns Ensure ISMS is fully integrated into the project and that the management structure supports ES&H. Multi laboratory involvement poses unique communication challenges That SLAC ES&H structure can support a project of this magnitude without endangering other programs or projects Early involvement leads to a better understanding of project demands and more time to complete specific tasks

Conclusion The process to identify, analyze and mitigate hazards at SLAC is firmly in place SLAC, SSRL and LCLS have provided resources and commitment for a strong ES&H program Outside of ES&H issues related to the tunneling aspect of the project, early analysis leads us to conclude that during the design, fabrication, installation, testing and operation of the LCLS, no new hazards will be introduced to the SLAC site.