TGT September 2005 Closing Report

Slides:



Advertisements
Similar presentations
LB84 General AdHoc Group Sept. Closing TGn Motions
Advertisements

LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
IEEE WG Status Report – July 2005
London TGu Motions Authors: January 2007 Date: Month Year
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
TGT November 2005 Closing Report
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
TGp Closing Report Date: Authors: May 2007 Month Year
TGu Timeline Date: Authors: March 2006 March 2006
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Timeline Date: Authors: January 2005 January 2005
TGv Redline D0.06 Insert and Deletion
TGu Timeline Date: Authors: July 2005 July 2005
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
TGn Closing Report – November 05
TGu-changes-from-d0-01-to-d0-02
September Opening Report
TGu Timeline Date: Authors: May 2006 May 2006
LB73 Noise and Location Categories
Requirements for TGT Proposals
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
TGT May 2006 Closing Report Date: Authors: May 2006
TGu Timeline Date: Authors: May 2006 May 2006
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGp Closing Report Date: Authors: March 2007 Month Year
November Opening Report
TGr Proposed Draft Revision Notice
TGT January 2007 Closing Report
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
Beamforming and Link Adaptation Motions
[ Policies and Procedure Summary]
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
TGu Timeline Date: Authors: May 2006 May 2006
TGT January 2006 Closing Report
Motion to go to Letter Ballot
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
TGT November 2005 Closing Report
TGu Timeline Date: Authors: May 2005 May 2005
TGT July 2005 Closing Report
TGu Timeline Date: Authors: July 2005 July 2005
PSMP Adhoc Oct TGn Adhoc
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Timeline Date: Authors: July 2005 July 2005
TGT March 2006 Closing Report
TGT May 2006 Closing Report Date: Authors: May 2006
TGr Proposed Draft Revision Notice
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

TGT September 2005 Closing Report doc.: IEEE 802.11-05/938r0 Sept 2005 TGT September 2005 Closing Report Date: 2005-09-23 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart.kerry@philips.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Charles R. Wright, Azimuth Systems, Inc. C. Wright, Azimuth Systems

TGT Wireless Performance WG Report Sept 2005 TGT Wireless Performance WG Report Charles R. Wright, Azimuth Systems, Inc.

TGT Report Total meeting time: 14 hours scheduled and 12 used Plans: Sept 2005 TGT Report Total meeting time: 14 hours scheduled and 12 used Plans: Appoint permanent secretary… Technical presentations and proposals related to: RF test environments, metrics, application performance, device operating environments, device configuration Review of Draft D0.3; approval of any changes Charles R. Wright, Azimuth Systems, Inc.

Progress during the week September 2005 doc.: IEEE 802.11-05/938r0 Sept 2005 Progress during the week Heard 10 presentations Developed and approved a TGT process document See 11-05/911r1 Accepted one proposals for inclusion into the draft 11-05/759r1, “ACI Test Methodology” Next version of the draft will be D0.4 Reviewed TG timelines Now planning for 1st LB after July 2006 meeting Developed schedule for work to be carried out on teleconferences Still no permanent secretary Thanks to Marc Emmelman for volunteering for the week Charles R. Wright, Azimuth Systems, Inc. C. Wright, Azimuth Systems

Presentations / Proposals September 2005 doc.: IEEE 802.11-05/938r0 Sept 2005 Presentations / Proposals 11-05/0943r0, “Conducted power and sensitivity measurements”, M. Foegelle 11-05/0949r0, “Document Framework Section”, F. Pirzada 11-05/0887r0, “Video Testing Strategy”, P. Corriveau 11-05/0874r0, “Methodology, metrics and test cases measuring FBT performance”, S. Bangolae 11-05/0950r0, “Methodology, metrics and test cases measuring BSS Transitions performance”, C. Trecker 11-05/0758r1, “ACI Test Methodology”, D. Victor (proposal text: 11-05/759r1) 11-05/0944r0, “OTA TRP and TIS testing”, M. Foegelle 11-05/0951r0, “Streaming Media Performance”, F. Pirzada 11-05/0949r0, “Latency Sensitive Application Metrics”, S. Bangolae 11-05/1009r0, “Near Horizon Partial Solid Angle Metrics”, M. Foegelle 11-05/0938r0, TG closing report (this document) 11-05/0937r0, TG meeting slides 11-05/0955r0, TG minutes, when available Charles R. Wright, Azimuth Systems, Inc. C. Wright, Azimuth Systems

Telconferences Planned Sept 2005 Telconferences Planned TGT is asking for a WG motion to approve teleconferences conducted on selected Thursdays between now and the July meeting Will be presented in the blanket telecon motion Dates: 6 October, 20 October, 3 November 2005 12 noon US Eastern Time Phone info to be posted on reflector First telecon will be Oct 6th Charles R. Wright, Azimuth Systems, Inc.