November , 2018 State Roundtable Reports Pennsylvania

Slides:



Advertisements
Similar presentations
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel November 25, 2013 Patrick Daly.
Advertisements

Independent Spent Fuel Storage Installation (ISFSI) Dry Cask Storage NUCP
Interim Storage of Used Nuclear Fuel February 2008.
February 26, August 27, 2013 Entergy announces it will cease operations December 29, 2014 Permanent Shutdown April 2016 Implement.
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Overview of State Decommissioning Activities April & May 2015 (Mostly from a VT Public Service Department Perspective) Presented by Tony Leshinskie, VT.
Nuclear program of Lithuania Dr. Vidas Paulikas, Radiation Protection Department VATESI Visaginas, 29 June 2009.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. Gerard van Noordennen September 29, 2014.
California Energy Commission James Madigan April 27, 2015.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Radiological Emergency Response Plan (RERP) Emergency Planning Overview- Now and in the Future Vermont Division of Emergency Management and Homeland Security.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
September 24, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee (ENVY)
1 LICENSING A U.S. GEOLOGICAL REPOSITORY WILLIAM BORCHARDT Executive Director for Operations U.S. Nuclear Regulatory Commission.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager June 8, 2015.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Overview of State Decommissioning Activities September 2015 Tony Leshinskie VT State Nuclear Engineer September 24, 2015 NDCAP Meeting.
1 Status of Ongoing Rulemakings and Safety Culture Update Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking OAS Annual.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Nuclear Safety & Nuclear Security Synergy By Dr. Lucian BIRO Director General ROMANIA National Commission for Nuclear Activities Control International.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
November 12,  As of September 30, 2015, the ENVY NDT Balance was $595,733,175 ◦ Changes in the NDT are due to market losses/gains, reimbursement.
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
LTP and FSS Plan Project Status Overview Presented by Bill Barley September 28, 2015.
RESPONSIBLE – ACCOUNTABLE – TRANSPARENT – DEMOCRATIC Overview Of CAN-NIRS Comments Tim Judson Nuclear Information & Resource Service Contact: (301)
1 Kelli Gallion, Southern California Edison Tom Amabile, San Diego County Janell Harriman, Orange County Sara Kaminske, Orange County.
Vermont Yankee- The Last Yankee Standing Bev Good Entergy Nuclear- Sr. Project Manager Boston, MA July 29,
Vermont Yankee. Boiling Water Reactor Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager February 22, 2016.
ISOE-Europe 3/25/04 1 San Onofre Unit 1 Decommissioning Eric M. Goldin Eric M. Goldin Southern California Edison Company.
Oyster Creek [Exelon Nuclear] Oyster Creek: Operated at power Scheduled Maintenance Outage April 24 – May 13 NRC Assessment (ROP Action Matrix): Licensee.
Decommissioning San Onofre
Status Update on the NRC Proposed Rule to Amend 10 CFR Part 61
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
Decommissioning Issues
Emergency Preparedness During Decommissioning
3 Yankee Companies and National Spent Nuclear Fuel Issue Update
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
John Christian President, Logistics, Processing and Disposal
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
3 Yankee Companies Update and Perspective on SNF Issue
Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI)
Vermont Yankee Decommissioning Update
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Spent Nuclear Fuel and Waste Disposition Program Update
Joseph D. Anderson, Chief
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
3 Yankee Companies and National Spent Nuclear Fuel Issue Update
CR3 and Crystal River Energy Complex
Nuclear Waste Storage Current Status and Plans
West Valley Demonstration Project Status Update
SONGS Past, Current, and Future State May 4, 2016
Possible Transition from Operating to Decommissioning
Tom Wolf, Governor Patrick McDonnell, PA DEP Secretary
Decommissioning Rulemaking
Low-Level Radioactive Waste Program Update
Air and Waste Management Association Energy Updates
Northeast High-Level Radioactive Waste Transportation Task Force
Low-Level Radioactive Waste Program Update
Nuclear Decommissioning Citizens Advisory Panel (NDCAP) Certificate of Public Good (CPG) – Second ISFSI Pad & New 200 kW DG May 28, 2015.
Nuclear Energy Programme Implementing Organisation
National Position.
House Environmental Committee Testimony
Presentation transcript:

November 28 - 29, 2018 State Roundtable Reports Pennsylvania Northeast High-Level Radioactive Waste Transportation Task Force Meeting November 28 - 29, 2018 State Roundtable Reports Pennsylvania Patrick McDonnell, Secretary Tom Wolf, Governor

Transportation of Radioactive Materials - Escort Policy - Canadian Shipments - Isotope Crossroad Tabletop Exercise Revision to Radiological Emergency Plan Transition from Full EPZ PAR to a Keyhole PAR OPTIONAL STATEMENT: This allows the radioactive elements in components to decay to stable elements while the trust fund accrues interest. 21

Real-Time Radiation Monitoring Pilot Plan Update on PA Nuclear Power Plant - NRC Assessment - License Renewal - Independent Spent Fuel Storage Installation - Plant Closure Announcements OPTIONAL STATEMENT: This allows the radioactive elements in components to decay to stable elements while the trust fund accrues interest. 21

TMI Decommissioning Transition Milestones SAFSTOR & DECON Site Restored Phase 1 30 Days Phase 2 ≤18 Mos Phase 3 ≈ 5 Yrs Phase 5 ≤60 Yrs T-2 Yrs T-0 Phase 4 Permanent Shutdown Decision Announced Permanent Shutdown Milestones Phase 3 – End of Zirc Fire to Fuel Pool Empty Phase 4 – Fuel in ISFSI to license termination Phase 2 – End of Zirc Fire Window Phase 5 –Site Restoration DTO Staffed ≈18 people Phase 1 - Defueled “Decommissioning” The station intends to keep full staffing through September 2019. During the 18 months following the shutdown, there will be several staffing reductions at the site. The goal is to provide other opportunities throughout the company for as many employees as possible. Timeline for the project: 1. Bids will be accepted in 2017/2018. New Fuel Handling Building Crane will be installed in 2019/2020. January 2020 – Defueling would begin. 4. Pad Construction will begin in 2019/2020. 5. ISFSI pad will be ready to accept dry casks in 2021/2022. Approximately 2024 – Fuel is all in dry cask storage and there is no longer a need for Emergency Preparedness. *Security would still be required for the dry cask storage. Implement EOL Exceptions Implement Decommissioning Project Plan May 30, 2017 Sept. 30, 2019 18

Questions? Rich Janati rjanati@pa.gov (717) 787-2163